Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1997-006, :on 970312,determined Relays That Are Part of Logic for Opening PORVs Were Not Tested.Caused by Lack of Adequate Control for Maint of TS Surveillance Procedures. Initiated New Procedures & Revised Procedures + (ML18102A958)
- ML18102A959 + (ML18102A959)
- ML18102A960 + (ML18102A960)
- ML18102A961 + (ML18102A961)
- ML18102A962 + (ML18102A962)
- ML18102A963 + (ML18102A963)
- LR-N970219, Forwards Response to RAI Re Adequacy of TS Compliance + (ML18102A964)
- LR-N970221, Forwards RAI Re License Change Request Re Pressurizer Power Operated Relief Valves + (ML18102A965)
- ML18102A966 + (ML18102A966)
- ML18102A967 + (ML18102A967)
- ML18102A971 + (ML18102A971)
- ML18102A973 + (ML18102A973)
- ML18102A974 + (ML18102A974)
- ML18102A975 + (ML18102A975)
- ML18102A976 + (ML18102A976)
- ML18102A978 + (ML18102A978)
- LR-N970149, Application for Amends to Licenses DPR-70 & DPR-75, Increasing Cw Flow to 2550 Gpm for 31 Day Surveillance Fans Started & Operated in Low Speed + (ML18102A979)
- ML18102A980 + (ML18102A980)
- ML18102A981 + (ML18102A981)
- ML18102A982 + (ML18102A982)
- LR-N970259, Monthly Operating Rept for Mar 1997 for Salem Unit 2.W/ + (ML18102A983)
- LR-N970258, Monthly Operating Rept for Mar 1997 for Salem Unit 1.W/ + (ML18102A984)
- LR-N970257, Informs That follow-up Ltr Re Scope & Schedule of Design Bases Review,Will Be Submitted within 90 Days (Not 60 Days) of 970211 + (ML18102A985)
- LR-N970250, Informs That Util Will Be Prepared to Commence Mode Ascension for Plant Unit 2 About 970508 Based on Work Completed to Date.Restart Assessment Team Insp Requested + (ML18102A986)
- ML18102A987 + (ML18102A987)
- ML18102A989 + (ML18102A989)
- ML18102A990 + (ML18102A990)
- IR 05000272/1997004 + (ML18102A992)
- 05000311/LER-1997-003-02, :on 970319,excessive Debris in Unit Two Containment Was Caused by Poor Enforcement & Lack of Mgt Expectations Over Life of Plant,Coupled W/Poor Worker Practices.Debris Removed + (ML18102A994)
- LR-N970227, Provides Licensee Response to Safety Concerns at Salem & Reiterates Commitment to Nuclear Safety + (ML18102A995)
- IR 05000272/1996017 + (ML18102A996)
- 05000272/LER-1997-008, :on 970321,inadequate Surveillance Testing of PORV Accumulators & Check Valves Was Attributed to Lack of Adequate Controls for Development & Maintenance of TS Surveillance Procedures.New Procedure Made + (ML18102A998)
- IR 05000272/1996015 + (ML18102A999)
- LR-N970264, Forwards Update on Open Regulatory Items Re Salem Unit 2 Restart + (ML18102B000)
- IR 05000272/1996008 + (ML18102B001)
- ML18102B005 + (ML18102B005)
- ML18102B006 + (ML18102B006)
- ML18102B007 + (ML18102B007)
- ML18102B009 + (ML18102B009)
- LR-N970232, Forwards Annual Radiological Environ Operating Rept for Jan-Dec 1996. Rept Summarizes Results of Radiological Environ Surveillance Program for 1996 in Vicinity of Salem & Hope Creek Generating Stations + (ML18102B010)
- ML18102B011 + (ML18102B011)
- ML18102B012 + (ML18102B012)
- LR-N970230, Forwards Response to RAI Re Request for Change to TS Re Containment Design Temperature,Dtd 961011,970203 & 0321 + (ML18102B014)
- ML18102B015 + (ML18102B015)
- ML18102B016 + (ML18102B016)
- ML18102B019 + (ML18102B019)
- ML18102B020 + (ML18102B020)
- LR-N970256, Application for Amends to Licenses DPR-70 & DPR-75, Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 + (ML18102B022)
- ML18102B024 + (ML18102B024)
- ML18102B025 + (ML18102B025)
- ML18102B027 + (ML18102B027)