Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16217A460 + (ML16217A460)
- ML16217A475 + (ML16217A475)
- ML16218A005 + (ML16218A005)
- ML16218A197 + (ML16218A197)
- ML16218A224 + (ML16218A224)
- ML16218A236 + (ML16218A236)
- IR 05000397/2016007 + (ML16218A239)
- ML16218A256 + (ML16218A256)
- ML16218A261 + (ML16218A261)
- L-16-201, Firstenerqy Nuclear Operating Companys (Fenocs) Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (ML16218A279)
- IR 05000313/2016009 + (ML16218A299)
- IR 05000282/2016002 + (ML16218A357)
- IR 05000285/2016002 + (ML16218A358)
- IR 05000413/2016404 + (ML16218A364)
- IR 05000528/2016002 + (ML16218A365)
- ML16218A367 + (ML16218A367)
- IR 05000382/2016002 + (ML16218A383)
- ML16218A390 + (ML16218A390)
- ML16218A418 + (ML16218A418)
- 05000387/LER-2015-013-01, Regarding Loss of Differential Pressure in Zone I of Secondary Containment Due to Solenoid Valve Failure + (ML16218A443)
- IR 05000443/2016002 + (ML16218A455)
- ML16218A472 + (ML16218A472)
- 05000296/LER-2016-006, Regarding High Pressure Coolant Injection System Found to Be Inoperable During Testing + (ML16218A477)
- ML16218A483 + (ML16218A483)
- ML16218A485 + (ML16218A485)
- ML16218A488 + (ML16218A488)
- IR 05000313/2016405 + (ML16218A490)
- ML16218A494 + (ML16218A494)
- ML16218A499 + (ML16218A499)
- IR 05000482/2016002 + (ML16218A501)
- ML16218A507 + (ML16218A507)
- ML16221A001 + (ML16221A001)
- ML16221A002 + (ML16221A002)
- ML16221A003 + (ML16221A003)
- ML16221A004 + (ML16221A004)
- ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change + (ML16221A029)
- RC-16-0126, License Amendment Request - LAR-16-03130 Change of the Completion Date of Implementation Milestone 8 + (ML16221A034)
- ML16221A061 + (ML16221A061)
- NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 + (ML16221A066)
- ML16221A084 + (ML16221A084)
- IR 05000220/2016002 + (ML16221A101)
- ML16221A165 + (ML16221A165)
- L-16-254, Supplement to Request to Extend Certain Reactor Vessel Inspections from 10 to 20 Years (Request 2-TYP-3-BN-01) + (ML16221A180)
- 05000390/LER-2016-010, Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado + (ML16221A181)
- LIC-16-0058, Intent to Comply with ASME Code Case N-729-1, Alternative Examination Requirements for PWR Reactor Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration Welds Section XI, Division 1, as Written + (ML16221A212)
- ML16221A218 + (ML16221A218)
- ML16221A273 + (ML16221A273)
- ML16221A274 + (ML16221A274)
- ML16221A275 + (ML16221A275)
- L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I + (ML16221A276)
- IR 05000277/2016002 + (ML16221A342)