Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19249D770 + (ML19249D770)
- ML19249D771 + (ML19249D771)
- ML19249D774 + (ML19249D774)
- ML19249D775 + (ML19249D775)
- ML19249D777 + (ML19249D777)
- ML19249D778 + (ML19249D778)
- ML19249D779 + (ML19249D779)
- ML19249D780 + (ML19249D780)
- ML19249D781 + (ML19249D781)
- ML19249D782 + (ML19249D782)
- ML19249D783 + (ML19249D783)
- ML19249D786 + (ML19249D786)
- ML19249D787 + (ML19249D787)
- ML19249D789 + (ML19249D789)
- ML19249D791 + (ML19249D791)
- ML19249D793 + (ML19249D793)
- ML19249D795 + (ML19249D795)
- ML19249D796 + (ML19249D796)
- ML19249D797 + (ML19249D797)
- ML19249D798 + (ML19249D798)
- 05000333/LER-1979-050, Forwards LER 79-050/03L-0 + (ML19249D799)
- ML19249D800 + (ML19249D800)
- ML19249D801 + (ML19249D801)
- 05000317/LER-1979-047-01, /01X-0:on 790914,air Start Sys Hangers Found Not Meeting Seismic Requirement.New Hangers Will Be Installed Meeting Seismic Requirements in Approx 5 to 7 Days + (ML19249D804)
- ML19249D805 + (ML19249D805)
- ML19249D806 + (ML19249D806)
- ML19249D807 + (ML19249D807)
- 05000325/LER-1979-063, Forwards LER 79-063/03L-0 + (ML19249D808)
- ML19249D809 + (ML19249D809)
- 05000333/LER-1979-050-03, /03L-0:on 790828,during Offgas Process Radiation Monitor Instrument Functional Test,Recorder Did Not Respond to Reading Indicated on Channel a Radiation Monitor. Caused by Faulty Calibrator.Recorder Recalibr + (ML19249D810)
- 05000325/LER-1979-063-03, /03L-0:on 790824,daily Core Parameter Check Hat Revealed That Linear Heat Generation Rate Was 13.69 Kw/Ft or Greater than Allowable Max of 13.4 Kw/Ft.Caused by Not Completing All Preventive Measures of LER 1-79-022 + (ML19249D811)
- ML19249D812 + (ML19249D812)
- 05000267/LER-1979-033, Forwards LER 79-033/03L-0 + (ML19249D815)
- ML19249D816 + (ML19249D816)
- 05000267/LER-1979-033-03, /03L-0:on 790828,unauthorized Release Made from 1A Gas Waste Surge Tank.Caused by Wrong Valve Lineup.Valve Checkoff Sheets Revised to Require Operator Initials for Each Valve.Personnel Admonished + (ML19249D817)
- 05000302/LER-1979-082, Forwards LER 79-082/03L-0 + (ML19249D818)
- ML19249D819 + (ML19249D819)
- 05000334/LER-1979-034, Forwards LER 79-034/03L-0 + (ML19249D820)
- ML19249D821 + (ML19249D821)
- ML19249D822 + (ML19249D822)
- ML19249D823 + (ML19249D823)
- 05000302/LER-1979-082-03, /03L-0:on 790822,pinhole Leak Found in Makeup Pump Discharge Drain Line.Caused by Component Failure Resulting from Cyclic Vibration Fatigue.Drain Line Renewed & Tested Satisfactorily + (ML19249D825)
- 05000334/LER-1979-034-03, /03L-0:on 790424,loop B Temp Indication Failed Downscale.Caused by Failure of Capacitor in Low Level Amplifier TM-RC-422H for Loop B Hot Leg Temp.Redundant Instrumentation Used Until Capacitor Replaced + (ML19249D826)
- ML19249D827 + (ML19249D827)
- ML19249D828 + (ML19249D828)
- ML19249D829 + (ML19249D829)
- 05000267/LER-1979-030, Forwards LER 79-030/03L-0 + (ML19249D830)
- ML19249D831 + (ML19249D831)
- 05000272/LER-1979-058, Forwards LER 79-058/01T-0 + (ML19249D832)
- ML19249D833 + (ML19249D833)
- ML19249D834 + (ML19249D834)