SEISMIC QUALIFICATION TEST REPORT for CORE PROTECTION CALCULATOR NO.

1 CORE PROTECTION CALCULATOR NO.

2 Report Number N-46474PO38368 for Combustion Engineering P.O.

9873222/13172 Performed by re er, pp >canon ngsneer Prepared by eanuracos, Cognizant ng>neer Date Approved Hy A. Gura, Director of Engineering 03~ ~0~

830309 PDR ADOCK OS000389 A

PDR Rev.

O1

RECORD OF REVISIONS NO.

DATE PAGES INVOLVED PREPARED BY APPROVALS 00 01 6/30/80 8/12/80 A11 1,3,5,6,7,8 and Appendices" L. Geanuracos L. Geanuracos A. Gura A. Gura

Pa~aqua N

1.0 2.0 3.0 "4.0 5.0 6.0

'7.0 8.0 TABLE OF CONTENTS Ab tract

'eferences Test Items Test Date and Location Test Description Test Results Coments Test Equipment

~Pa e No.

2 2

2 2

2 4

8 8

Illustrations Fig. I 510359 Test Fixture Mounting Instructions

~Pa e No.

9 10 APPENDIX A

The Dayton T. Brown Report on the Seismic Test Program Performed on One CPCl and One CPC2 Report No. DTB04R80-0479, Revision A.

'nclosures El

,.E2 E3 E4 Seismic Test and Results Photographs Seismic Test Procedure Test Axes Designation Sketch and Test Point Locations APPENDIX B

The Devar ENI, Seismic and Environmental gualification Test Procedure for Core Protection Calculator No.

1 and Core Protection Calculator No. 2.

Page 1 of 10

0

1.0 ABSTRACT The purpose of this report is to describe the electrical operation of one CPC 1 and one CPC 2 as'easured

before, during and after seismic testing.

2.0 REFERENCES

A.

EHI, Seismic and Environmental gualification Test Procedure, DEVAR Register N-46474 B.

C.

Dayton T. Brown Test Specification DTB 25P79-0285 Revision B

Dayton T. Brown Test Report DTB04R80-0479 3.0 TEST ITEHS A.

One (1) Core Protection Calculator No.

1 Serial No. 0030267 B.

One (1) Core Protection Calculator No.

2 Serial No. 0030268 4.0 TEST DATE AND LOCATION The test was performed on April 15, 1980 at the Dayton T. Brown Test Facility, Bohemia, New York.

5.0 TEST DESCRIPTION 5.1, The test items were mounted in the vibration fixture, one above the other, CPC 2 on the top.

Each box was fastened to the fixture using four 1/4 - 20 x 5/8 binding head screws backed with flat washers.

The backs of the test i tems were tied together using two 1/16 inch thick stainless steel plates (See Drawing No. 510359).

5.2 Electrical inputs were supplied to the calculators and DC voltage outputs were monitored at selected test points using a digital voltmeter.

Output voltages were also monitored using a recording oscillograph in order that rapid changes in voltage such as spikes could be detected.

Page 2 of 10

5.3 A continuity tester was placed between terminals 49 and 63 of CPC 2 in order to detect relay contact closure.

The relays'ontacts were opened and closed during seismic testing in order to assure proper operation..

5.4 The calculators were subjected to five operating basis earth-quakes (OBE) and one safe-shutdown earthquake (SSE) with the excitation applied along the YZ axis (See Fig. 1).

In order to retest the calculators with )he excitation along the XZ axis, the-test fixture was rotated 90 on the shake table.

The cal-culators were resubjected to five operating-basis earthquakes and one safe-shutdown earthquake.

5.5 For a complete description of the Seismic Test, reference Enclo-sure 1 of Appendix A - The Dayton T. Brown Seismic gualification Test Procedure on Two Core Protection Calculators (CPCl and CPC2),

Report No.

OTB 25P79-0285 Rev.

B.

5.6 For a complete description of the electrical operation of the calculators during the seismic testing, reference Appendix B-The Devar EMI, Seismic and Environmental gualification Test Pro-cedure.

Page 3 of 10

0

6.0 TEST RESULTS 6.1 Base readings prior to.seismic testing:

Terminal 4,

11 23 29 45 49 CPC 1

Base Readin

. 280

-.002 7.532 2.948

2. 399
1. 783 Terminal 7

16 21 28 30 55 CPC 2

Base Readin 11.437

2. 981 5.399 5.799

-.001 3.977 Page 4 of 10

6.2 Terminal Tes t Number Reading Oeviation From Base Terminal Test Number Reading Oeviation From Base CPC1 CPC2 OBE 1

ll 23 29-45 49 OBE 2 YZ Axis

.280

-.002 7.532 2.948 2.398 1.783 YZ Axis

.000

.000

.000

.000

.001

.000 7

16 21 28 30 55 11.436

2. 981 5.389 5.788

.020 3.977

.001

.000

.010

.011

.021

. 000.

4 1'l 23 29 45 49 OBE 3 I

.280

-.002 7.532 2.948 2.398 1.783 YZ Axis

.000

.000

.000

.000

.001

.000 7

16 21 28 30 55 11.436

'- 2.981 5.400 5.799

-.001 3.978

.001

.000

.001

.000

.000

.001

'll 23:

29 45 49 OBE 4

.280

-.002 7.532 2.948

2. 398
1. 783 YZ Axis

.000

.000

.000

.000

..001

.000 7

16

'1.

