Browse wiki
Jump to navigation
Jump to search
ML20238D074 +
TXX-7021, Advises That Submittal of Updated Response to Deficiency Rept CP-83-08 Revised to Be No Later than 880114 Instead of 871130.Delay Based on Review of Addl Info Provided by Subj Valve Vendor +, TXX-6992, Interim Deficiency Rept CP-87-28 Re Condensate Storage Tank Overpressurization.Initially Reported on 870629.Proposed Design Mod Under Evaluation.Schedule for Completion of Mod Will Be Provided in Suppl Rept by 880304 +, TXX-6911 +, TXX-6939, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/87-18 & 50-446/87-14.Corrective Actions:Package Flow Group Instituted Std Method for Designating Procedure Attachment on Package Inventory Cards +, TXX-7031, Supplemental Deficiency Rept CP-86-46 & Interim Deficiency Rept CP-86-76 Re Gould Battery Racks.Initially Reported on 861021.Deficient Battery Racks Will Be Disassembled,Reworked & Components Replaced as Necessary.Next Rept by 880308 +, TXX-7054, Final Deficiency Rept CP-87-118 Re Steam Generator Blowdown Isolation.Initially Reported on 871023.Use of non-nuclear Safety Detection & Control to Isolate Steam Generator Blowdown Lines Not Deficiency in Design or Const +, TXX-7082, Final Deficiency Rept CP-87-87 Re Chemical Vol & Control Sys Relief Valve Piping.Initially Reported 870903.Valve Will Be Relocated in Order to Comply W/Asme Boiler & Pressure Valve Code Requirements +, TXX-7063, Final Deficiency Rept CP-87-33 Re Auxiliary Feedwater Pump Motor Fans.Initially Reported on 870708.Vendor Evaluation Found No Adverse Effect from Fan Installation in Reverse Direction.Condition Not Reportable Per 10CFR50.55(e) +, TXX-7081, Interim Deficiency Rept CP-87-29 Re Component Cooling Water Isolation Following Reactor Coolant Pump Rupture.Initially Reported on 870629.Non-Class 1E Temp & Flow Instrumentation Replaced W/Class 1E Equipment.Next Rept Due by 880217 +, TXX-7056, Final Deficiency Rept CP-87-73 Re Unsound Concrete Mortar at Const Joints.Initially Reported on 870824.Nonconformance Repts C-86-200154 & C-85-101580 Dispositioned to Replace Grout & Rework Affected Areas at Listed Locations +, TXX-7046, Interim Deficiency Rept CP-87-55 Re Containment Spray Pump Recirculation Piping.Initially Reported on 870805.Piping Wil Be Replaced W/Asme III Class 2 Pipes W/Seismic Category I Supports.Next Rept Will Be Submitted by 880311 +, TXX-7045, Final Deficiency Rept CP-87-24 Re Approval to Allow Bending of Nelson Stud Anchors.Initially Reported on 870629.Bending Calculations Indicate That Stresses Would Not Exceed Unallowable Limits.Issue Not Reportable,Per 10CFR50.55(e) +, TXX-7005, Forwards Comanche Peak Response Team Results Repts,Including Issue Specific Action Plan V.B, Improper Shortening of Anchor Bolts... & Discipline Specific Action Plan Viii, Civil/Structural - Train a & B Conduit & Supports +, TXX-7032, Supplemental Deficiency Rept CP-87-23 Re Class 1E Conduit Unions.Initially Reported on 870626.Final Rept Rescheduled for 880219 Due to Time Constraints +, TXX-7004, Forwards Response to NRC 871023 Request for Addl Info Re Groundwater Wells at Facility,Per 871025 Telcon.W/Two Oversize Maps +, TXX-7013, Notifies That Design Change and Authorization 31,277,Rev 2 Will Be Incorporated Into Drawing 2323-E1-0156 by 880224,for Full Compliance to Notice of Violation,Item E from Insp Repts 50-445/86-07 & 50-446/86-05 +, TXX-6955, Interim Deficiency Rept CP-87-100 Re Containment Piping