Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A823 + (ML17290A823)
- ML17290A824 + (ML17290A824)
- GO2-93-282, Application for Amend to License NPF-21,revising TS 3/4.6.1.4, Msivlcs to Allow Band of Acceptable Values for Msivlcs Blower Dilution Flow to Be Same in Content as Msivlcs Improved TS + (ML17290A825)
- ML17290A826 + (ML17290A826)
- ML17290A827 + (ML17290A827)
- 05000397/LER-1993-028, Application for Amend to License NPF-21 for Exclusion of Single RWCU Helb,In Ref to LER 93-028-00,submitted Via + (ML17290A828)
- GO2-93-283, Confirms Electronic Transfer of Funds as Payment for Civil Penalty Imposed in Enforcement Action EA-93-191 + (ML17290A829)
- GO2-93-285, Forwards Response to Concerns Communicated in Ltr Re Potential for Core Instability in Event of ATWS Followed by Trip of Recirculation Pumps + (ML17290A831)
- GO2-93-289, Responds to Violations Noted in Insp Repts 50-397/93-18, 50-397/93-24 & 50-397/93-29.Corrective Actions:Monitoring & Feedback Mechanism Enhanced by Incorporating Problem Classification Sys + (ML17290A832)
- GO2-93-291, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-36.Corrective Actions:Ts Change Request Submitted for Removal of Ref to Listed motor-operated Valves & Licensing Program Instruction 5.0 Revised + (ML17290A834)
- ML17290A835 + (ML17290A835)
- GO2-93-292, Requests That NRC Delay Review of IPE Until IPE Models Updated to Current Plant Configurations.Update Expected by 940528 + (ML17290A836)
- GO2-93-290, Special Rept:On 931126,main Control Room Received Stack Monitor Sys Trouble Annunciator & Status Display Indicated High Range Channel Failed self-test.Caused by Component Failure of Stack Monitor Detector.Replacement in Progress + (ML17290A838)
- GO2-93-296, Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys + (ML17290A839)
- ML17290A840 + (ML17290A840)
- ML17290A841 + (ML17290A841)
- ML17290A843 + (ML17290A843)
- IR 05000397/1993042 + (ML17290A845)
- GO2-93-294, Forwards Addl Info Re Issuance of Amend 119 to License NPF-21 Re TS 3/4.3.2. Isolation Actuation Instrumentation Response Time Testing + (ML17290A846)
- ML17290A847 + (ML17290A847)
- IR 05000397/1993043 + (ML17290A849)
- ML17290A851 + (ML17290A851)
- IR 05000397/1993046 + (ML17290A853)
- ML17290A854 + (ML17290A854)
- ML17290A855 + (ML17290A855)
- ML17290A856 + (ML17290A856)
- ML17290A857 + (ML17290A857)
- 05000397/LER-1992-020, :on 920508,discovered Low Elements for Low Pressure Core Spray Min Flow Control Not Properly Installed. Procedures Modified to Include Check of Instrument Startups Prior to Running Pump + (ML17290A861)
- GO2-93-299, Forwards Rev 12 of Emergency Preparedness Plan for WNP-1 & WNP-2 + (ML17290A862)
- GO2-93-297, Forwards Proprietary Evaluation of Unusual Differential Growth at Grand Gulf Unit 1, & Insp of Siemens Power Corp Fuel Assemblies at WNP-2,May 193 (EOC 8) + (ML17290A865)
- GO2-93-301, Advises That Completion Date for Corrective Actions for Items 1 & 2 of Insp Rept 50-397/93-36 Extended to 940114. Extension Allows Related Procedures to Be Revised to Match Procedure PPM 1.3.43 + (ML17290A876)
- GO2-94-003, Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures + (ML17290A878)
- ML17290A879 + (ML17290A879)
- ML17290A880 + (ML17290A880)
- GO2-94-006, Responds to 931026 RAI Re Power Uprate Review & Forwards Proprietary List of Glossary Terms.List Withheld + (ML17290A881)
- GO2-94-002, Provides Updated Info Re Resolution of SBO for WNP-2 + (ML17290A883)
- GO2-93-293, Special Rept:On 931116,loose Parts Detection Sys Channel 5 Did Not Pass Daily Channel Surveillance.Exact Cause Not Determined.Need to Provide Addl Notifications Should Other Channels Become Inoperable Not Necessary + (ML17290A887)
- 05000397/LER-1993-031, :on 931109,engineering Evaluation Determined That MCR HVAC Sys Will Not Maintain CR Temp.Caused by Inadequate Design Margin in Original Design.Per Written to Document Potential Analysis Concerns + (ML17290A888)
- GO2-94-008, Monthly Operating Rept for Dec 1993 for WNP-2 + (ML17290A889)
- GO2-94-001, Forwards Request for Approval to Revise WNP-2 Tornado Design Criteria Per RG 1.76 Section C.1.2 + (ML17290A890)
- ML17290A891 + (ML17290A891)
- GO2-94-004, Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 + (ML17290A892)
- ML17290A893 + (ML17290A893)
- ML17290A894 + (ML17290A894)
- GO2-94-005, Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements + (ML17290A896)
- ML17290A898 + (ML17290A898)
- ML17290A899 + (ML17290A899)
- GO2-94-010, Requests Discretionary Enforcement to Allow Continued Plant Operation W/Eccs Instrumentation Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits Specified in TS 3/4.3.3 + (ML17290A901)
- GO2-94-011, Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation + (ML17290A903)
- ML17290A904 + (ML17290A904)
- ML17290A905 + (ML17290A905)