Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC 2012-0088, 10 CFR 50.55a Request, Relief Request 1 -RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Lnlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval + (ML12318A125)
- ML12318A127 + (ML12318A127)
- ML12318A128 + (ML12318A128)
- ML12318A145 + (ML12318A145)
- ML12318A159 + (ML12318A159)
- ML12318A160 + (ML12318A160)
- LR-N12-0324, 90-Day Response to NRC Bulletin 2012-01: Design Vulnerability in Electric Power System + (ML12318A175)
- AEP-NRC-2012-83, Communications Assessment Requested by Nuclear Regulatory Commission Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3 + (ML12318A176)
- 05000374/LER-2012-001, Regarding 2B Diesel Generator Declared Inoperable Due to Excessive Air Start Receiver Blowdown Caused by a Degraded Drain Valve + (ML12318A187)
- ML12318A209 + (ML12318A209)
- IR 05000458/2012004 + (ML12318A212)
- ML12318A234 + (ML12318A234)
- ML12318A246 + (ML12318A246)
- ML12318A259 + (ML12318A259)
- ML12318A268 + (ML12318A268)
- IR 05000382/2012405 + (ML12318A270)
- ML12318A275 + (ML12318A275)
- ML12318A280 + (ML12318A280)
- L-PI-12-096, Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System. + (ML12318A285)
- ML12318A285 + (ML12318A285)
- NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 + (ML12318A286)
- PNO-I-12-008, Fitzpatrick Notice of Unusual Event for Fire in Main Transformer + (ML12318A299)
- NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases + (ML12318A302)
- NRC-12-0067, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases + (ML12318A302)
- ML12318A319 + (ML12318A319)
- ML12318A322 + (ML12318A322)
- ML12318A335 + (ML12318A335)
- NRC-12-0071, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process + (ML12318A337)
- ML12318A341 + (ML12318A341)
- IR 05000361/2012010 + (ML12318A342)
- ML12318A357 + (ML12318A357)
- ML12318A359 + (ML12318A359)
- ML12318A362 + (ML12318A362)
- ML12318A372 + (ML12318A372)
- ML12318A373 + (ML12318A373)
- ML12318A376 + (ML12318A376)
- ML12318A379 + (ML12318A379)
- ML12318A383 + (ML12318A383)
- PNO-III-12-016, November 2012 + (ML12318A384)
- IR 05000275/2012004 + (ML12318A385)
- ML12318A394 + (ML12318A394)
- ML12318A396 + (ML12318A396)
- ML12318A397 + (ML12318A397)
- ML123190282 + (ML123190282)
- ML12319A006 + (ML12319A006)
- NL-12-143, Response to Request for Additional Information on Proposed License Amendment Regarding Connection of Non Seismic Purification Line to Refuel Water Storage Tank + (ML12319A007)
- NL-12-144, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049) + (ML12319A008)
- NL-12-145, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (ML12319A009)
- ML12319A011 + (ML12319A011)
- ML12319A012 + (ML12319A012)
- ML12319A014 + (ML12319A014)