28 30 55

-11.436 2-981 5.400 5.799

~ -.001 3.978

.001

.000

.001

.000

.000

.001 11 23'9 45 49 OBE 5

.280

-.002 7.532 2.948 2.399

-1. 783 YZ Axis

.000

.000

.000

.000

.000

.oon 7

16 21 28 30 55

-11.437

-2. 981

5. 400
5. 799-

.001 3.977

.000

. 000.

. 001

.000

.000

.000 11 23 29 45 49

.280

-.002 7.531 2.948 2.399

1. 784

..000

.000

.001

.000

.000

-001

~

7 16 21 28 30 55

-11.437

2. 981 5.400 5.799

-.001 3.977

.000

.000

.001

.000

.noo

.000 Page 5 of 10

0

Terminal Number SSE 1

Test Deviation Reading From Base CPC1 YZ Axis Terminal Test Number Reading CPC2 Deviation From Base 4ll 23

, 29 45 49 OBE 1

.280

-.002 7.532

- 2. 948

2. 398
1. 783 XZ Axis

. 000

.000

-000

.000

-001

-000 7

16 21 28 30 55

-11.436 2.981 5.400 5.799

-.001 3.977

.001

.000

.001

.000

.000

.000 4ll 23 29 45 49 OBE 2 4ll 23 29 45 49 OBE 3

.280

-.002 7.532

2. 948 2.398
1. 783 XZ Axis

.279

-.002 7.532

2. 948
2. 399
1. 783 XZ Axis

.000

.000

.000

.000

.001

.000

.001

.000

.000

-000

.001

.000 7

16 21 28 30 55 7

16 21 28 30 55

-11.437 2.981 5.400 5.799

-.001 3.977

-11. 437

2. 981 5.399 5.799

-.001 3.977

.000

.000

.001

.000

.000

.000

.000

.000

.000

.000

.000

.000 4

11 23 29 45 49 OBE 4

. 279

-. 002 7.532 2.948 2.398

1. 783 XZ Axis

.001

.000

-000

.000

. 001

. 000 7

16 21 28 30 55

-11.437

2. 981 5.400 5.799

-.001

3. 977

.000

.000

.001

.000

.000

.000 4

11 23 29 45'9

.280

-.001 7.532 2.948

2. 398
1. 783

..000

. 001

.000

.000

.001

.000 7

16 21 28 30'5' 11.437

2. 981 5.400 5.799

-.001 3.977

.000

.000

.001

.000

.000

.000 Rage 6 of 10

Terminal Tes t Number; Reading Deviatio n From Base Terminal Test Number Reading Deviation From Base

.OBE 5 11 23 29 45

~

49 CPC1 XZ Axis

.280

-.002 7-532 2.948 2.398 1.783

.000

~.000

.000

.000

.001

.000 7

16 21 28 30 55 CPC2 11.437

2. 981 5.400 5.799

-.001 3.978

.000

.000

.001

.000

..000

.001 l

SSE 1

. XZ Axis 6.3 11.437 2.981 5.400 5.799

-.001 3.977 4

.280

.000

'. 000 11

-.002

.000 16

.000 23 7.532

.000 21

.001 29 2.948

.000 28

.000 45 2.398

.001 30

.000 49 1.783

.000 55

.000 For~detailed information on the physical response of the calculators to the Seismic testing, reference Appendix A - The Dayton T. Brown Report on the Seismic Test Program Performed on One CPC1 and One CPC2, Report Number DTB04R80-0479 Rev.

A Page 7 of 10

h

6.3 The test voltages were continuously monitored during each shake using a recording oscillograph.

Examination of the recordings revealed no spikes or other anomalies due to testing.

6.4 7.0 The relay contacts of CPC 2 were caused to open and close once during each shake.

The relays continued to operate properly throughout the test.

COMMENTS 7.1 7.2 8.0 During the first shake (OBE 1, Y Z Axis), the voltage at Terminal 30 of CPC 2 jumped 21 mi,llivolts from the base reading.

The increase in voltage,

however, was not due to seismic testing.

It was found that switching on power to

~

the recording oscillograph had caused the peak detector module to jump to a higher state.

The reset button was de-pressed causing all readings to return to their base values.

Seismic testing was continued without further incidence.

~ The Calculators, CPC1 and

CPC2, having met the.requirements for qualification of Seismic-Category 1 instrumentation, are new considered seismically qualified for use in nuclear gen-erating stations.

TEST E UIPMENT 8.1 8.2 Item:

Manufacturer:

Model:

Serial Number:

Last Cal. Date:

Cal.

Due Date:

Item:

Manufacturer:

Model:

Serial Number:

Last Cal. Date:

Cal.

Due Date:

Digital Voltmeter Keithley 191 17909 3/80 9/80 Osci 1 1 ograph

, Consolidated El ectrodynamics 5-124 ME 02905 4/14/80 Prior to using Page 8 of'0

0

CPC 2 CPC I

FIG. I Test fixture po~itioned for excitation along Y-Z axis.

Rotate test fixture 90 on table for excitation along X-Z axis..

Page 9 of l0

~

~

~

I

~

~

I

~

I I

I I

~