Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19242D219 + (ML19242D219)
- ML19242D220 + (ML19242D220)
- ML19242D221 + (ML19242D221)
- ML19242D222 + (ML19242D222)
- ML19242D224 + (ML19242D224)
- ML19242D226 + (ML19242D226)
- ML19242D227 + (ML19242D227)
- ML19242D228 + (ML19242D228)
- ML19242D229 + (ML19242D229)
- ML19242D230 + (ML19242D230)
- ML19242D231 + (ML19242D231)
- ML19242D232 + (ML19242D232)
- ML19242D235 + (ML19242D235)
- L-79-173, Forwards Supplementary Response to IE Bulletin 79-06A Re Operating Procedures for Transients & Accidents + (ML19242D236)
- 05000348/LER-1978-024, Forwards Updated LER 78-024/03L-1 + (ML19242D237)
- ML19242D238 + (ML19242D238)
- ML19242D239 + (ML19242D239)
- ML19242D243 + (ML19242D243)
- 05000348/LER-1978-024-03, /03L-1 on 780408:while Changing Turbine Governor Valve Control,Load Rejection of Approx 170 MW Resulted in Momentary Temp Average Increase.Control Rods Automatically Initiated & Average Reduced + (ML19242D246)
- 05000304/LER-1979-036, Forwards LER 79-036/03T-0 + (ML19242D247)
- 05000334/LER-1979-020, Forwards LER 79-020/01T-0 + (ML19242D249)
- ML19242D250 + (ML19242D250)
- 05000304/LER-1979-036-03, /03T-0 on 790703:while Boric Acid Tank Was Recirculating Unit 2 Boron Injection Tank,Boron Concentration Was Found to Be 11.2%,0.3% Above Tech Spec Max.Caused by Leakage from RCS + (ML19242D251)
- ML19242D252 + (ML19242D252)
- ML19242D253 + (ML19242D253)
- ML19242D254 + (ML19242D254)
- ML19242D256 + (ML19242D256)
- ML19242D257 + (ML19242D257)
- ML19242D258 + (ML19242D258)
- ML19242D259 + (ML19242D259)
- ML19242D260 + (ML19242D260)
- ML19242D261 + (ML19242D261)
- ML19242D262 + (ML19242D262)
- ML19242D263 + (ML19242D263)
- ML19242D264 + (ML19242D264)
- 05000334/LER-1979-020-01, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation + (ML19242D265)
- ML19242D266 + (ML19242D266)
- 05000304/LER-1979-040, Forwards LER 79-040/03L-0 + (ML19242D268)
- ML19242D270 + (ML19242D270)
- ML19242D271 + (ML19242D271)
- 05000263/LER-1979-015, Forwards LER 79-015/03L-0 + (ML19242D272)
- ML19242D273 + (ML19242D273)
- 05000304/LER-1979-040-03, /03L-0 on 790724:steam Generator Level 2L-538 Indicated 20% Higher than Other Channels for Steam Generator D.Caused by Faulty Power Supply,Model 4111085-001.Power Supply Replaced W/Calibr Spare + (ML19242D274)
- ML19242D275 + (ML19242D275)
- 05000295/LER-1979-044, Forwards LER 79-044/99X-0 + (ML19242D276)
- ML19242D278 + (ML19242D278)
- 05000295/LER-1979-044-99, /99x-0 on 790608:operators Manually Initiated Safety Injection After False Steam Pressure Differential Signals Caused Control Room Safety Injection Annunciation. Caused by Waterhammer Shock in Steam Generator Loop D + (ML19242D279)
- ML19242D280 + (ML19242D280)
- 05000344/LER-1979-010, Forwards LER 79-010/03L-0 + (ML19242D281)
- 05000366/LER-1979-082, Forwards LER 79-082/03L-0 + (ML19242D283)
- ML19242D284 + (ML19242D284)