Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17213B108 + (ML17213B108)
- ML17213B109 + (ML17213B109)
- ML17213B110 + (ML17213B110)
- ML17213B111 + (ML17213B111)
- L-83-127, Informs of Intent to Submit Assessment of Operability of Large Pratt Purge & Vent Valves by 830331,per NRC 830216 Request + (ML17213B112)
- ML17213B117 + (ML17213B117)
- ML17213B119 + (ML17213B119)
- ML17213B120 + (ML17213B120)
- L-83-138, Discusses Commitment Re Fragmentation of Cladding Embrittlement,Per 830303 Meeting.Results of ECCS Analysis Encl.Info Previously Discussed in Section 4.2.3(a) of SER (NUREG-0843) + (ML17213B121)
- L-83-140, Forwards Proprietary C-E 810821 Responses to Bnwl Questions Re Statistical Combination of Uncertainties That Form Basis of Methodology Used in Support of Facility reloads.C-E Responses Withheld (Ref 10CFR2.790).Affidavit Encl + (ML17213B122)
- L-83-137, Forwards Comprehensive Vibration Assessment Program,Final Summary Rept, Completing Action Indicated in SER,NUREG- 0843,Section 3.9.2.3.Rept Favorably Correlates Reactor Vibrational Characteristics W/Prototype Reactor + (ML17213B124)
- ML17213B125 + (ML17213B125)
- ML17213B127 + (ML17213B127)
- L-83-129, Application for Amend to License DPR-67 Changing Tech Specs to Modify Surveillance Requirements & Bases Associated W/Chlorine Detection Sys + (ML17213B130)
- ML17213B131 + (ML17213B131)
- ML17213B132 + (ML17213B132)
- L-83-139, Forwards Addl Info Re 821210 Degraded Grid Voltage Protection Submittals,Per 820223 Telcon.Voltage/Time Setpoints Will Be Supported by Two Undervoltage Devices + (ML17213B133)
- L-83-145, Submits Addl Info Re Human Factors Issues Under Appeal,Per NRC Mgt 830224-25 Site Visit.Current Configuration of Control Board 206 Will Not Pose Increased Risk to Health & Safety Nor Involve Unreviewed Safety Question + (ML17213B137)
- ML17213B138 + (ML17213B138)
- ML17213B139 + (ML17213B139)
- ML17213B140 + (ML17213B140)
- ML17213B141 + (ML17213B141)
- ML17213B142 + (ML17213B142)
- ML17213B143 + (ML17213B143)
- ML17213B144 + (ML17213B144)
- ML17213B145 + (ML17213B145)
- ML17213B146 + (ML17213B146)
- ML17213B147 + (ML17213B147)
- L-83-142, Responds to 821210 Request for Info on Use of Raychem Flamtrol Cables.Only Cable Affected Is Conductor 2AWG (1-3/C 2) 480-volt Power Cable,Utilized in Six safety-related Applications.Cables to Be Replaced + (ML17213B149)
- ML17213B159 + (ML17213B159)
- L-83-149, Discusses Concerns Raised by Equipment Qualification Branch Re Testing of pre-aged Batteries,To Demonstrate Seismic Qualification.Batteries Will Be Replaced After 10 Yrs from Purchase Date or Addl Test Data Will Be Provided + (ML17213B161)
- L-83-150, Forwards Addl Info to Clarify Aspects of Auxiliary Feedwater Pump Endurance Test Rept,Per Commitment in SER + (ML17213B162)
- ML17213B163 + (ML17213B163)
- ML17213B164 + (ML17213B164)
- L-83-157, Forwards Addl Info Requested at 830315 Meeting Re Compliance of Surveillance Requirements for Ac Sources w/plant-specific Design.Tech Specs 3/4.8.1.1 Changed as Noted + (ML17213B165)
- L-83-153, Advises That Remaining Active safety-related Valves, Including safety-related Check Valves,Will Be Stroked After Valve Safety Sys Tested During Hot Functional Testing After Core Load But Prior to Initial Criticality + (ML17213B166)
- L-83-161, Forwards Proprietary Rev 0 to Justification of Xnb DNB Correlation for St Lucie Unit 1. Rept Withheld (Ref 10CFR2.790).Affidavit Encl + (ML17213B168)
- L-83-169, Forwards Present Schedule to Install TSI Matl Flame Impingement Shields on Lower Most Cable Trays in Containment Cable Tray Racks + (ML17213B170)
- L-83-168, Forwards Final Response to TMI Item II.D.1, Performance Testing of BWR & PWR Relief & Safety Valves. Conclusions Reached in Encl Evaluation on Operability of Pressurizer Safety Valves & PORVs Satisfy Commitment + (ML17213B171)
- ML17213B172 + (ML17213B172)
- L-83-163, Informs That Amend 14 to FSAR Will Be Issued Approx 4 Months Following Issuance of OL + (ML17213B174)
- L-83-164, Forwards Suppl 1 to Analytical Justification of Seismic Test Adequacy of St Lucie,Unit 2 CPC & Ni Modules in Reactor Protection Sys Cabinet, Operability Rept + (ML17213B175)
- ML17213B176 + (ML17213B176)
- ML17213B177 + (ML17213B177)
- L-83-151, Forwards Revised Justification for Interim Operation,Prior to Installation of Containment Flame Impingement Shields, Highlighting Measures Taken to Provide Fire Protection in Affected Areas Above & Beyond Present NRC Requirements + (ML17213B178)
- L-83-158, Forwards Const/Startup Monthly Status Rept for Feb 1983. Current Target Fuel Load Date Is 830323 + (ML17213B179)
- ML17213B180 + (ML17213B180)
- ML17213B181 + (ML17213B181)
- L-83-171, Advises That Essential Apparatus Will Be Installed by End of First Refueling to Test 8-inch Minipurge Valves in Containment Ventilation Sys Every 92 Days,Per Tech Spec 4.6.1.7.4 + (ML17213B182)
- L-83-170, Forwards Proprietary Exxon Nuclear Analysis of Power Distribution Measurement Uncertainty for St Lucie,Unit 1. Responses Re Overpressure Mitigating Sys & Cycle 6 Reload Encl.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML17213B183)
- ML17213B187 + (ML17213B187)