Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18026A517 + (ML18026A517)
- ML18026A518 + (ML18026A518)
- ML18026A520 + (ML18026A520)
- ML18026A521 + (ML18026A521)
- ML18026A522 + (ML18026A522)
- 05000387/LER-1991-006-01, :on 910608,unplanned Actuations of ESF Occurred.Caused by Unexpected Trip of Primary Power Supply EPA Breaker Losing Power.Breakers Reset & Full Power Operation Continued Uninterupted + (ML18026A525)
- PLA-3642, Forwards Rev 44 to Fsar.Rev Submitted as Result of Commitments Contained in Util to Revise FSAR to Reflect Design of Isolation for Class 1E Circuits from non-Class 1E Circuits + (ML18026A526)
- PLA-3986, Forwards Rev 8 to ISI-T-100.0, ISI Program Plan for Pump & Valve Operational Testing & Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing + (ML18026A529)
- PLA-4019, Requests Enforcement Discretion from TS Action 3.6.1.8b So Proposed Emergency Amend Can Be Processed & Submitted to NRC Re Inoperable Containment Purge Valve + (ML18026A530)
- ML18026A532 + (ML18026A532)
- PLA-4148, Responds to NRC Re Violations Noted in AIT Insp Rept 50-387/93-80 on 931221.Corrective Actions:Revised Operating Procedure & Issued off-normal Procedure + (ML18026A533)
- PLA-4215, Forwards Proposed Amends 177 & 131 to Licenses NPF-14 & NPF-22,respectively,incorporating Administrative Changes + (ML18026A534)
- ML18026A535 + (ML18026A535)
- PLA-4219, Requests Relief from ASME Code Section III NC-5230,Category C for Field Weld on Line HBB-110-4.W/three Oversize Drawings + (ML18026A536)
- PLA-4273, Forwards FSAR Change Delineating Use of RHR Fuel Pool Cooling Mode of Operation to Mitigate Loss of Normal Spent Fuel Pool Cooling Sys in Response to Seismic Event,Per Commitment Made Via + (ML18026A537)
- PLA-4473, Provides Response to Violations Noted in Insp Repts 50-387/96-04 & 50-388/96-04.Corrective Actions:All Doors to Decontamination Bldg on Refueling Floor Immediately Posted on 960201 + (ML18026A539)
- ML18026A541 + (ML18026A541)
- FOIA/PA-2018-0081 + (ML18026A542)
- ML18026A543 + (ML18026A543)
- IR 05000327/2017008 + (ML18026A544)
- ML18026A545 + (ML18026A545)
- ML18026A546 + (ML18026A546)
- ML18026A547 + (ML18026A547)
- ML18026A548 + (ML18026A548)
- ML18026A549 + (ML18026A549)
- ML18026A551 + (ML18026A551)
- ML18026A554 + (ML18026A554)
- ML18026A555 + (ML18026A555)
- ML18026A558 + (ML18026A558)
- ML18026A561 + (ML18026A561)
- PMNS20180012, Design Certification Review Discussions + (ML18026A564)
- ML18026A565 + (ML18026A565)
- ML18026A566 + (ML18026A566)
- ML18026A567 + (ML18026A567)
- ML18026A568 + (ML18026A568)
- ML18026A569 + (ML18026A569)
- ML18026A570 + (ML18026A570)
- ML18026A571 + (ML18026A571)
- ML18026A582 + (ML18026A582)
- NRC 2018-0005, Refueling Outage U1R37 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations + (ML18026A583)
- ML18026A584 + (ML18026A584)
- ML18026A586 + (ML18026A586)
- ML18026A587 + (ML18026A587)
- PLA-3705, Forwards Rev 7 to IST-T-100.0, SSES Unit 1 Inservice Insp Program Plan for Pump & Valve Operational Testing & Rev 4 to IST-T-200.0, SSES Unit 2 Inservice Insp Program Plan for Pump & Valve Operational Testing, Per Generic Ltr 89-04 + (ML18026A591)
- ML18026A594 + (ML18026A594)
- PLA-4149, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-387/94-06 & 50-388/94-06 on 940510.Corrective Actions: Maint Mgt Developed Briefing Package Detailing Mgt Expectations for First Line Supervisors + (ML18026A595)
- 05000387/LER-1995-013-01, :on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve Repaired + (ML18026A596)
- ML18026A601 + (ML18026A601)
- ML18026A602 + (ML18026A602)
- ML18026A603 + (ML18026A603)
- ML18026A604 + (ML18026A604)