Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18113A444 + (ML18113A444)
- 05000335/LER-2076-016, During Preoperational Testing with Plant in Hot Standby, Control Room Air Conditioner Was Out of Service + (ML18113A446)
- NL-18-0153, Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02 + (ML18113A447)
- 05000335/LER-2076-014, During Preoperational Testing, Outer Personnel Access Door to Containment Would Not Pass Air Leakage Test + (ML18113A449)
- 05000335/LER-2076-013, During Preoperational Testing, Steam Auxiliary Feed Pump Would Not Start Properly from Hot Shutdown Control Panel + (ML18113A453)
- 05000335/LER-2076-012, During Preoperational Testing, Main Steam Isolation Valves Did Not Close within 6 Seconds as Required by Tech Spec 4.7.1.5.b + (ML18113A454)
- 05000335/LER-2076-009, Five Mechanical Piping Restraints Were Locked Up During Heatup for Post Core Hot Functional Testing + (ML18113A458)
- IR 05000280/2018001 + (ML18113A460)
- ML18113A469 + (ML18113A469)
- ML18113A480 + (ML18113A480)
- ML18113A481 + (ML18113A481)
- ML18113A482 + (ML18113A482)
- ML18113A483 + (ML18113A483)
- L-78-108, Annual Radiological Environmental Monitoring Report for the Period: 1-01-77 to 12-31-77 + (ML18113A492)
- L-77-100, Forwards Annual Radiological Environmental Monitoring Report for 1/1-12/31/1976 + (ML18113A493)
- ML18113A503 + (ML18113A503)
- ML18113A504 + (ML18113A504)
- SBK-L-18077, Submittal of 2017 Annual Environmental Operating Report + (ML18113A511)
- L-78-135, Forwarding Amendments 1 and 2 to Report CEN-79-P, Reactor Operation with Guide Tube Wear + (ML18113A516)
- W3F1-2018-0020, Responses to Request for Additional Information Set 18 Regarding the License Renewal Application + (ML18113A517)
- ML18113A519 + (ML18113A519)
- ML18113A520 + (ML18113A520)
- L-78-136, Forwarding CEN-89(F)-P, Increased Water Hold Peaking in Operating Reactors (St. Lucie-1), Dated March 30, 1978 + (ML18113A522)
- L-78-114, Forwarding Report, CEN-89 (F)-P, Solutions to Increased Water Hold Peaking in Operating Reactors (St. Lucie-1), Dated March 10, 1978 + (ML18113A523)
- ML18113A524 + (ML18113A524)
- ML18113A529 + (ML18113A529)
- NRC 2018-0023, Response to Regulatory Information Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations + (ML18113A530)
- ML18113A533 + (ML18113A533)
- ML18113A542 + (ML18113A542)
- 05000281/LER-1978-011-03, /03X-1 on 780305:During Normal Full Pwr Oper,There Was No Svc Water Flow Thru Charging Pump Intermediate Seal Cooler 2-SW-E-1B,due to Failure of the Coolers Discharge Gate Valve + (ML18113A543)
- ML18113A549 + (ML18113A549)
- ML18113A550 + (ML18113A550)
- ML18113A552 + (ML18113A552)
- ML18113A556 + (ML18113A556)
- ML18113A558 + (ML18113A558)
- 05000281/LER-1978-033, Forwards LER 78-033/03L-0 + (ML18113A559)
- ML18113A560 + (ML18113A560)
- 05000280/LER-1978-029, Forwards LER 78-029/03L-0 + (ML18113A561)
- ML18113A562 + (ML18113A562)
- ML18113A569 + (ML18113A569)
- ML18113A570 + (ML18113A570)
- ML18113A571 + (ML18113A571)
- 05000281/LER-1978-032, Forwards LER 78-032/03L-0 + (ML18113A573)
- ML18113A574 + (ML18113A574)
- 05000281/LER-1978-032-03, /03L-0:on 780921,heat Tracing Circuit Manual Boration/Boric acid-to-blender Failed.Caused by Boric Acid Penetration of Heat Tracing Tape Circuits.Heat Tracing Tape Replaced + (ML18113A575)
- ML18113A576 + (ML18113A576)
- IR 05000280/1978019 + (ML18113A578)
- ML18113A579 + (ML18113A579)
- ML18113A581 + (ML18113A581)
- ML18113A583 + (ML18113A583)
- ML18113A584 + (ML18113A584)