Penetrations Which Lack Overpressure Protection.Initially Reported on 870910.Thermal Relief Valves Will Be Installed in Affected Piping.Next Rept Will Be Submitted by 880301 +, TXX-7015, Updates 871002 Response to Violations Noted in Insp Rept 50-445/87-11 & 50-446/87-09.Completion Date for Removal of Unauthorized Splices & Wire Nuts Changed from 871130 to 880129 +, TXX-7014, Informs That Evaluation & Conversion of Discrepancy Forms, Generated Per Procedure PP-051 as Stated in 870911 Response to Violation 446/8622-V-07 Noted in Insp Repts 50-445/86-26 & 50-446/86-22,will Not Be Completed Until 871230 +, TXX-6979, Forwards Notification of 871217-19 Meetings W/Case to Discuss Corrective Action Program,Including Piping & Pipe Supports,Cable Tray Hangers,Conduit & Conduit Supports +, TXX-6981, Final Deficiency Rept CP-87-27 Re Galvanic Corrosion in Svc Water Sys.Initially Reported on 870629.Resultant Corrosion Will Advance to Saturation Level,Where Further Corrosion Will Be at Very Slow Rate +, TXX-6970, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports.Initially Reported on 871105.Rept Clarifies TXX-6928.Next Rept Will Be Submitted No Later than 880301 +, TXX-6937, Responds to NRC Re Violations & Deviation Noted in Insp Repts 50-445/87-16 & 50-446/87-13.Corrective Actions:Nonconformance Rept 81-A01243 Written to Document Missing Cotter Pins +, TXX-6961, Submits Clarifications of Plant Program Descriptions. Portions of Corrective Action Program That Do Not Have Erection Specs Have Same Final Acceptance Attributes Developed from Design Basis Documents +, TXX-6997, Advises That Completion of Review of Attributes for Const Work Cateory Re Notice of Deviation Item B (Insp Rept 50-445/86-03) Revised to 871231 +, TXX-6989, Final Deficiency Rept CP-87-63 Re Pipe Weld Insps.Initially Reported on 870824.Insp Results Have Established Reasonable Level of Assurance That Existing Welds Will Perform Function W/O Mod.Deficiency Not Reportable,Per 10CFR50.55(e) +, TXX-6964, Responds to NRC Requesting Info Re Base Matl Defects Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Util Preparing Verification Plan That Will Be Used to Reverify Welds from Representative Sample of 60 Pipe Supports +, TXX-6993, Suppls 870918 Response to Violations Noted in Insp Repts 50-445/86-22 & 50-446/86-20.Date for Disposition of Requested Addl Nonconformance Documents & Delineating Addl Corrective Action Extended to 880215 +, TXX-6909, Advises That Insp of Coated Weld Samples Completed Per Procedure Consistent W/Guidance in Sser 12 (NUREG-0797).Util Prepared to Support NRC Office of Special Projects Review & Assessment of Insp Results +, TXX-6944, Supplemental Deficiency Rept CP-87-03 Re Installation of safety-related 6.9 Kv Switchgear on Structural Embedments Which Were Not Level.Initially Reported on 870316.Testing of Switchgear Rescheduled for Completion by 880301 +...
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 +, ML20238D074 + and ML20238D074 +
December 30, 1987 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
10:44:14, 2 December 2024 +
32 +
CP-87-22 +, CP-87-63 +, CP-83-08 +, CP-85-35 +, CP-85-36 +, CP-87-23 +, CP-87-58 +, CP-87-33 +, CP-87-108 +, CP-87-100 +, CP-87-50 +, CP-87-18 +, CP-87-29 +, CP-87-55 +, CP-87-03 +, CP-87-28 +, CP-87-52 +, CP-85-13 +, CP-86-53 +, CP-87-27 +, CP-82-09 +, CP-86-76 +, CP-86-46 +, CP-87-01 +, CP-87-107 +, CP-87-86 +, CP-87-42 +, CP-87-24 +, CP-87-ll8 +, CP-87-73 +...
