Search results
Jump to navigation
Jump to search
- enlarged body of" applicable regulations"in design certification rules. Such a course is unnecessary to establish design requirements and holds the potential4 KB (396 words) - 18:31, 27 September 2022
- of Requirements in the Design Control Document (DCD) i Backeround The DCD contains requirements specifying the standard design as well as a substantial24 KB (3,053 words) - 11:14, 7 July 2020
- Crutchfield Design Control Document (DCD) Unidentified Changes (1) Letter, Dennis M. Crutchfield tojoseph Quirk, Certification of the Design Control Document6 KB (793 words) - 12:32, 27 September 2022
- the Design Certification Rulemakings l Resnonses to Questions on Re3naining Issues and Points of Clarification l 1. Does the Design Control Document (DCD)32 KB (4,661 words) - 14:31, 7 July 2020
- in Sections 9.5.1.1.2,9.5.1.2, and 9.5.1.3.8 of the System 80+ Design Control Document (DCD). Mineral insulted cable performs the same function as armored9 KB (1,072 words) - 11:36, 25 July 2023
- discussions with the staff on matters related to completion of the Design Control Document (DCD) for the ABWR certification rulemakung, um staffput forward the5 KB (408 words) - 15:04, 20 April 2020
- Supportine Design Certification The current configuration supporting design certification (DC) is Revision 2 of ; the Design Control Document (DCD) transmitted4 KB (516 words) - 00:06, 25 April 2020
- STN-52-001 ABWR Standard Plant Design ) APPLICATION FOR REVIEW OF "ABWR DESIGN CONTROL DOCUMENT, REVISION 4" FOR DESIGN CERTIFICATION Steven R. Specker6 KB (406 words) - 01:49, 12 December 2021
- Wuslangton, DC 20004 2407 202 637-4142 fr 202 637 4051 July 12,1995 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-00014 KB (379 words) - 11:34, 15 April 2020
- Amendment 35, Non-Proprietary Information to GE's ABWR SSAR and Certified Design Material, Revision 4, MFN No. 072-94 dated May 25, 1994 2. Letter, J.N.2 KB (262 words) - 00:10, 24 May 2020
- November 2, 1994, please find enclosed a proposed revision to Section 3.8 of the DCD Introduction for tho Advanced Boiling Water Reactor. Sincerely, M C Steven2 KB (260 words) - 08:16, 27 April 2020
- Docket No.52-001 Attn: Document Control Desk U.S. Nuclear Regulatory Cominission Washington, D.C. 20555 ) 1 NRC Fee Regulations for Design Certification liy3 KB (312 words) - 23:42, 30 May 2023
- -- .J.s - . . - - _m- .-s.-_ -- - - - - - - - -- , . - - - O 9 OVERSIZE DOCUMENT PAGE PULLED SEE APERTURE CARDS NUMBER OF OVERSIZE PAGES FILMED ON APERTURE2 KB (315 words) - 00:42, 31 May 2023
- Listing for ABWR Design Control Document (DCD) (1) J.N. Fox to R.W. Borchardt, Submittal of Revision 2 to the ABWR Design Control Document, MFN No. 004-9516 KB (1,758 words) - 12:40, 17 April 2020
- the staffs comments on GE's proposed ; . . introduction to the Design Control Document (DCD). One of the items agreed to ; was not to incorporate ABWR SSAR18 KB (1,572 words) - 15:04, 20 April 2020
- form of markups to pages of the AllWR Design Control l I Document (DCD), are ten proposed changes to the AllWR design description which result from information14 KB (1,675 words) - 08:25, 18 May 2020
- osus July 25,1994 cc: Distribution of Controlled Copies of Licensing Topical Report NEDO-11209-04A Document Control Desk United States Nuclear Regulatory11 KB (1,399 words) - 12:29, 26 October 2020
- driven by the first-of-a-kind nature of Part 50 design approvals and by the limited design scope, level of design detail and issue resolution on which they were13 KB (1,771 words) - 15:05, 20 April 2020
- ABWR design was GE Nuclear Energy. 4 2. Definitions. J W As used in this part: ; j i i (a) Design control document (DCD) means the master l document, which24 KB (3,212 words) - 03:35, 25 September 2022
- Tier 2. This proposed process is contained in Section 3.8 of the Design Control Document (DCD) for the Advanced Boiling Water Reactor (ABWR) submitted by General23 KB (3,325 words) - 00:45, 25 April 2020