Browse wiki
Jump to navigation
Jump to search
ML20215D795 +
TXX-3358, Final Deficiency Rept Re Seismic Instrument Tubing Support, Initially Reported 810604.Engineering Documents Will Be Evaluated & Revised.Completed Installations Will Be Surveyed.Noncompliant Conditions Will Be Reworked +, TXX-3329, Deficiency Rept Re Defective Bahnson Svc Co Heating, Ventilation & Air Conditioning Supports,Initially Reported on 810324.Bahnson Procedures Have Been Revised to Include Documentation of Concrete Anchor Bolt Size +, TXX-3138, Final Deficiency Rept Re Violation of Piping Min Wall Thickness,Initially Reported on 790522.Revisions to Fabrication & Documents Completed.Final Stress Analyses Are Targeted for Completion Prior to Hot Functional Testing +, TXX-3217, Deficiency Rept Re Roto-lock Insert Locking Tab Installed at Facility.Problem Should Not Be Classified as Potentially Reportable Deficiency.Supporting Documentation Available at Plant Site +, TXX-2952, Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review +, TXX-3131, Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501 +, TXX-3124, Forwards Deficiency Rept Re Concrete Honeycomb Condition Encountered in Steam Generator Compartment Walls of Unit 2 Reactor Containment Bldg +, TXX-3114, Forwards Rept of Actions Taken to Correct Deficiencies in Mfg of Discs for Svc Water Control Valves.Supporting Documentation Is Available at Site for Inspector Review +, TXX-3247, Submits Suppl to Util 800808 Rept Re Architectural Topping Placed on Floor Slabs.Project Completion Anticipated 810801 +, TXX-3219, Deficiency Rept Re Thread Engagement of Sway Struts. Condition Not Reportable Under 10CFR50.55e,as Reported on 800919 +, TXX-3398, Final Deficiency Rept Re pull-out Performance of Hilti Kwik-Bolt Anchors,Initially Reported 801217.Condition Is Not Significant Deficiency & Is Not Reportable Per 10CFR50.55(e) +, TXX-3357, Final Deficiency Rept Re Use of Yellow 77 Cable Lubricant, Initially Reported on 810110.Matter Considered Not Reportable Under 10CFR50.55(e) +, TXX-3356, Final Deficiency Rept Re Specified Matl for Pipe Spool Flanges,Initially Reported on 810604.Matter Considered Not Reportable Under 10CFR50.55(e) +, TXX-3349, Interim Deficiency Rept Re heating/ventilation/air- Conditioning Cooling Sys,Initially Reported on 810330.Cause Attributed to Design Evolution.Corrective Actions to Be Completed as Described in 810424 Interim Rept +, TXX-4363, Deficiency Rept SDAR-158 Re Itt Barton Differential Pressure Switches Experiencing Setpoint Shifts in Excess of Specs When Operated at Temps Above 225 F.Condition Not Reportable Per 10CFR50.55(e) +, TXX-4799, Final Part 21 & Deficiency Rept CP-86-26 Re Gibbs & Hill Safety Classification of Containment Spray Sys Recirculation Lines.Initially Reported on 860414.Classification Conforms to Reg Guide & Fsar.Item Not Reportable Per 10CFR50.55(e) +, TXX-6360, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Deficiency Under Evaluation. Next Rept Will Be Submitted by 870528 +, TXX-4409, Interim Significant Deficiency Rept SDAR-152 Re Ventilation Exhaust Dampers Failing to Close Possibly Causing Radioactive Releases.Ventilation Sys Will Be Modified to Provide Adequate Heat Removal +, TXX-6316 +, TXX-6341, Final Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.All Jack Shafts in 6.9 Kv Switchgear Scheduled to Be Replaced by 871121 +, TXX-2926 +, TXX-4894, Interim Deficiency Rept CP-86-22 Re Incapacity of American Air Filter Fan Coolers to Handle Heat Load in Several Safeguards Area