Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A236 + (ML17228A236)
- ML17228A238 + (ML17228A238)
- ML17228A240 + (ML17228A240)
- ML17228A243 + (ML17228A243)
- L-93-191, Forwards Rev 0 of PSL-200, St Lucie...Unit 2 Second ISI Interval Program Plan & Schedule & Rev 0 of PSL-201, St Lucie...Unit 2 Second ISI Interval ISI Selected Component Schedule. Subj Interval Begins on 930808-200803 + (ML17228A244)
- ML17228A245 + (ML17228A245)
- ML17228A246 + (ML17228A246)
- ML17228A247 + (ML17228A247)
- IR 05000335/1993012 + (ML17228A250)
- L-93-198, Monthly Operating Repts for Jul 1993 for St Lucie,Units 1 & 2 + (ML17228A253)
- ML17228A255 + (ML17228A255)
- L-93-207, Comments on Suppl to GL 86-10, Fire Endurance Acceptance Criteria for Fire Barrier Sys Used to Separate Redundant Safe Shutdown Trains within Same Fire Area + (ML17228A258)
- L-93-206, Forwards St Lucie Nuclear Plant,Unit 1 Reactor Containment Bldg ILRT Rept,Documenting Results of Type a Leakage Rate Testing & Including Suppl Controlled Leakage Rate Test Method Utilized for Verification.Test Completed on 930520 + (ML17228A262)
- ML17228A263 + (ML17228A263)
- ML17228A264 + (ML17228A264)
- L-93-183, Application for Amend to License NPF-16,deleting Option of Using Movable Incore Detector to Determine Incore Instrumentation Sys Operability from TS 3.3.3.2 + (ML17228A265)
- ML17228A266 + (ML17228A266)
- ML17228A267 + (ML17228A267)
- ML17228A268 + (ML17228A268)
- L-93-127, Application for Amend to License NPF-16,requesting Approval of Improved Methodology, Extended Statistical Combination of Uncertainties (Escu). Proprietary Rept CEN-371(F)-P Encl.Rept Withheld (Ref 10CFR2.790(a)(4)) + (ML17228A269)
- ML17228A270 + (ML17228A270)
- ML17228A271 + (ML17228A271)
- ML17228A272 + (ML17228A272)
- IR 05000335/1993018 + (ML17228A274)
- ML17228A276 + (ML17228A276)
- ML17228A280 + (ML17228A280)
- FOIA/PA-2017-0634 + (ML17228A284)
- L-93-215, Informs That CEOG Rept CEN-387-P,Rev 1,applicable & Bounds Plant & Except for NRC Bulletin 88-011,Action Item 1.d, Updating of Plant Specific Stress & Fatigue Analyses,Actions in Bulletin Complete.Item to Be Complete by 940131 + (ML17228A286)
- ML17228A289 + (ML17228A289)
- L-93-232, Responds to 930728 RAI Response to GL 92-01 Rev 1, Reactor Vessel Structural Integrity Per 10CFR50.54(f) + (ML17228A292)
- L-93-236, Forwards St Lucie Unit 1,Cycle 12 Startup Physics Testing Rept + (ML17228A293)
- ML17228A294 + (ML17228A294)
- ML17228A295 + (ML17228A295)
- ML17228A296 + (ML17228A296)
- ML17228A297 + (ML17228A297)
- ML17228A298 + (ML17228A298)
- L-93-237, Forwards Rev 0 of Second ISI Interval Second Insp Period Second Outage 1993 Summary Rept Submittal. Rept Provides Info Required to Be Included in SG Tube ISI Special Rept + (ML17228A300)
- ML17228A301 + (ML17228A301)
- ML17228A302 + (ML17228A302)
- L-93-231, Monthly Operating Repts for Aug 1993 for St Lucie,Units 1 & 2 + (ML17228A303)
- ML17228A305 + (ML17228A305)
- ML17228A306 + (ML17228A306)
- ML17228A309 + (ML17228A309)
- L-93-243, Forwards Spiked Sample Results Analyzed by Util in Response to NRC .Results Back Decay Corrected to 911010 + (ML17228A310)
- L-93-229, Forwards Response to Suppl 5 to GL 89-10, Inaccuracy of Motor Operated Valve Diagnostic Equipment, for Units 1 & 2 + (ML17228A311)
- ML17228A312 + (ML17228A312)
- ML17228A313 + (ML17228A313)
- L-93-235, Application Amend to License NPF-16,deleting TS 6.2.3, Independent Safety Engineering Group & Adding TS 6.5.2.9, Technical Review Responsibilities + (ML17228A314)
- ML17228A315 + (ML17228A315)
- ML17228A316 + (ML17228A316)
- ML17228A318 + (ML17228A318)