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request +
December 30, 1987 +
TXX-7021, Advises That Submittal of Updated Response to Deficiency Rept CP-83-08 Revised to Be No Later than 880114 Instead of 871130.Delay Based on Review of Addl Info Provided by Subj Valve Vendor +, TXX-6992, Interim Deficiency Rept CP-87-28 Re Condensate Storage Tank Overpressurization.Initially Reported on 870629.Proposed Design Mod Under Evaluation.Schedule for Completion of Mod Will Be Provided in Suppl Rept by 880304 +, TXX-6911 +, TXX-6939, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/87-18 & 50-446/87-14.Corrective Actions:Package Flow Group Instituted Std Method for Designating Procedure Attachment on Package Inventory Cards +, TXX-7031, Supplemental Deficiency Rept CP-86-46 & Interim Deficiency Rept CP-86-76 Re Gould Battery Racks.Initially Reported on 861021.Deficient Battery Racks Will Be Disassembled,Reworked & Components Replaced as Necessary.Next Rept by 880308 +, TXX-7054, Final Deficiency Rept CP-87-118 Re Steam Generator Blowdown Isolation.Initially Reported on 871023.Use of non-nuclear Safety Detection & Control to Isolate Steam Generator Blowdown Lines Not Deficiency in Design or Const +, TXX-7082, Final Deficiency Rept CP-87-87 Re Chemical Vol & Control Sys Relief Valve Piping.Initially Reported 870903.Valve Will Be Relocated in Order to Comply W/Asme Boiler & Pressure Valve Code Requirements +, TXX-7063, Final Deficiency Rept CP-87-33 Re Auxiliary Feedwater Pump Motor Fans.Initially Reported on 870708.Vendor Evaluation Found No Adverse Effect from Fan Installation in Reverse Direction.Condition Not Reportable Per 10CFR50.55(e) +, TXX-7081, Interim Deficiency Rept CP-87-29 Re Component Cooling Water Isolation Following Reactor Coolant Pump Rupture.Initially Reported on 870629.Non-Class 1E Temp & Flow Instrumentation Replaced W/Class 1E Equipment.Next Rept Due by 880217 +, TXX-7056, Final Deficiency Rept CP-87-73 Re Unsound Concrete Mortar at Const Joints.Initially Reported on 870824.Nonconformance Repts C-86-200154 & C-85-101580 Dispositioned to Replace Grout & Rework Affected Areas at Listed Locations +, TXX-7046, Interim Deficiency Rept CP-87-55 Re Containment Spray Pump Recirculation Piping.Initially Reported on 870805.Piping Wil Be Replaced W/Asme III Class 2 Pipes W/Seismic Category I Supports.Next Rept Will Be Submitted by 880311 +, TXX-7045, Final Deficiency Rept CP-87-24 Re Approval to Allow Bending of Nelson Stud Anchors.Initially Reported on 870629.Bending Calculations Indicate That Stresses Would Not Exceed Unallowable Limits.Issue Not Reportable,Per 10CFR50.55(e) +, TXX-7005, Forwards Comanche Peak Response Team Results Repts,Including Issue Specific Action Plan V.B, Improper Shortening of Anchor Bolts... & Discipline Specific Action Plan Viii, Civil/Structural - Train a & B Conduit & Supports +, TXX-7032, Supplemental Deficiency Rept CP-87-23 Re Class 1E Conduit Unions.Initially Reported on 870626.Final Rept Rescheduled for 880219 Due to Time Constraints +, TXX-7004, Forwards Response to NRC 871023 Request for Addl Info Re Groundwater Wells at Facility,Per 871025 Telcon.W/Two Oversize Maps +, TXX-7013, Notifies That Design Change and Authorization 31,277,Rev 2 Will Be Incorporated Into Drawing 2323-E1-0156 by 880224,for Full Compliance