Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML053190429 + (ML053190429)
- ML053190457 + (ML053190457)
- ML053190460 + (ML053190460)
- ML053190461 + (ML053190461)
- ML053190462 + (ML053190462)
- ML053190466 + (ML053190466)
- Information Notice 2006-02, Use of Galvanized Supports and Cable Trays with Meggitt Si 2400 Stainless Steel Jacketed Electrical Cables + (ML053200005)
- Information Notice 2006-06, Loss of Offsite Power and Station Blackout Are More Probable During Summer Period + (ML053200013)
- ML053200023 + (ML053200023)
- Press Release-05-155, NRC Settles Discrimination Case; Georgia Co. Agrees to Strengthen Safety Conscious Work Environment + (ML053200025)
- ML053200029 + (ML053200029)
- 05000317/LER-2005-003, Overpower Condition Resulting from Non-Conservative Flow Correction Factors + (ML053200042)
- CPSES-200502282, Technical Specification Reports for Steam Generator Meeting C-3 Category and 15-day Tube Plugging and Repair + (ML053200044)
- BW050101, Core Operating Limits Report, Braidwood, Unit 1 Cycle 12, Revision 3 + (ML053200049)
- ML053200051 + (ML053200051)
- RS-05-160, Supplemental Response to NRC Generic Letter 2003-01, Control Room Habitability. + (ML053200079)
- ML053200079 + (ML053200079)
- ML053200083 + (ML053200083)
- RS-05-139, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1 + (ML053200089)
- RS-05-144, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1 + (ML053200094)
- RS-05-143, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 3 + (ML053200097)
- RS-05-138, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1 + (ML053200101)
- RS-05-140, County Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1 + (ML053200106)
- ML053200116 + (ML053200116)
- IR 05000266/2005012 + (ML053200120)
- ML053200129 + (ML053200129)
- ML053200137 + (ML053200137)
- PLA-5980, Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit Supplemental Information + (ML053200142)
- ML053200157 + (ML053200157)
- OI 4-2005-011, Waterford 3, Closure of Investigation + (ML053200165)
- ML053200169 + (ML053200169)
- GO2-05-179, Changes to Distribution List + (ML053200172)
- 05000456/LER-2005-002, Re Feedwater Isolation Valve 1FW039A Fails to Stroke in the Required Time Due to Failure of Valve Air Regulator to Maintain Set Pressure + (ML053200181)
- IA-05-062, Restani, Notice of Violation and Expiration of License + (ML053200189)
- LR-N05-0538, Core Operating Limits Report - Cycle 13, Revision 2 + (ML053200195)
- ML053200196 + (ML053200196)
- ML053200199 + (ML053200199)
- ML053200202 + (ML053200202)
- GO2-05-145, Response to Request for Additional Information Regarding the License Amendment Request for a One-time Extension to Technical Specification 3.7.1 + (ML053200204)
- LR-N05-0258, Attachment 12, EDO-33075, Class 1, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate + (ML053200206)
- ML053200212 + (ML053200212)
- IR 05000298/2005302 + (ML053200215)
- ML053200222 + (ML053200222)
- ML053200224 + (ML053200224)
- ML053200227 + (ML053200227)
- ML053200245 + (ML053200245)
- ML053200262 + (ML053200262)
- ML053200265 + (ML053200265)
- ML053200276 + (ML053200276)
- ML053200289 + (ML053200289)
- ML053200290 + (ML053200290)