Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342A170 + (ML17342A170)
- IR 05000610/2007008 + (ML17342A172)
- ML17342A173 + (ML17342A173)
- ML17342A174 + (ML17342A174)
- IR 05000250/1985027 + (ML17342A177)
- ML17342A179 + (ML17342A179)
- L-85-351, Forwards Application Fee for NRC Review of 850520 Rev to Inservice Test Program for Pumps & Valves,Per 850903 Request + (ML17342A182)
- L-85-345, Notifies That Response to 850719 Request for Addl Info Re NUREG-0737,Item II.D.1, Performance Testing of Relief & Safety Valves, Will Be Submitted by 860530 + (ML17342A183)
- L-85-348, Informs That 851025 Deadline for Submittal of Dcrdr Supplemental Summary Rept Will Not Be Met Due to Delayed Work on Task Analysis.Rept Will Be Submitted by 860331,as Agreed Upon During 850801 Meeting W/Nrc + (ML17342A184)
- L-85-327, Responds to Violations Noted in Insp Repts 50-250/85-13 & 50-251/85-13.Corrective Actions:Requirement Will Be Added to Maint Procedure (MP)1407.7 for Reactor Vessel Stud Detensioning & Removal + (ML17342A185)
- L-85-342, Responds to Violations Noted in Insp Repts 50-250/85-24 & 50-251/85-24.Corrective Actions:Operating Procedures 0205.1 & 0205.2 Revised & Rod Drop Times for Shutdown Bank a Recalculated + (ML17342A188)
- ML17342A189 + (ML17342A189)
- IR 05000708/2008019 + (ML17342A191)
- ML17342A192 + (ML17342A192)
- ML17342A194 + (ML17342A194)
- IR 05000515/2006005 + (ML17342A197)
- L-85-338, Semiannual Radioactive Effluent Release Rept,Jan-June 1985 + (ML17342A198)
- L-85-363, Requests Deferral of 1-wk Maint & Surveillance Insps Until After Unit 4 Refueling Outage,Scheduled to Begin in Jan 1986.Deferral Necessary Due to Other Insps Scheduled & Impact Insps May Have on Key Plant Personnel + (ML17342A199)
- ML17342A201 + (ML17342A201)
- L-85-353, Responds to Violations Noted in Insp Repts 50-250/85-22 & 50-251/85-22.Corrective Actions:Administrative Procedures & Electrical Dept Guidelines Revised to Provide Detailed Instructions & Increased Use of Supervisory Hold Points + (ML17342A202)
- L-85-361, Forwards Revised Rev 8 to Fpltqar 1-76A, Topical QA Rept + (ML17342A204)
- ML17342A205 + (ML17342A205)
- ML17342A206 + (ML17342A206)
- L-85-368, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C Periodic Test, Per 10CFR50 App J + (ML17342A208)
- ML17342A210 + (ML17342A210)
- ML17342A211 + (ML17342A211)
- L-85-364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review,Data & Info Capability,Per 850815 Telcon & NRC 850719 Draft Technical Evaluation Rept.Reliability of Digital Data Processing Sys Also Discussed + (ML17342A212)
- ML17342A218 + (ML17342A218)
- L-85-381, Advises That Response to Generic Ltr 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps & Safety Evaluation Will Be Provided by 851220 + (ML17342A227)
- L-85-393, Advises of Need to Evaluate NRC SER Impact Re Westinghouse Owners Group ATWS Mitigating Sys Actuation Circuitry Generic Design Program to Determine Best Logic.Implementation Schedule Will Be Submitted 90 Days After SER Issuance + (ML17342A228)
- L-85-346, Withdraws Part of 840402 Application for Amends to Licenses DPR-31 & DPR-41,dealing W/Operability/Surveillance Requirements Referencing Inservice Test Programs.Revised Pages Encl + (ML17342A232)
- L-85-389, Forwards 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3, Per ASME Code.Owner Data Rept of Repairs or Replacement & Data Rept for Eddy Current Exam Results Included + (ML17342A234)
- ML17342A235 + (ML17342A235)
- ML17342A236 + (ML17342A236)
- ML17342A237 + (ML17342A237)
- IR 05000250/1985029 + (ML17342A239)
- L-85-398, Forwards Addl Info Re Category C-2 Steam Generator Tube Insps,Completing Response to Generic Ltr 85-02.Addl Tubes Will Be Inspected on case-by-case Basis + (ML17342A243)
- L-85-382, Responds to Violations Noted in Insp Repts 50-250/85-26 & 50-251/85-26.Corrective Actions:Revs to Administrative Procedure 0190.19 Will Be Discussed W/Foremen & Supervisors to Ensure Awareness of Work Order Guidelines + (ML17342A252)
- ML17342A254 + (ML17342A254)
- ML17342A256 + (ML17342A256)
- ML17342A257 + (ML17342A257)
- IR 05000250/1985028 + (ML17342A259)
- ML17342A262 + (ML17342A262)
- ML17342A263 + (ML17342A263)
- L-85-350, Forwards Revised Pages to Inservice Test Program for Pumps & Valves,In Response to NRC 850520 Request for Rev.Revs Reflect Test Requirements for MOV-750 & MOV-751 + (ML17342A264)
- ML17342A265 + (ML17342A265)
- L-85-418, Reaffirms Commitment to Submit Appropriate Tech Specs Re Availability & Performance Monitoring of Standby Steam Generator Feedwater Pumps & Provides General Info Concerning Status of Sys.Two Pumps Installed + (ML17342A266)
- L-85-390, Forwards IAEA, Design Info Questionnaire, in Response to NRC Re Safeguards Program.Questionnaire Withheld + (ML17342A267)
- ML17342A271 + (ML17342A271)
- IR 05000250/1985031 + (ML17342A273)
- ML17342A274 + (ML17342A274)