Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18106A222 + (ML18106A222)
- ML18106A223 + (ML18106A223)
- ML18106A226 + (ML18106A226)
- ML18106A227 + (ML18106A227)
- ML18106A228 + (ML18106A228)
- ML18106A229 + (ML18106A229)
- ML18106A230 + (ML18106A230)
- ML18106A231 + (ML18106A231)
- IR 05000272/1997019 + (ML18106A233)
- ML18106A234 + (ML18106A234)
- 05000272/LER-1995-023-01, Forwards Supplemental LER 95-023-01 Re Failure to Plug SG Tubes Due to Missed Eddy Current Indications.Suppl Being Submitted to Discuss Cause & Safety Significance of Event + (ML18106A235)
- ML18106A236 + (ML18106A236)
- 05000272/LER-1995-023, :on 940106,failed to Plug SG Tubes.Caused by Lack of Contractor Oversight in Area of Eddy Current Testing.Analyst Guidelines Specific to Salem,Units 1 & 2 & Performance Demonstration Program Were Developed + (ML18106A237)
- 05000311/LER-1997-010, :on 970819,CR Operators Initiated Plant Shutdown to Comply W/Requirements of Ts.Caused by Design, Mfg Const/Installation Deficiencies.Calibr Procedure Revised + (ML18106A238)
- LR-N970815, Forwards 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML18106A239)
- ML18106A240 + (ML18106A240)
- IR 05000272/1997018 + (ML18106A241)
- 05000311/LER-1997-018, Forwards LER 97-018-00, Inadequate TS Testing - Main Steam Isolation Valve Hydraulic Unit Override Contacts. LER Was Originally Submitted on 971224 as LER 97-016.Number Was Already Assigned to Special Rept + (ML18106A244)
- ML18106A245 + (ML18106A245)
- 05000311/LER-1997-018-01, :on 971125,inadequate TS Testing of MSIV Hydraulic Unit Override Contacts,Was Identified.Caused by Lack of Adequate Controls.Procedure S1(2).OP-ST.MS-0003(Q) Revised to Include Testing of MSIV Hydraulic Unit Override + (ML18106A246)
- ML18106A247 + (ML18106A247)
- 05000311/LER-1997-017-01, :on 971212,discovered That non-essential Heat Loads for Chilled Water Sys Were Not Isolated IAW TS Action Statement 3.7.10.a.1.Caused by Personnel Error.Personnel Involved Held Accountable & Revised Procedures + (ML18106A249)
- LR-N980004, Informs That Util Will Be Prepared to Enter Mode 4 During First Week in Feb 1998 Based on Activities to Be Performed. Info Is Provided So That Appropriate Arrangements Can Be Made for NRC Restart Assessment Team Insp + (ML18106A250)
- LR-N970810, Supplemental Application for Amends to Licenses DPR-70 & DPR-75,respectively Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page + (ML18106A252)
- ML18106A253 + (ML18106A253)
- ML18106A254 + (ML18106A254)
- LR-N980025, Forwards Overview of Steps Pse&G Has & Is Taking to Sustain Continued Improvement for Future.Info Is Being Provided to Commission as Follow Up to Briefing Provided in June 1997 + (ML18106A255)
- ML18106A256 + (ML18106A256)
- ML18106A257 + (ML18106A257)
- ML18106A258 + (ML18106A258)
- ML18106A261 + (ML18106A261)
- ML18106A262 + (ML18106A262)
- LR-N980007, Forwards COLR IAW Section 6.9.1.9 of Plant Ts.Rept Was Received by Util as Part of Reload Safety Evaluation + (ML18106A264)
- ML18106A265 + (ML18106A265)
- LR-N970818, Provides Notification That GL 96-01 Actions Have Been Completed as Part of TS Surveillance Improvement Program + (ML18106A266)
- ML18106A267 + (ML18106A267)
- 05000272/LER-1996-005-15, Forwards LER 96-005-15, Inadequate TS Testing - Feedwater Sys Isolation Functional Test/Component Cooling Water Heat Exchanger Service Water Flow Control Valves + (ML18106A268)
- ML18106A269 + (ML18106A269)
- ML18106A271 + (ML18106A271)
- ML18106A272 + (ML18106A272)
- LR-N980008, Discusses Option Chosen by Util to Resolve Issues Re Spent Fuel Pool Liner Analysis.Util Will Seismically Qualify Spent Fuel Pool Cooling Sys Which Will Eliminate Need to Postulate Loss of Forced Cooling + (ML18106A274)
- ML18106A275 + (ML18106A275)
- ML18106A276 + (ML18106A276)
- ML18106A277 + (ML18106A277)
- ML18106A278 + (ML18106A278)
- ML18106A279 + (ML18106A279)
- ML18106A282 + (ML18106A282)
- LR-N970817, Informs That Util Revising Commitment Contained in to State,Min Shift Staffing Levels Necessary to Perform Simultaneous Alternate Shutdown of Units 1 & 2,controlled Under Administrative Procedures + (ML18106A284)
- ML18106A285 + (ML18106A285)
- ML18106A286 + (ML18106A286)
- ML18106A287 + (ML18106A287)