Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19249D828 + (ML19249D828)
- ML19249D829 + (ML19249D829)
- 05000267/LER-1979-030, Forwards LER 79-030/03L-0 + (ML19249D830)
- ML19249D831 + (ML19249D831)
- 05000272/LER-1979-058, Forwards LER 79-058/01T-0 + (ML19249D832)
- ML19249D833 + (ML19249D833)
- ML19249D834 + (ML19249D834)
- ML19249D836 + (ML19249D836)
- 05000267/LER-1979-030-03, /03L-0:on 790821,primary Coolant Oxidants Exceeded Limiting Condition for Operation.Caused by Offline Helium Dryer Drying Out Operations & Extended Regeneration Period. Core Outlet Temps Reduced Whenever Oxidant Limits Excee + (ML19249D837)
- ML19249D838 + (ML19249D838)
- 05000272/LER-1979-058-01, /01T-0:on 790907,util Informed That Conditions Associated W/High Energy Line Breaks Inside or Outside Containment & Impact on Nonsafety Control Sys May Comprise Unreviewed Safety Question.Investigation Continuing + (ML19249D839)
- ML19249D841 + (ML19249D841)
- ML19249D843 + (ML19249D843)
- ML19249D844 + (ML19249D844)
- 05000267/LER-1979-031, Forwards LER 79-031/03L-0 + (ML19249D845)
- ML19249D846 + (ML19249D846)
- ML19249D847 + (ML19249D847)
- ML19249D848 + (ML19249D848)
- 05000267/LER-1979-031-03, /03L-0:on 790821 & 0830,plant Operated W/Reactor Dewpoint Outside Tech Spec Limits.Caused by Helium Dryer Bypass,Due to Faulty Time Delay Relay.No Cause for 790821 Event.Relay Replaced & Tested + (ML19249D849)
- TXX-3045, Forwards Joint Ownership Agreement for Facility & Tx Municipal Power Agency Bond Approval.Rural Electrification Administration Loan Commitment Will Be Forwarded at End of Month + (ML19249D851)
- ML19249D852 + (ML19249D852)
- ML19249D853 + (ML19249D853)
- ML19249D854 + (ML19249D854)
- ML19249D856 + (ML19249D856)
- ML19249D857 + (ML19249D857)
- ML19249D858 + (ML19249D858)
- ML19249D860 + (ML19249D860)
- ML19249D861 + (ML19249D861)
- ML19249D862 + (ML19249D862)
- ML19249D863 + (ML19249D863)
- ML19249D864 + (ML19249D864)
- 05000302/LER-1979-081, Forwards LER 79-081/03L-0 + (ML19249D865)
- ML19249D866 + (ML19249D866)
- ML19249D867 + (ML19249D867)
- 05000302/LER-1979-081-03, /03L-0:on 790823,control Complex Deluge/Sprinkler Sys Inoperable,Contrary to Tech Specs.Caused by Unauthorized Closing of Fire Svc Valve FSV-89.Valve Immediately Opened & Sealed + (ML19249D868)
- ML19249D869 + (ML19249D869)
- ML19249D870 + (ML19249D870)
- 05000267/LER-1979-029, Forwards LER 79-029/03L-0 + (ML19249D871)
- ML19249D872 + (ML19249D872)
- ML19249D873 + (ML19249D873)
- ML19249D874 + (ML19249D874)
- 05000267/LER-1979-029-03, /03L-0:on 790819,during Plant Startup,B Instrument Air Compressor Became Inoperable.Caused by Failure of Discharge Feather Valve.All Discharge Valves on Compressor Replaced & C Air Compressor Returned to Svc + (ML19249D875)
- ML19249D876 + (ML19249D876)
- ML19249D877 + (ML19249D877)
- ML19249D878 + (ML19249D878)
- ML19249D879 + (ML19249D879)
- ML19249D880 + (ML19249D880)
- ML19249D882 + (ML19249D882)
- ML19249D884 + (ML19249D884)
- ML19249D885 + (ML19249D885)
- ML19249D887 + (ML19249D887)