Monthly Operating Rept for Jul 1979
ML19242D271
Person / Time
Site: Maine Yankee
Issue date: 08/10/1979
From: Sjogren R
Maine Yankee
To:
Shared Package
ML19242D267 List:
References
NUDOCS 7908140774
Download: ML19242D271 (5)


Text

V, i

MAINE YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-07 FOR THE MONTH OF JULY, 1979

/

j 'j 7 90814 07~d['

d,

~

OPERATING DATA REPORT DOCKET NO.

50-309 DATE 700A10 C051PLETED BY UL S ior ren TELEPHONE

/ ^ 1 71 'AA-90ll X2281 OPERATING STATUS

1. Unit Name:

"' N Y'nl'ce

2. Reparting Period:

July 1979 Peser level restricted by

3. Licensed Thermal Power (51Wt):

2,630 steam flow through the LP 864 turbines.

4. Nameplate Rating (Gross 51We):

825

5. Design Electrical Rating (Net 31We):

850

6. Staximum Dependable Capacity (Gross SIWE):
7. Slaximum Dependable Capacity (Net 31We):

810

8. If Changes Occur in Capacity Ratir.gs (Items Number 3 Through 7) Since L2st Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net SIWE):

864 We (=975)

10. Reasons For Restrictions. If Any:

See note above.

(

\\

This 5f onth Yr..to.Date Cumulative 744 5,087

11. Hours In Reporting Period

!2. Number Of Hours Reactor Was Critical 744 3,167.44 48,211.06

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On Line 744 3.091.59 46,'614.76
15. Unit Reserve Shutdown Hours 0

0 0

16. Grrss Thermal Energy Generated (SIWH) 1.876.586 7.442,640 98,557,001
7. Gross Electrical Energy Generated (51WH) 616.720,_,

2,488,860 32,356,670

18. Net E!ectrical Energy Generated ('.!WH)

A00.452 2.408.850 30,697,046

19. Unit Service Factor 100 60.7 79.1 100 60.7 79.1
20. Unit Availability Factor 100.9 58.5 67.9
21. Unit Capacity Factor (Using AIDC Net) 99.1 57.4 65.5
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 39.2 7.2
24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date.and Duration of Each):
25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior te Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CONISIERCIAL OPER AT!ON (9/77)

I. { {}

N:U

4.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-309 UNIT Maine DATE 790810 CONtPLETED BY R. M. Siogren (617) 366-9011 TELE / HONE X2281 510 NTH July 1979 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL Othe-Net n (5twe Neti 833 g

836 37 832 2

839 33 832 3

834 39 4

836 20 828 5

70' 21 828 825 6

662 22 7

739 23 827 8

87; 24 829 9

836 25 824 10 8'6 26 822 825 11 837

,7 822 g3 837 73 819 13 832

,9 821 14 836 30 820 15 835 3;

16 836 INSTRUCTIONS On this format,!ist the average dady unit power !ese! in. lwe-Net for each day in the reporting month. Compute to

\\

the nearest whole megawatt.

10/77) v m c 7:.5

4 DOCKET NO.

50-309 UNIT Maine DATE 790810 COBIPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH July 1979 SU3D!ARY OF OPERATING EXPERIENCES At the beginning of the conth the plant was operating at 497% reactor power limited by the 864 MWe maximum load permitted on the low pres-sure turbine blading.

On July 5 a load reduction to 75% was performed to allow surveillance testing of the turbine valves and also to perform mussel control opera-tions of the Service Water headers. Load was back to N97% on July 7 and remained there for the rest of the month.

(.

Q O {,

/

UNIT SilUIDOWNS AND POWEll ItEDUCTIONS DOWET NO. MM N

UNil NAME Mafne __

c I) ATE.7908IU

'?

it EPollT MONTil July 1979 COMPl.El ED itY E.M. Slogren TELLPIIONE 1617) 366-9011 X228L O

Mi

.2 E g

,cM Licersec c.,

c ci i.-

c -t,

g7, Cause & ('errective No.

Date g

gg g

,a g 5 Event

~ 'j

n. ]

Action to g

H

$5

~ Ci c Iteport #

v) v sU Picvent Itecurrence

~

2 0

e 6

LR to 7-5-79 S

53.00 B

1 N/A N/A N/A Turbine Valve Testing and Mussel Con-75%

thru trol Operations of Service Water-7-7-79

!! cad e rs.

I 2

3 4

1:: l'ot t eil Itcason:

Mellu d:

I xtiihit C. Instructions S: Silicituted A.I'quipinent Failure (lixplain) 1.M a n u.il for hcp.uation of D.na Il Maintenance of Test 7 Mannal Serain.

Entry Slicets Ior I.icensee C ltclucling 3 Automatic Scrain.

Enot Iteport (i.l'lti l'ile INtlitl'.G.

1) Itegulatory Itcstriction 4-Ollier ( Explain )

r161) 1 Opciator liaining & Licene.e lixamination F Aitmini.teative S

G Opciational 1 nos (1.xpl.iin)