- LR-N970770, Forwards Response to 970404 RAI Re Resolution of USI A-46, Seismic Qualification of Equipment in Operating Plants. Outlier Resolution Schedule Is Being Revised Since Implementation Issues May Affect Number of Outliers + (ML18106A312)
- ML18106A313 + (ML18106A313)
- LR-N980031, Forwards QA Program for Hope Creek & Salem Generating Stations,As Documented in Section 17.2 of Respective Ufsars, for NRC Approval + (ML18106A314)
- ML18106A315 + (ML18106A315)
- ML18106A316 + (ML18106A316)
- ML18106A320 + (ML18106A320)
- ML18106A321 + (ML18106A321)
- ML18106A322 + (ML18106A322)
- ML18106A323 + (ML18106A323)
- ML18106A324 + (ML18106A324)
- ML18106A325 + (ML18106A325)
- ML18106A327 + (ML18106A327)
- ML18106A328 + (ML18106A328)
- LR-N980011, Transmits Review of Final CEOG Rept, Best Estimate Cu & Ni in CE Fabricated Reactor Vessel Welds Dtd June,1997.Closure to NRC Ser,Provided.Transmittal Is in Response to GL 92-01, Rev 1,suppl 1 + (ML18106A329)
- 05000272/LER-1998-001, :on 980116,AFP Internal Flooding Protection Was Installed Incorrectly.Caused by Installation Error During Construction.Pipe Alley Flood Gate counter-weight Was Properly Positioned on 980124 + (ML18106A330)
- ML18106A331 + (ML18106A331)
- IR 05000272/1998002 + (ML18106A333)
- ML18106A336 + (ML18106A336)
- 05000311/LER-1998-001-01, :on 970705,failed to Meet TS 3.3.3.7 Table 3.3-11 Item 19 -RVLIS.Caused by Test Equipment Had Not Been Evaluated for Effect on Sys Operability.Installation of Isolators Has Been Included in Rev 5 + (ML18106A342)
- ML18106A344 + (ML18106A344)
- ML18106A345 + (ML18106A345)
- ML18106A346 + (ML18106A346)
- ML18106A347 + (ML18106A347)
- ML18106A350 + (ML18106A350)
- ML18106A351 + (ML18106A351)
- ML18106A352 + (ML18106A352)
- 05000311/LER-1998-002-01, :on 980129,23 Overtemperature Delta Temperature Channel Found Inoperable.Cause of Event Being Attributed to Human Error.Lead & Lag Switches Were Restored to Correct Positions + (ML18106A356)
- 05000311/LER-1996-007, :on 980130,missed Surveillance of Containment Penetration Overcurrent Protection Devices Occurred.Caused by Failure to Tag 35 Amp Breaker.Surveillance Testing for Breakers 1ELC-1 & 1ELC-3 Will Be Completed + (ML18106A357)
- LR-N980087, Forwards Semiannual Radioactive Effluent Release Rept for Radioactive Effluent Release Rept 43.Rept Summarizes Liquid & Gaseous Release & Solid Waste Shipments from Salem Generating Station for Period of Jul-Dec 1997 + (ML18106A358)
- ML18106A359 + (ML18106A359)
- ML18106A361 + (ML18106A361)
- 05000311/LER-1998-004, :on 980204,failure to Comply W/Ts SR 4.1.3.1.1 Was Noted.Caused by Human Error.Review of Both Units 1 & 2 P250 Computer Points Was Conducted + (ML18106A364)
- LR-N980118, Forwards Summary of Util Evaluation of part-length Control Rod Drive Mechanism Housing Weld Crack of Prairie Island, Unit 2,which Is Relevant to Sgs.Util Intends to Take No Further Action Beyond Those Stated in Encl + (ML18106A365)
- ML18106A366 + (ML18106A366)
- ML18106A369 + (ML18106A369)
- LR-N980091, Provides Specific Info Requested by NRC & Overall Response Re Corrections to SER for Amend 69 to Unit 2 Ts.Info Re Mitigation of LOCA in Mode 4 Encl + (ML18106A370)
- ML18106A371 + (ML18106A371)
- LR-N980006, Provides 1997 Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means.Changed Commitments Listed W/Source Document + (ML18106A372)
- LR-N980096, Provides 90 Day Response to GL 97-05, SG Tube Insp Techniques + (ML18106A373)
- 05000311/LER-1998-005, :on 980211,failure of 2A EDG Turbocharger Was Noted.Caused by Failure of Blade on Turbochargers Rotating Turbine Disc.Damaged Turbocharger on 2A EDG Was Replaced W/ Refurbished Turbocharger + (ML18106A374)
- LR-N980130, Requests Withdrawal of 970514 License Change Request LCR S97-12,revising TS to Extend Filter Testing Boundary & Adjust Associated Acceptance Criteria Re Control Room Emergency Air Conditioning Sys Surveillance Requirements + (ML18106A375)
- LR-N98-0133, Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2 + (ML18106A376)
- LR-N98-0132, Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1 + (ML18106A377)
- ML18106A378 + (ML18106A378)
- ML18106A379 + (ML18106A379)
- LR-N980039, Submits Revised Commitment Re ISI Quarterly Dead Leg Samples for Units 1 & 2 + (ML18106A380)
- LR-N980103, Informs NRC That Flow Test Has Been Successfully Completed on Salem,Unit 1 During Most Recent Refueling Outage (1R12). Test Verified That Pipe & Flow Meter Used During Leakage Monitoring Unobstructed + (ML18106A381)
- 05000272/LER-1998-003, :on 980216,inadequate Surveillance Testing of FW Isolation & P-10 SR Block Was Noted.Caused by Inadequate Development of Original Surveillance Tps for Ssps Logic Testing.Revised Ssps Logic Functional Tps + (ML18106A382)
- LR-N980128, Forwards Final Version of COLR for Salem,Unit 1 Cycle 13. Previously Submitted COLR Contained Error in Rod Insertion Limit for Bank C + (ML18106A384)