Rooms.Initially Reported on 860402. Evaluation Continuing.Next Rept by 860912 +, TXX-6092, Final Deficiency Rept CP-86-61 Re Restraints for Polar Crane Rail Found Broken.Initially Reported on 860904.Issue Not Reportable Per 10CFR50.55(e) +, TXX-3589, Final Deficiency Rept Re Embedded Rotafoam & Plywood in Auxiliary Bldg Concrete Floor Slabs.Initially Reported on 821020.Deficiency Determined Not Reportable Under 10CFR50.55(e) +, TXX-3692 +, TXX-1264, Responds to NRC Re Violations Noted in Insp Repts 50-445/75-05 & 50-446/75-05.Corrective Actions:Reactor Cavity Areas Containing Most Damage Removed as Part of Safeguards Bldg Excavation +, TXX-6456, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr for Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Next Rept Will Be Submitted by 870721 +, TXX-3415, Modified Deficiency Rept Re Diesel Generator Pipe Support Alignment,Initially Reported 800926.Manufacturer Did Not Comply W/Asme Stress Allowables.Calculations & Weld Insp Procedures Revised +, TXX-2609, Final Deficiency Rept Re Fuel Bldg Crane Girder Design. Design Data Properly Interpreted & Utilized +, TXX-4012, Deficiency Rept Re Welded Attachments to Piping After Hydrostatic Testing.Initially Reported on 830623. Investigation Concluded Matter Not Reportable Per 10CFR50.55(e) +...
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 +, ML20215D795 + and ML20215D795 +
IEEE 420-1973 + and IEEE 420 +
June 10, 1987 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
03:48:56, 4 December 2024 +
61 +
ES-100 +, ES-19 +, IAP +, CP-86-35 +, CP-CPM +, CP-86-04 +, CP-85-39 +, CP-85-19 +, CP-85-34 +, CP-85-50 +, CP-86-83 +, CP-86-10 +, CP-86-52 +, CP-86-68 +, CP-86-37 +, CP-85-54 +, CP-86-53 +, CP-86-38 +, CP-86-40 +, CP-87-05 +, CP-87-07 +, CP-86-69 +, CP-86-22 +, CP-86-59 +, CP-87-08 +, CP-86-12 +, CP-86-78 +, CP-87-06 +, CP-86-64 +, CP-86-74 +...
Request +
June 10, 1987 +
TXX-3358, Final Deficiency Rept Re Seismic Instrument Tubing Support, Initially Reported 810604.Engineering Documents Will Be Evaluated & Revised.Completed Installations Will Be Surveyed.Noncompliant Conditions Will Be Reworked +, TXX-3329, Deficiency Rept Re Defective Bahnson Svc Co Heating, Ventilation & Air Conditioning Supports,Initially Reported on 810324.Bahnson Procedures Have Been Revised to Include Documentation of Concrete Anchor Bolt Size +, TXX-3138, Final Deficiency Rept Re Violation of Piping Min Wall Thickness,Initially Reported on 790522.Revisions to Fabrication & Documents Completed.Final Stress Analyses Are Targeted for Completion Prior to Hot Functional Testing +, TXX-3217, Deficiency Rept Re Roto-lock Insert Locking Tab Installed at Facility.Problem Should Not Be Classified as Potentially Reportable Deficiency.Supporting Documentation Available at Plant Site +, TXX-2952, Notification of Completion of Investigation on Expansion Joint in Decontamination Room.Concludes Matter Is Not Reportable Under 10CFR50.55(e).Supporting Records Available on Site for Inspector Review +, TXX-3131, Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501 +, TXX-3124, Forwards Deficiency Rept Re Concrete Honeycomb Condition Encountered in Steam Generator Compartment Walls of Unit 2 Reactor Containment Bldg +, TXX-3114, Forwards Rept of Actions Taken to Correct Deficiencies in Mfg of Discs for Svc Water Control Valves.Supporting Documentation Is Available at Site for Inspector Review +, TXX-3247, Submits Suppl to Util 800808 Rept Re Architectural Topping Placed on Floor Slabs.Project Completion Anticipated 