Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000338/LER-1979-083-01, /01T-0 on 790621:station Personnel Informed by Westinghouse That Main Feedline Rupture Can Cause Delay in Protection Signals Initiated by low-low Steam Generator Level.Caused by Incomplete Previous Westinghouse Analysis + (ML19241A681)
- ML19241A682 + (ML19241A682)
- ML19241A683 + (ML19241A683)
- ML19241A685 + (ML19241A685)
- ML19241A686 + (ML19241A686)
- 05000368/LER-1979-040-03, /03L-0 on 790603:during Mode 3 Operation, Emergency Feedwater Valve from Electric Pump to B Steam Generator,Would Not Stroke Shut.Caused by Coil & Tripper Bar Being Out of Adjustment.Valve Repaired + (ML19241A687)
- ML19241A689 + (ML19241A689)
- ML19241A690 + (ML19241A690)
- 05000278/LER-1979-013, Forwards LER 79-013/01T-0 + (ML19241A691)
- ML19241A692 + (ML19241A692)
- 05000368/LER-1979-043-03, /03L-0 on 790609:during Mode 3 Operation, Emergency Feedwater Control Valves from Electric Pump to a Steam Generator Failed to Close.Caused by Loose Wire on Handswitch.Valve Filled & Vented W/Oil + (ML19241A693)
- 05000278/LER-1979-013-01, /01T-0 on 790613:main Steam Relief Valve RV3-2-71L Lifted,Causing Torus Water Vol to Exceed Tech Spec Limit by 2.6%.Reactor Manually Scrammed.Valve Replaced & Sent to Wiley Lab to Determine Cause for Failure + (ML19241A694)
- 05000245/LER-1979-017, Forwards LER 79-017/03L-0 + (ML19241A695)
- ML19241A697 + (ML19241A697)
- 05000245/LER-1979-017-03, /03L-0 on 790602:steam Tunnel Switch Tripped at Setpoint Higher than Specified in Tech Specs.Caused by Setpoint Drift.Switch Adjusted & Tested Satisfactorily + (ML19241A698)
- 05000250/LER-1979-019, Forwards LER 79-019/03L-0 + (ML19241A699)
- ML19241A700 + (ML19241A700)
- 05000245/LER-1979-016, Forwards LER 79-016/03L-0 + (ML19241A701)
- 05000245/LER-1979-016-03, /03L-0 on 790530:pressure Switches 263-52A, 263-52C,263-54A & 263-54B Tripped Outside Allowable Band. Caused by Setpoint Drift.Switches Reset within Required Range & Tested + (ML19241A703)
- 05000250/LER-1979-019-03, /03L-0 on 790515:during Power Operation,Fewer than Three Required Intake Cooling Water Pumps Were Operable. Caused by Debris at Pump Suction Well.Pump Backflushed & Tested Satisfactorily + (ML19241A706)
- ML19241A707 + (ML19241A707)
- ML19241A708 + (ML19241A708)
- ML19241A709 + (ML19241A709)
- ML19241A710 + (ML19241A710)
- ML19241A711 + (ML19241A711)
- ML19241A712 + (ML19241A712)
- ML19241A713 + (ML19241A713)
- ML19241A714 + (ML19241A714)
- ML19241A715 + (ML19241A715)
- ML19241A716 + (ML19241A716)
- ML19241A719 + (ML19241A719)
- ML19241A723 + (ML19241A723)
- 05000338/LER-1979-083, Followup Rept to LER 79-083/01T-0:high Energy Line Breaks Inside Containment Could Cause Heatup of Steam Generator Ref Leg,Causing Level Indications Higher than Actually Exist.Caused by Incomplete Westinghouse Analysis + (ML19241A724)
- ML19241A725 + (ML19241A725)
- ML19241A726 + (ML19241A726)
- ML19241A727 + (ML19241A727)
- ML19241A731 + (ML19241A731)
- 05000366/LER-1979-055, Forwards LER 79-055/03L-0 + (ML19241A732)
- ML19241A733 + (ML19241A733)
- ML19241A734 + (ML19241A734)
- ML19241A735 + (ML19241A735)
- ML19241A736 + (ML19241A736)
- ML19241A739 + (ML19241A739)
- ML19241A743 + (ML19241A743)
- 05000366/LER-1979-055-03, /03L-0 on 790618:linear Heat Generation Rate Increased from 87% Limiting Valve to 106% W/Corresponding 3% Increase in Thermal Power During Test.Caused by Rod Withdrawal.Rods Inserted & Rate Lowered to 98% + (ML19241A744)
- ML19241A746 + (ML19241A746)
- ML19241A747 + (ML19241A747)
- ML19241A748 + (ML19241A748)
- ML19241A749 + (ML19241A749)
- ML19241A751 + (ML19241A751)
- ML19241A752 + (ML19241A752)