Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19242D199 + (ML19242D199)
- 05000254/LER-1979-023, Forwards LER 79-023/03L-0 + (ML19242D200)
- ML19242D201 + (ML19242D201)
- ML19242D202 + (ML19242D202)
- ML19242D203 + (ML19242D203)
- ML19242D204 + (ML19242D204)
- ML19242D205 + (ML19242D205)
- ML19242D206 + (ML19242D206)
- ML19242D208 + (ML19242D208)
- ML19242D209 + (ML19242D209)
- 05000254/LER-1979-023-03, /03L-0 on 790717:high Pressure Switch in Safety Relief Valve Controller Found Inoperable During Reactor High Pressure Automatic Blowdown Functional test,QIS-40.Caused by Loosened Lead Wire from Switch to Terminal + (ML19242D210)
- ML19242D211 + (ML19242D211)
- ML19242D212 + (ML19242D212)
- 05000366/LER-1979-086, Forwards LER 79-086/03L-0 + (ML19242D213)
- ML19242D214 + (ML19242D214)
- 05000366/LER-1979-086-03, /03L-0 on 790730:HPCI Sys Declared Inoperable When 2E41-F041 Valve Failed to Close When Initiated from Control Switch.Valve Failure Caused by Burned Motor.New Motor & Pinion Key Installed & Tested Satisfactorily + (ML19242D217)
- ML19242D219 + (ML19242D219)
- ML19242D220 + (ML19242D220)
- ML19242D221 + (ML19242D221)
- ML19242D222 + (ML19242D222)
- ML19242D224 + (ML19242D224)
- ML19242D226 + (ML19242D226)
- ML19242D227 + (ML19242D227)
- ML19242D228 + (ML19242D228)
- ML19242D229 + (ML19242D229)
- ML19242D230 + (ML19242D230)
- ML19242D231 + (ML19242D231)
- ML19242D232 + (ML19242D232)
- ML19242D235 + (ML19242D235)
- L-79-173, Forwards Supplementary Response to IE Bulletin 79-06A Re Operating Procedures for Transients & Accidents + (ML19242D236)
- 05000348/LER-1978-024, Forwards Updated LER 78-024/03L-1 + (ML19242D237)
- ML19242D238 + (ML19242D238)
- ML19242D239 + (ML19242D239)
- ML19242D243 + (ML19242D243)
- 05000348/LER-1978-024-03, /03L-1 on 780408:while Changing Turbine Governor Valve Control,Load Rejection of Approx 170 MW Resulted in Momentary Temp Average Increase.Control Rods Automatically Initiated & Average Reduced + (ML19242D246)
- 05000304/LER-1979-036, Forwards LER 79-036/03T-0 + (ML19242D247)
- 05000334/LER-1979-020, Forwards LER 79-020/01T-0 + (ML19242D249)
- ML19242D250 + (ML19242D250)
- 05000304/LER-1979-036-03, /03T-0 on 790703:while Boric Acid Tank Was Recirculating Unit 2 Boron Injection Tank,Boron Concentration Was Found to Be 11.2%,0.3% Above Tech Spec Max.Caused by Leakage from RCS + (ML19242D251)
- ML19242D252 + (ML19242D252)
- ML19242D253 + (ML19242D253)
- ML19242D254 + (ML19242D254)
- ML19242D256 + (ML19242D256)
- ML19242D257 + (ML19242D257)
- ML19242D258 + (ML19242D258)
- ML19242D259 + (ML19242D259)
- ML19242D260 + (ML19242D260)
- ML19242D261 + (ML19242D261)
- ML19242D262 + (ML19242D262)
- ML19242D263 + (ML19242D263)
- ML19242D264 + (ML19242D264)