- GO2-83-614, Forwards Response to Phase II of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Items Discussed Include Step Plugs,Vessel Cavity Plugs,Dryer Separator Pool Step Plugs,Fueling Slot Plugs & Auxiliary Hoist + (ML17277A664)
- ML17277A665 + (ML17277A665)
- GO2-83-636, Requests Relief from SER License Condition 8 Requiring Completion Due Date for Relocation of Instrument Panel from HPCS Diesel Generator Skid,Per 830616 Telcon.Completion Prior to Startup After First Refueling Outage Requested + (ML17277A670)
- GO2-83-631, Forwards List of Dates for Issuance & Expiration of Permits & Permit Numbers Per E Chan Telcon Request for Status of Various Permits & Licenses Noted in Table 12.1-1 of Environ Rept + (ML17277A671)
- GO2-83-596, Forwards Rept on Safety Parameter Display Sys Safety Analysis,Per 830415 Commitment & Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability + (ML17277A676)
- GO2-83-650, Informs of Electrical Safety Features Incorporated Into Design & Maint of Reactor Bldg Crane + (ML17277A683)
- GO2-83-648, Requests That Official Correspondence Be Sent to DW Mazur + (ML17277A684)
- GO2-83-661, Forwards Table 3.9-2b, Reactor Internals & Associated Equipment, to Be Submitted in Amend 32 to Fsar.Ser Confirmatory Issues 9 & 10 Closed + (ML17277A686)
- GO2-83-675, Forwards Response to NRC Request for Addl Info Re Procedures Generation Package + (ML17277A687)
- GO2-83-662, Forwards Listing of Preoperational & Acceptance Tests to Be Completed Past Fuel Load as Discussed at Caseload Forecast Panel 830712-14 Meetings.Completion of Tests Will Not Compromise Safety of Fuel Load & Startup Activities + (ML17277A688)
- GO2-83-660, Advises That BWR Owners Group Option 2 Will Be Implemented Per SER (NUREG-0892) Outstanding Issue 1.7(9), Mods to Automatic Depressurization Sys Logic. Reliance on RCIC Sys as HPCS Backup for Selected Accidents Eliminated + (ML17277A689)
- GO2-83-629, Forwards River Seismic Reflection Survey, Detailing Acquisition,Processing & Analysis of Marine Seismic Reflection Line Along Columbia River,Per 820629 Request for Supplemental Geology/Seismology SER Input + (ML17277A691)
- ML17277A693 + (ML17277A693)
- ML17277A694 + (ML17277A694)
- ML17277A696 + (ML17277A696)
- ML17277A702 + (ML17277A702)
- GO2-83-693, Proposes to Replace Source Range Monitors at First Refueling,Per Reg Guide 1.97,to Allow Time to Complete & Qualify Replacement & Accommodate Replacement Into Plant Design,Maint & Operating Procedures + (ML17277A703)
- GO2-83-684, Forwards Equipment Environ Qualification Files 018008, 256016,207002,207004 & 221001 Requested by a Masciantonio, for Review.W/O Encl + (ML17277A705)
- GO2-83-696, Forwards Rev 1 to 830713 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Procedures for Moving Three Lower dryer-separator Storage Pool Step Plugs Revised to Specify Max Lifting Height + (ML17277A706)
- GO2-83-580, Resubmits Amend 30 to FSAR Due to Printer Collation Problem + (ML17277A726)
- GO2-83-705, Forwards Revised FSAR Figures Documenting Analyses of SER Confirmatory Issue 1 Re Final Pipe Break Locations & Design of Pipe Whip Restraints.Final Break Locations Based on Completion of as-built Programs & Final Stress Analysis + (ML17277A737)
- ML17277A740 + (ML17277A740)
- ML17277A746 + (ML17277A746)
- GO2-83-704, Forwards Proposed Environ Protection Plan for Nonradiological Programs + (ML17277A747)
- ML17277A748 + (ML17277A748)
- ML17277A749 + (ML17277A749)
- GO2-83-726, Closes SER (NUREG-0892) Confirmatory Issue 14,modifying RCIC Pipe Break Detection Circuitry Sys to Prevent Spurious Isolation of RCIC Sys.Changes Will Be Incorporated Into Next FSAR Amend + (ML17277A751)
- GO2-83-710, Responds to SER Licensing Condition 4 Re Inadequate Core Cooling (TMI Item II.F.2).Util Will Provide plant-unique Response Following Review of NRC Evaluation of BWR Owners Group Program.Resolution Should Not Affect Fuel Loading + (ML17277A752)
- GO2-83-724, Advises That SER (NUREG-0892) Confirmatory Issue 22 Re TMI Items II.K.1.5, ESF Functioning & II.K.1.10, Safety- Related Sys Operability Status, Will Remain Open Until Corrective Actions Completed + (ML17277A753)
- ML17277A766 + (ML17277A766)
- GO2-83-748, Forwards Radwaste Bldg Ventilation Exhaust Flow Measurement Description in Response to Questions During Radiological Effluent Tech Spec Discussions + (ML17277A768)
- GO2-83-764, Confirms 830812 Telcon W/R Auluck Re Change in Current Projected Fuel Load of Early Nov 1983.Meeting W/Nrc Mgt to Discuss Fuel Load & Other Issues Requested + (ML17277A769)
- GO2-83-756, Advises That Jet Pump Holddown Beams Retensioned,Per 801204 Commitment & Section 3.9.5 of SER (NUREG-0892).Daily Jet Pump Operability Surveillance Testing & Periodic Insps Provide Addl Assurance of Proper Operation + (ML17277A770)
- GO2-83-765, Advises That as of 830708,applicable Personnel Have Attended & Completed Mitigating Core Damage Training Classes or Equivalent,Per TMI Action Item II.B.4 & SER Confirmatory Item 21 Responses + (ML17277A772)
- GO2-83-732, Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl + (ML17277A773)
- ML17277A776 + (ML17277A776)
- ML17277A777 + (ML17277A777)
- ML17277A778 + (ML17277A778)
- ML17277A779 + (ML17277A779)
- ML17277A780 + (ML17277A780)
- GO2-83-727, Forwards Draft Test Procedure & FSAR Section Re Verification of UHS Performance.One Test Objective Is to Suppl & Extend Wind Speed Range of Previous Drift Loss Testing.Test to Be Conducted When Plant & Environ Conditions Optimum + (ML17277A782)
- ML17277A784 + (ML17277A784)
- ML17277A785 + (ML17277A785)
- GO2-83-785, Provides Addl Response to Generic Ltr 83-24 Re TMI Action Plan Item I.G.1.Response Provides Justification for Elimination of Station Blackout Test & Restatement of WPPSS, Unit 2 Approach to Compliance w/I.G.1 + (ML17277A787)
- ML17277A789 + (ML17277A789)
- ML17277A795 + (ML17277A795)
- ML17277A796 + (ML17277A796)
- ML17277A797 + (ML17277A797)
- GO2-83-828, Restates Util Commitment to Install Diesel Starting Air Dryers at First Refueling Outage,Not by Fuel Load. Installation Unnecessary at Fuel Load to Complete Safe Reliable Station + (ML17277A798)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (ML17277A799)
- ML17277A800 + (ML17277A800)