ML18106A350

From kanterella
Jump to navigation Jump to search
Forwards Annual Repts for Salem & Hope Creek Generating Stations,Info Per Requirements of TS 6.9.1.5.a & B of App a to FOLs DPR-70,DPR-75 & NPF-57
ML18106A350
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/26/1998
From: Dawn Powell
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A351 List:
References
LR-N98032, NUDOCS 9803060081
Download: ML18106A350 (3)


Text

e OPS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit FEB 2 6 1998 LR-N98032 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 TECHNICAL SPECIFICATION 6.9.1.5 ANNUAL REPORTS SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311 AND 50-354 Gentlemen:*

Public Service Electric and Gas Company (PSE&G) hereby submits the enclosed Annual Reports for the Salem and Hope Creek Generating Stations, in accordance with Technical Specifications 6.9.1.5.a and 6.9.1.5.b of Appendix A to Facility Operating License Nos. DPR-70, DPR-75 and NPF-57.

Pursuant to Technical Specification 6.9.1.5.a, Enclosures 1, 2 and 3 are submit~ed for Salem Unit 1, Salem Unit 2 and Hope Creek, respectively. These enclosures contain estimations on an annual basis of the number of station, utility and other personnel receiving exposures greater than 100 mrem/year and the collective exposures according to work and job function for each unit.

Pursuant to the requirements of Technical Specification 6.9.1.5.b of Appendix A to Facility Operating License No. NPF-57, the following information is being provided concerning the Hope Creek Safety/Relief Valves (SRVs). During 1997, the SRVs were not challenged by any overpressurization events or transients that would have required the valves to respond. SRV testing was performed on installed SRVs during 1997 and the results, including a discussion on SRV setpoint drift, were provided to the NRC in Hope Creek LER 97-024-00, sent via letter LR-N97678, dated October 20, 1997.

Since Salem Unit 1 and Unit 2 did not have any steam generator tube inspections completed in 1997, there are no results to provide pursuant to Technical Specification 6.9.1.5.b of Appendix A to Facility Operating License DPR-70 and DPR-75.

9803060081 980226 PDR ADOCK OS000272 R PDR IIfllll fllll lllllJlllll llll[ll/l(lll IfII 95-2168 REV. 6 94

e FEB 2 6 1998 Document Control Desk LR-N98032 Should you have any questions or comments regarding this submittal, please contact us.

Sincerely,

/n ; )

'\...\/. I (

1(

I IN t L{.{

D. R. Powell Manager -

Licensing and Regulation Enclosures (3)

C Mr. H. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Ms. B. Mozafari, Licensing Project Manager - HC U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. P. Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans (X24)

USNRC Senior Resident Inspector - Salem Mr. S. Morris (X24)

USNRC Senior Resident Inspector - HC Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P. 0. Box 415 Trenton, NJ 08625

Document Control Desk LR-N98032 JPP BC Senior Vice President - Nuclear Operations (X04)

General Manager - Hope Creek Operations (H07)

General Manager - Salem Operations (SOS)

Director - QA/NT/EP (XOl)

Director - Licensing/Regulation and Fuels (N21)

Manager - Financial Control & Co-Owner Affairs (N07)

Program Manager - Nuclear Review Board (N38)

Manager - Salem Licensing (N21)

Manager - Hope Creek Licensing (N21)

J. Keenan, Esq. (N21)

Records Management (N21)

Microfilm Copy File-1.2.1 and 3.9.2