Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17241A275 + (ML17241A275)
- RS-17-100, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits + (ML17241A278)
- 05000335/LER-1980-053, Forwards LER 80-053/03L-0 + (ML17241A318)
- ML17241A319 + (ML17241A319)
- ML17241A324 + (ML17241A324)
- ML17241A326 + (ML17241A326)
- 05000389/LER-1999-003, :on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With + (ML17241A327)
- ML17241A328 + (ML17241A328)
- ML17241A329 + (ML17241A329)
- ML17241A331 + (ML17241A331)
- ML17241A334 + (ML17241A334)
- IR 05000335/1999002 + (ML17241A336)
- ML17241A338 + (ML17241A338)
- ML17241A342 + (ML17241A342)
- ML17241A344 + (ML17241A344)
- ML17241A345 + (ML17241A345)
- ML17241A350 + (ML17241A350)
- ML17241A353 + (ML17241A353)
- ML17241A354 + (ML17241A354)
- 05000335/LER-1999-002-01, :on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With + (ML17241A355)
- L-99-128, Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 + (ML17241A356)
- ML17241A357 + (ML17241A357)
- ML17241A358 + (ML17241A358)
- ML17241A359 + (ML17241A359)
- L-99-130, Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 + (ML17241A360)
- ML17241A361 + (ML17241A361)
- ML17241A362 + (ML17241A362)
- L-99-141, Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 + (ML17241A364)
- ML17241A368 + (ML17241A368)
- ML17241A370 + (ML17241A370)
- ML17241A371 + (ML17241A371)
- ML17241A372 + (ML17241A372)
- ML17241A376 + (ML17241A376)
- ML17241A378 + (ML17241A378)
- ML17241A379 + (ML17241A379)
- ML17241A383 + (ML17241A383)
- ML17241A385 + (ML17241A385)
- ML17241A386 + (ML17241A386)
- ML17241A388 + (ML17241A388)
- ML17241A389 + (ML17241A389)
- ML17241A390 + (ML17241A390)
- IR 05000335/1999003 + (ML17241A392)
- 05000389/LER-1999-004, :on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With + (ML17241A394)
- ML17241A396 + (ML17241A396)
- L-99-156, Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in + (ML17241A397)
- ML17241A398 + (ML17241A398)
- ML17241A400 + (ML17241A400)
- L-99-153, Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 + (ML17241A401)
- 05000389/LER-1999-006, :on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With + (ML17241A403)
- 05000389/LER-1999-005, :on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With + (ML17241A404)
- ML17241A405 + (ML17241A405)