Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12306A358 + (ML12306A358)
- ULNRC-05931, Fitness for Duty Program Performance Data for Ameren Missouri Callaway Energy Center + (ML12306A361)
- ML12306A367 + (ML12306A367)
- ML12306A390 + (ML12306A390)
- ML12306A393 + (ML12306A393)
- ML12306A397 + (ML12306A397)
- ML12306A409 + (ML12306A409)
- ML12306A415 + (ML12306A415)
- IR 05000400/2012009 + (ML12306A439)
- ML12306A444 + (ML12306A444)
- ML12306A445 + (ML12306A445)
- ML12306A446 + (ML12306A446)
- L-2012-394, Official Service List Change + (ML12306A447)
- ML12306A454 + (ML12306A454)
- ML12306A478 + (ML12306A478)
- ML12306A481 + (ML12306A481)
- ML12306A498 + (ML12306A498)
- ML12306A502 + (ML12306A502)
- ML12306A505 + (ML12306A505)
- ML12306A509 + (ML12306A509)
- ML12306A510 + (ML12306A510)
- ML12306A511 + (ML12306A511)
- GNRO-2012/00125, Final Feedwater Temperature Reduction License Amendment Request + (ML12306A519)
- RC-12-0154, Reactor Vessel Head Penetration Weld Repair Under WCAP-15987 + (ML12306A530)
- DCL-12-107, Supplement to PG&E Letter DCL-11-059, License Amendment Request 11-04, Revision to Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater (AFW) System, TS 3.8.1, Ac... + (ML12306A533)
- PNP 2012-094, 2012 Steam Generator Tube Inspection Report + (ML12306A534)
- ML12306A540 + (ML12306A540)
- ML12306A546 + (ML12306A546)
- ML12306A601 + (ML12306A601)
- ML12306A602 + (ML12306A602)
- ML12306A603 + (ML12306A603)
- ML12306A604 + (ML12306A604)
- ML123070255 + (ML123070255)
- ML12307A018 + (ML12307A018)
- L-2012-368, License Amendment Request No. 212 Regarding Potential Non-Conservative Action and Surveillance Requirement in Technical Specification 3.5.2 on ECCS Subsystems + (ML12307A019)
- RA-12-041, Carolina Power & Light Company and Florida Power Corporations Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number E + (ML12307A020)
- RA-12-039, Carolina Power & Light Company & Florida Power Corporations Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Even + (ML12307A021)
- ML12307A022 + (ML12307A022)
- ML12307A023 + (ML12307A023)
- ML12307A026 + (ML12307A026)
- L-MT-12-091, Extended Power Uprate: Supplement to Revise Technical Specification Setpoint for the Automatic Depressurization System Bypass Timer + (ML12307A036)
- ML12307A037 + (ML12307A037)
- ML12307A038 + (ML12307A038)
- ML12307A039 + (ML12307A039)
- NG-12-0447, NextEra Energy Duane Arnold, LLC - Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System + (ML12307A055)
- RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions + (ML12307A056)
- ML12307A071 + (ML12307A071)
- LR-N12-0326, Submittal of Relief Request Associated with the Third Ten-Year Inservice Inspection (Lsi) Interval + (ML12307A074)
- 05000333/LER-2012-003, High Pressure Coolant Injection System Inoperable Due to Air in Flow Element Sensing Line + (ML12307A075)
- Press Release-III-12-040, NRC Asks Exelon to Address Questions About Dresdens Flooding Response Plan + (ML12307A082)
- ML12307A085 + (ML12307A085)