ML12306A502

From kanterella
Jump to navigation Jump to search
NRC Staff Transmittal of Limerick License Renewal Hearing File and Mandatory Disclosures, Hearing File Index - Update 4
ML12306A502
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/01/2012
From: Matthew Smith
NRC/OGC
To: William Froehlich, Kastenberg W, Kennedy M
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23691, 50-352-LR, 50-353-LR, ASLBP 12-916-04-LR-BD01
Download: ML12306A502 (6)


Text

November 1, 2012 Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. William E. Kastenberg Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of Exelon Generation Company, LLC (Limerick Generating Station, Units 1 and)

Docket Nos. 50-352-LR / 50-353-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order dated May 7, 2012, the staff of the Nuclear Regulatory Commission (Staff) is providing an index (Attachment 1) identifying documents subject to disclosure under the Boards Order and 10 C.F.R. §§ 2.1203 and 2.336.

On or about November 2, 2012, the materials listed in Attachment 1 may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD).1 The index contains the ADAMS accession number, document date, and the document title for the documents in the hearing file.

Pursuant to 10 C.F.R. § 2.336(c), attached is also the Affidavit of Leslie Perkins, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by October 31, 2012.

1 Recent Federal government closures delayed the Staffs normal process for publishing the hearing file materials in ADAMS. As a result, these materials will not be available until November 2, 2012, at the earliest. Staff counsel informed counsel for the intervenor and applicant in this proceeding of the delay, and neither objected.

Judge Froehlich November 1, 2012 Judge Kennedy Judge Kastenberg The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding.

Sincerely, Signed (electronically) by

_______________________________

Maxwell C. Smith Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1246 E-mail: Maxwell.smith@nrc.gov Date of signature: November 1, 2012

Enclosures:

Attachment 1: Hearing File Index - Update 4 Attachment 2: Affidavit of Leslie Perkins

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

EXELON GENERATION COMPANY, LLC ) 50-352-LR/ 50-353-LR

)

(Limerick Generating Station, Units 1 and 2) )

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter from Maxwell C. Smith to the Board, dated November, 2012; Attachment 1 - Limerick License Renewal Hearing File Index Initial, Update 4; -Affidavit of Leslie Perkins Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b); have been submitted through the E-filing System this 1st day of November, 2012:

/Signed (electronically) by/

Maxell C. Smith Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1246 E-mail: maxwell.smith@nrc.gov Date of signature: November 1, 2012

Attachment 1 - Limerick License Renewal Hearing File and Mandatory Disclosures Hearing File Index - Update 4 Accession No. Title Date 11/1/11 ML12255A291 Email from Ann, BHP to T. ONeil, PNNL LGS License Renewal -SHPO meeting.pdf 12:00AM 9/19/12 ML12270A142 2012/09/19 Limerick LR - ACRS SC Transcript in ADAMS 12:00AM 9/27/12 ML12271A509 2012/09/27 Limerick LR - Status of Cromby Generating Station, Units 1 and 2 12:00AM 10/3/12 ML12285A245 2012/10/03 Limerick LR - DRAFT Request for Additional Information re: Limerick Generating Station LRA 12:00AM 10/16/12 ML12298A065 2012/10/16 Limerick LR - DRAFT Request for Additional Information re: Limerick Generating Station LRA 12:00AM 10/17/12 ML12298A068 2012/10/17 Limerick LR - RE: Heads up 12:00AM November 1, 2012 Page 1 of 1

In the Matter of EXELON GENERATION COMPANY, LLC (Limerick Generating Station, Units 1 and 2)

Docket Nos. 50-352-LR and 50-353-LR Attachment 2 Affidavit of Leslie Perkins

November 1, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

Exelon Generation Company, LLC ) Docket Nos. 50-352-LR/ 50-353-LR

)

(Exelon Generation Station, Units 1 and 2) )

AFFIDAVIT OF LESLIE PERKINS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Leslie Perkins, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Limerick Generating Station, Units 1 and 2 license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) and 10 C.F.R. § 2.1203(b) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of October 24, 2012.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accordance with 10 CFR § 2.304 (d)

Leslie Perkins Project Manager Executed in Rockville, Maryland this 1st day of November, 2012