810801 +, TXX-3219, Deficiency Rept Re Thread Engagement of Sway Struts. Condition Not Reportable Under 10CFR50.55e,as Reported on 800919 +, TXX-3398, Final Deficiency Rept Re pull-out Performance of Hilti Kwik-Bolt Anchors,Initially Reported 801217.Condition Is Not Significant Deficiency & Is Not Reportable Per 10CFR50.55(e) +, TXX-3357, Final Deficiency Rept Re Use of Yellow 77 Cable Lubricant, Initially Reported on 810110.Matter Considered Not Reportable Under 10CFR50.55(e) +, TXX-3356, Final Deficiency Rept Re Specified Matl for Pipe Spool Flanges,Initially Reported on 810604.Matter Considered Not Reportable Under 10CFR50.55(e) +, TXX-3349, Interim Deficiency Rept Re heating/ventilation/air- Conditioning Cooling Sys,Initially Reported on 810330.Cause Attributed to Design Evolution.Corrective Actions to Be Completed as Described in 810424 Interim Rept +, TXX-4363, Deficiency Rept SDAR-158 Re Itt Barton Differential Pressure Switches Experiencing Setpoint Shifts in Excess of Specs When Operated at Temps Above 225 F.Condition Not Reportable Per 10CFR50.55(e) +, TXX-4799, Final Part 21 & Deficiency Rept CP-86-26 Re Gibbs & Hill Safety Classification of Containment Spray Sys Recirculation Lines.Initially Reported on 860414.Classification Conforms to Reg Guide & Fsar.Item Not Reportable Per 10CFR50.55(e) +, TXX-6360, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Deficiency Under Evaluation. Next Rept Will Be Submitted by 870528 +, TXX-4409, Interim Significant Deficiency Rept SDAR-152 Re Ventilation Exhaust Dampers Failing to Close Possibly Causing Radioactive Releases.Ventilation Sys Will Be Modified to Provide Adequate Heat Removal +, TXX-6316 +, TXX-6341, Final Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.All Jack Shafts in 6.9 Kv Switchgear Scheduled to Be Replaced by 871121 +, TXX-2926 +, TXX-4894, Interim Deficiency Rept CP-86-22 Re Incapacity of American Air Filter Fan Coolers to Handle Heat Load in Several Safeguards Area Rooms.Initially Reported on 860402. Evaluation Continuing.Next Rept by 860912 +, TXX-6092, Final Deficiency Rept CP-86-61 Re Restraints for Polar Crane Rail Found Broken.Initially Reported on 860904.Issue Not Reportable Per 10CFR50.55(e) +, TXX-3589, Final Deficiency Rept Re Embedded Rotafoam & Plywood in Auxiliary Bldg Concrete Floor Slabs.Initially Reported on 821020.Deficiency Determined Not Reportable Under 10CFR50.55(e) +, TXX-3692 +, TXX-1264, Responds to NRC Re Violations Noted in Insp Repts 50-445/75-05 & 50-446/75-05.Corrective Actions:Reactor Cavity Areas Containing Most Damage Removed as Part of Safeguards Bldg Excavation +, TXX-6456, Interim Deficiency Rept CP-87-08 Re Accuracy Tolerance of Calibr for Dead Weight Tester Used as Std in Calibr Pressure Instrumentation.Initially Reported on 870420.Next Rept Will Be Submitted by 870721 +, TXX-3415, Modified Deficiency Rept Re Diesel Generator Pipe Support Alignment,Initially Reported 800926.Manufacturer Did Not Comply W/Asme Stress Allowables.Calculations & Weld Insp Procedures Revised +, TXX-2609, Final Deficiency Rept Re Fuel Bldg Crane Girder Design. Design Data Properly Interpreted & Utilized +, TXX-4012, Deficiency Rept Re Welded Attachments to Piping After Hydrostatic Testing.Initially Reported on 830623. Investigation Concluded Matter Not Reportable Per 10CFR50.55(e) +...
Potential 10CFR50.55(e) Items.* Forwards Potential Significant Deficiency Analysis Repts Received Since ASLB Provided W/Subj Items on 870430 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.