to Notice of Violation,Item E from Insp Repts 50-445/86-07 & 50-446/86-05 +, TXX-6955, Interim Deficiency Rept CP-87-100 Re Containment Piping Penetrations Which Lack Overpressure Protection.Initially Reported on 870910.Thermal Relief Valves Will Be Installed in Affected Piping.Next Rept Will Be Submitted by 880301 +, TXX-7015, Updates 871002 Response to Violations Noted in Insp Rept 50-445/87-11 & 50-446/87-09.Completion Date for Removal of Unauthorized Splices & Wire Nuts Changed from 871130 to 880129 +, TXX-7014, Informs That Evaluation & Conversion of Discrepancy Forms, Generated Per Procedure PP-051 as Stated in 870911 Response to Violation 446/8622-V-07 Noted in Insp Repts 50-445/86-26 & 50-446/86-22,will Not Be Completed Until 871230 +, TXX-6979, Forwards Notification of 871217-19 Meetings W/Case to Discuss Corrective Action Program,Including Piping & Pipe Supports,Cable Tray Hangers,Conduit & Conduit Supports +, TXX-6981, Final Deficiency Rept CP-87-27 Re Galvanic Corrosion in Svc Water Sys.Initially Reported on 870629.Resultant Corrosion Will Advance to Saturation Level,Where Further Corrosion Will Be at Very Slow Rate +, TXX-6970, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports.Initially Reported on 871105.Rept Clarifies TXX-6928.Next Rept Will Be Submitted No Later than 880301 +, TXX-6937, Responds to NRC Re Violations & Deviation Noted in Insp Repts 50-445/87-16 & 50-446/87-13.Corrective Actions:Nonconformance Rept 81-A01243 Written to Document Missing Cotter Pins +, TXX-6961, Submits Clarifications of Plant Program Descriptions. Portions of Corrective Action Program That Do Not Have Erection Specs Have Same Final Acceptance Attributes Developed from Design Basis Documents +, TXX-6997, Advises That Completion of Review of Attributes for Const Work Cateory Re Notice of Deviation Item B (Insp Rept 50-445/86-03) Revised to 871231 +, TXX-6989, Final Deficiency Rept CP-87-63 Re Pipe Weld Insps.Initially Reported on 870824.Insp Results Have Established Reasonable Level of Assurance That Existing Welds Will Perform Function W/O Mod.Deficiency Not Reportable,Per 10CFR50.55(e) +, TXX-6964, Responds to NRC Requesting Info Re Base Matl Defects Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Util Preparing Verification Plan That Will Be Used to Reverify Welds from Representative Sample of 60 Pipe Supports +, TXX-6993, Suppls 870918 Response to Violations Noted in Insp Repts 50-445/86-22 & 50-446/86-20.Date for Disposition of Requested Addl Nonconformance Documents & Delineating Addl Corrective Action Extended to 880215 +, TXX-6909, Advises That Insp of Coated Weld Samples Completed Per Procedure Consistent W/Guidance in Sser 12 (NUREG-0797).Util Prepared to Support NRC Office of Special Projects Review & Assessment of Insp Results +, TXX-6944, Supplemental Deficiency Rept CP-87-03 Re Installation of safety-related 6.9 Kv Switchgear on Structural Embedments Which Were Not Level.Initially Reported on 870316.Testing of Switchgear Rescheduled for Completion by 880301 +...
Applicant Ninth Progress Rept.* Progress Rept Covers Period of 871026-1225 Submitted Per Board 860606 Memorandum & Order (Progress Rept & Notice of Available Documents). Next Rept Will Be Issued on 880229.W/Certificate of Svc +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.