MAINE YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-07 FOR THE MONTH OF JULY, 1979
/
j 'j 7 90814 07~d['
d,
~
OPERATING DATA REPORT DOCKET NO.
50-309 DATE 700A10 C051PLETED BY UL S ior ren TELEPHONE
/ ^ 1 71 'AA-90ll X2281 OPERATING STATUS
- 1. Unit Name:
"' N Y'nl'ce
- 2. Reparting Period:
July 1979 Peser level restricted by
- 3. Licensed Thermal Power (51Wt):
2,630 steam flow through the LP 864 turbines.
- 4. Nameplate Rating (Gross 51We):
825
- 5. Design Electrical Rating (Net 31We):
850
- 6. Staximum Dependable Capacity (Gross SIWE):
- 7. Slaximum Dependable Capacity (Net 31We):
810
- 8. If Changes Occur in Capacity Ratir.gs (Items Number 3 Through 7) Since L2st Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net SIWE):
864 We (=975)
- 10. Reasons For Restrictions. If Any:
See note above.
(
\\
This 5f onth Yr..to.Date Cumulative 744 5,087
- 11. Hours In Reporting Period
!2. Number Of Hours Reactor Was Critical 744 3,167.44 48,211.06
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On Line 744 3.091.59 46,'614.76
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Grrss Thermal Energy Generated (SIWH) 1.876.586 7.442,640 98,557,001
- 7. Gross Electrical Energy Generated (51WH) 616.720,_,
2,488,860 32,356,670
- 18. Net E!ectrical Energy Generated ('.!WH)
A00.452 2.408.850 30,697,046
- 19. Unit Service Factor 100 60.7 79.1 100 60.7 79.1
- 20. Unit Availability Factor 100.9 58.5 67.9
- 21. Unit Capacity Factor (Using AIDC Net) 99.1 57.4 65.5
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 39.2 7.2
- 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date.and Duration of Each):
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior te Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CONISIERCIAL OPER AT!ON (9/77)
I. { {}
N:U
4.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-309 UNIT Maine DATE 790810 CONtPLETED BY R. M. Siogren (617) 366-9011 TELE / HONE X2281 510 NTH July 1979 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL Othe-Net n (5twe Neti 833 g
836 37 832 2
839 33 832 3
834 39 4
836 20 828 5
70' 21 828 825 6
662 22 7
739 23 827 8
87; 24 829 9
836 25 824 10 8'6 26 822 825 11 837
,7 822 g3 837 73 819 13 832
,9 821 14 836 30 820 15 835 3;
16 836 INSTRUCTIONS On this format,!ist the average dady unit power !ese! in. lwe-Net for each day in the reporting month. Compute to
\\
the nearest whole megawatt.
10/77) v m c 7:.5
4 DOCKET NO.
50-309 UNIT Maine DATE 790810 COBIPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH July 1979 SU3D!ARY OF OPERATING EXPERIENCES At the beginning of the conth the plant was operating at 497% reactor power limited by the 864 MWe maximum load permitted on the low pres-sure turbine blading.
On July 5 a load reduction to 75% was performed to allow surveillance testing of the turbine valves and also to perform mussel control opera-tions of the Service Water headers. Load was back to N97% on July 7 and remained there for the rest of the month.
(.
Q O {,
/
UNIT SilUIDOWNS AND POWEll ItEDUCTIONS DOWET NO. MM N
UNil NAME Mafne __
c I) ATE.7908IU
'?
it EPollT MONTil July 1979 COMPl.El ED itY E.M. Slogren TELLPIIONE 1617) 366-9011 X228L O
Mi
.2 E g
,cM Licersec c.,
c ci i.-
c -t,
g7, Cause & ('errective No.
Date g
gg g
,a g 5 Event
~ 'j
- n. ]
Action to g
H
$5
~ Ci c Iteport #
v) v sU Picvent Itecurrence
~
2 0
e 6
LR to 7-5-79 S
53.00 B
1 N/A N/A N/A Turbine Valve Testing and Mussel Con-75%
thru trol Operations of Service Water-7-7-79
!! cad e rs.
I 2
3 4
1:: l'ot t eil Itcason:
Mellu d:
I xtiihit C. Instructions S: Silicituted A.I'quipinent Failure (lixplain) 1.M a n u.il for hcp.uation of D.na Il Maintenance of Test 7 Mannal Serain.
Entry Slicets Ior I.icensee C ltclucling 3 Automatic Scrain.
Enot Iteport (i.l'lti l'ile INtlitl'.G.
- 1) Itegulatory Itcstriction 4-Ollier ( Explain )
r161) 1 Opciator liaining & Licene.e lixamination F Aitmini.teative S
G Opciational 1 nos (1.xpl.iin)
E stul,it i. Same Somu P8/17) 11 Utlic 11: x pl.iin) 4
.