Search results

Jump to navigation Jump to search
Results 1 – 20 of 18,399
Advanced search

Search in namespaces:

  • enlarged body of" applicable regulations"in design certification rules. Such a course is unnecessary to establish design requirements and holds the potential
    4 KB (396 words) - 18:31, 27 September 2022
  • of Requirements in the Design Control Document (DCD) i Backeround The DCD contains requirements specifying the standard design as well as a substantial
    24 KB (3,053 words) - 11:14, 7 July 2020
  • Crutchfield Design Control Document (DCD) Unidentified Changes (1) Letter, Dennis M. Crutchfield tojoseph Quirk, Certification of the Design Control Document
    6 KB (793 words) - 12:32, 27 September 2022
  • the Design Certification Rulemakings l Resnonses to Questions on Re3naining Issues and Points of Clarification l 1. Does the Design Control Document (DCD)
    32 KB (4,661 words) - 14:31, 7 July 2020
  • in Sections 9.5.1.1.2,9.5.1.2, and 9.5.1.3.8 of the System 80+ Design Control Document (DCD). Mineral insulted cable performs the same function as armored
    9 KB (1,072 words) - 11:36, 25 July 2023
  • discussions with the staff on matters related to completion of the Design Control Document (DCD) for the ABWR certification rulemakung, um staffput forward the
    5 KB (408 words) - 15:04, 20 April 2020
  • Supportine Design Certification The current configuration supporting design certification (DC) is Revision 2 of  ; the Design Control Document (DCD) transmitted
    4 KB (516 words) - 00:06, 25 April 2020
  • STN-52-001 ABWR Standard Plant Design ) APPLICATION FOR REVIEW OF "ABWR DESIGN CONTROL DOCUMENT, REVISION 4" FOR DESIGN CERTIFICATION Steven R. Specker
    6 KB (406 words) - 01:49, 12 December 2021
  • Wuslangton, DC 20004 2407 202 637-4142 fr 202 637 4051 July 12,1995 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
    4 KB (379 words) - 11:34, 15 April 2020
  • Amendment 35, Non-Proprietary Information to GE's ABWR SSAR and Certified Design Material, Revision 4, MFN No. 072-94 dated May 25, 1994 2. Letter, J.N.
    2 KB (262 words) - 00:10, 24 May 2020
  • November 2, 1994, please find enclosed a proposed revision to Section 3.8 of the DCD Introduction for tho Advanced Boiling Water Reactor. Sincerely, M C Steven
    2 KB (260 words) - 08:16, 27 April 2020
  • Docket No.52-001 Attn: Document Control Desk U.S. Nuclear Regulatory Cominission Washington, D.C. 20555 ) 1 NRC Fee Regulations for Design Certification liy
    3 KB (312 words) - 23:42, 30 May 2023
  • -- .J.s - . . - - _m- .-s.-_ -- - - - - - - - -- , . - - - O 9 OVERSIZE DOCUMENT PAGE PULLED SEE APERTURE CARDS NUMBER OF OVERSIZE PAGES FILMED ON APERTURE
    2 KB (315 words) - 00:42, 31 May 2023
  • Listing for ABWR Design Control Document (DCD) (1) J.N. Fox to R.W. Borchardt, Submittal of Revision 2 to the ABWR Design Control Document, MFN No. 004-95
    16 KB (1,758 words) - 12:40, 17 April 2020
  • the staffs comments on GE's proposed  ; . . introduction to the Design Control Document (DCD). One of the items agreed to  ; was not to incorporate ABWR SSAR
    18 KB (1,572 words) - 15:04, 20 April 2020
  • form of markups to pages of the AllWR Design Control l I Document (DCD), are ten proposed changes to the AllWR design description which result from information
    14 KB (1,675 words) - 08:25, 18 May 2020
  • osus July 25,1994 cc: Distribution of Controlled Copies of Licensing Topical Report NEDO-11209-04A Document Control Desk United States Nuclear Regulatory
    11 KB (1,399 words) - 12:29, 26 October 2020
  • driven by the first-of-a-kind nature of Part 50 design approvals and by the limited design scope, level of design detail and issue resolution on which they were
    13 KB (1,771 words) - 15:05, 20 April 2020
  • ABWR design was GE Nuclear Energy. 4 2. Definitions. J W As used in this part:  ; j i i (a) Design control document (DCD) means the master l document, which
    24 KB (3,212 words) - 03:35, 25 September 2022
  • Tier 2. This proposed process is contained in Section 3.8 of the Design Control Document (DCD) for the Advanced Boiling Water Reactor (ABWR) submitted by General
    23 KB (3,325 words) - 00:45, 25 April 2020
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)