Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19210D642 + (ML19210D642)
- ML19210D643 + (ML19210D643)
- 05000259/LER-1979-030-03, /03L-0:on 791023,during Surveillance Testing,Torus Hydrogen Sensor Gave High Indication for 4% Calibr Gas. Caused by Degradition of Sensor.Redundant Sensor Placed in Svc + (ML19210D644)
- ML19210D645 + (ML19210D645)
- 05000298/LER-1979-027, Forwards LER 79-027/03L-0 + (ML19210D646)
- ML19210D647 + (ML19210D647)
- ML19210D648 + (ML19210D648)
- ML19210D649 + (ML19210D649)
- ML19210D650 + (ML19210D650)
- 05000346/LER-1979-102-03, /03L-0:on 791022,during Feedwater Sys Monthly Surveillance Test,No Oil Level Visible in Oil Sight Glass on Inboard Bearing of Auxiliary Feedpump Turbine 1-1.Caused by Loose Sight Glass.Glass Tightened & Oil Replaced + (ML19210D652)
- ML19210D653 + (ML19210D653)
- ML19210D654 + (ML19210D654)
- ML19210D655 + (ML19210D655)
- 05000298/LER-1979-027-03, /03L-0:on 791001,during Routine Surveillance Procedure MS-DPIS-119B,switch Was Found W/Setpoints in Excess of Tech Specs.Caused by Setpoint Drift.Instrument Recalibr + (ML19210D656)
- 05000333/LER-1979-056, Forwards LER 79-056/01X-1 + (ML19210D658)
- ML19210D659 + (ML19210D659)
- ML19210D660 + (ML19210D660)
- ND-19-0914, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.05.07a.i (Index Number 265) + (ML19210D661)
- 05000312/LER-1979-015, Forwards LER 79-015/03L-0 + (ML19210D662)
- 05000346/LER-1979-103, Forwards LER 79-103/03L-0 + (ML19210D665)
- ML19210D666 + (ML19210D666)
- ML19210D667 + (ML19210D667)
- ML19210D668 + (ML19210D668)
- ML19210D670 + (ML19210D670)
- 05000346/LER-1979-103-03, /03L-0:on 791023,first & Third Seals in Reactor Coolant Pump 1-1-1 Were Not Staging.Caused by Thermal Shocking Which Occurred During Loss of Offsite Power on 791015.Seal Package Refurbished & Reinstalled + (ML19210D671)
- 05000312/LER-1979-015-03, /03L-0:on 791031,A/E Informed Util That as-built Configuration of Line 47360-10 Inch,When Seismically Reanalyzed,May Result in Pipe Support Overstress.Caused by Nonconformance of Const Drawings.New Support Installed + (ML19210D672)
- ML19210D674 + (ML19210D674)
- 05000333/LER-1979-056-01, /01X-1:on 790926,cabling Associated W/Hpci Sys Inboard Steam Supply Isolation Valve & Automatic Depressurization Sys (ADS) Did Not Meet NRC Separation Criteria.Caused by Proximity of HPCI & ADS Cables + (ML19210D675)
- ND-19-0867, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07e (Index Number 812) + (ML19210D676)
- 05000338/LER-1979-138-01, /01T-0:on 791108,Westinghouse Identified Potential Failure in Circuit Reactor Trip Breaker for P-4 Permissive W/Engineered Safety Features Actuation.Caused by Design Failure.Reanalysis in Progress + (ML19210D677)
- ML19210D682 + (ML19210D682)
- ML19210D683 + (ML19210D683)
- ML19210D685 + (ML19210D685)
- ML19210D686 + (ML19210D686)
- 05000338/LER-1979-143-01, /01T-0:on 791109,fuel Vendor Identified Potential Problem Affecting Temp of Large Break LOCA-ECCS Evaluation Model.Caused by Erroneous Fuel Burst Calculations.Study in Progress for Peak Clad Temp + (ML19210D687)
- ML19210D689 + (ML19210D689)
- ML19210D690 + (ML19210D690)
- ML19210D692 + (ML19210D692)
- ML19210D693 + (ML19210D693)
- 05000298/LER-1979-029, Forwards LER 79-029/03L-0 + (ML19210D694)
- ML19210D695 + (ML19210D695)
- 05000302/LER-1979-102, Forwards LER 79-102/03L-0 + (ML19210D696)
- ML19210D697 + (ML19210D697)
- ML19210D698 + (ML19210D698)
- 05000298/LER-1979-029-03, /03L-0:on 791012,during Routine Plant Tour,Pinhole Leak Detected in Upstream Weld of Supply Isolation Valve. Cause Unknown.Weld Will Be Repaired During Next Shutdown + (ML19210D699)
- 05000302/LER-1979-102-03, /03L-0:on 791023,core Flood Tank B Sample Isolation Valve CFV-12 Would Not Close.Cause Unknown.Valve Presently Maintained in Closed Position Until Repairs Can Be Completed + (ML19210D700)
- ML19210D702 + (ML19210D702)
- ML19210D703 + (ML19210D703)
- ML19210D704 + (ML19210D704)
- AECM-79-126, Interim Rept 3 for Potential Reportable Deficiency 79/04 Re Inadequate Crimping in Power Generation Control Complex Interconnecting Cable Pen Connections.Field Disposition Instructions Issued + (ML19210D705)
- ML19210D706 + (ML19210D706)