Browse wiki

Jump to navigation Jump to search
ML20210S538  +
TXX-4904, Forwards Addl Info Re Generic Ltr 85-12, Automatic Trip of Reactor Coolant Pumps, Per 860502 Request.Info Concerns Reactor Coolant Pump Trip Criteria,Potential Problems & Operator Training & Procedures +, TXX-4992, Responds to NRC Requesting Addl Info Re Violations Noted in Insp Repts 50-445/86-16 & 50-446/85-13. Corrective Actions:Addl Calculations Performed to Show Design Change Acceptable & Engineering Personnel Counseled +, TXX-5025, Final Deficiency Rept CP-86-56 Re Fastening of Standby Diesel Generator Engine Connecting Rod Assembly Identified by Tdi.Initially Reported on 860814.Issue Not Reportable Per 10CFR50.55(e) +, TXX-5027, Supplemental Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units. Initially Reported on 860521.Gibbs & Hill Performing Review of Vendor Specs.Next Rept Will Be Submitted by 861217 +, TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 +, TXX-5018, Forwards Rev 1 to Results Rept I.d.3, Craft Personnel Training +, TXX-5003, Amends 860826 Request for NRC Approval to Use ASME Code Case N-253-4,changing Code Case to N-253-2 +, TXX-4973, Forwards Rev 0 to Comanche Peak Response Team Results Rept:Isap III.a.4,Traceability of Test Equipment. Repts Will Be Issued on Periodic Basis +, TXX-4958, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Encl Lists Support Mods Initiated to Date.Next Rept by 860926 +, TXX-4952, Forwards Action Plan for Isap III.a.5, Preoperational Test Review & Approval of Results, for Inclusion in Facility Response Team Program Plan & as Response to ASLB 841221 Memorandum +, TXX-4966, Final Deficiency Rept CP-86-34 Re Fire Stop Installations Exceeding Design Temp of Unexposed Surface During ASTM E-119 Fire Test.Initially Reported on 860501.Issue Not Reportable Under 10CFR50.55(e) +, TXX-4975, Part 21 & Deficiency Rept CP-86-31 Re Failure of Rubber Facing on Diesel Generator Lube Oil Sump Tank Foot Valves. Initially Reported on 860418.Evaluation Continuing.New Liners Being Procured.Next Rept Will Be Submitted by 861126 +, TXX-4980, Forwards Response to Enforcement Action 86-009,App B,Item I.B.4.a & Revised Pages A32,A43,B2,B9,B12,B18, & B23, Containing Minor Clarifications & Editorial Corrections. All Bunker Ramo EPA Modules Will Be Replaced by 861231 +, TXX-4964, Final Deficiency Rept CP-86-25 Re Lack of Full Breaker/Fuse Coordination for Several safety-related Loads.Initially Reported on 860410.Condition Not Reportable Per 10CFR50.55(e) +, TXX-4965, Final Deficiency Rept CP-86-30 Re Burnt Wire on Capacitor Bank in Elgar Corp Power Sys Inverter & Burnt Tywraps. Initially Reported on 860418.Burnt Wire Attributed to Bad Crimping.Issue Not Reportable Per 10CFR50.55(e) +, TXX-5024, Forwards Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Procedure STA-626 Re Control of Chemical Substances & Matls Issued on 860901 & Procedure STA-606 Re Work Orders Revised +, TXX-4996, Final Deficiency Rept CP-86-47 Re Qualification of Bisco Fire Barrier Seal Design.Initially Reported on 860616.Two Blockout Fire Stops Installed in larger-than-tested Configuration.Situation Not Reportable Per 10CFR50.55(e) +, TXX-5006, Forwards Revised FSAR Pages Scheduled for Future FSAR Amend. Changes Resulted from Requalification of Class 2 & 3 Piping & Class 1,2 & 3 Pipe Supports +, TXX-4993 +, TXX-4953, Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs +, TXX-5001, Forwards Responses,W/Exceptions Noted,To Concerns & Requests Listed in Ltrs 84056.088,.090,.092,.093 & .094 Re Open Items in Phase IV Rept.Requests Cygna Proceed to Completion & Issuance of Phase IV Rept,Per Spence .W/O Encls +, TXX-4943, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860411. Completion of Next Rept Expected by 860926 +, TXX-4944, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Next Rept Expected by 860926 +, TXX-4991, Informs That Allegation Re Trash in Containment Wall Could Not Be Resolved Expeditiously.Nonconformance Rept NCR-C-86-103255 Generated for Tracking Purposes.Followup Submittal Will Be Provided by 861231 +, TXX-5004 +, TXX-5035 +, TXX 4922 +  and TXX-4987, Forwards Evaluation & Resolution of Generic Technical Issues for Cable Tray Hangers, Prepared by Ebasco Svcs,Inc & Related Repts & Procedures +
05000445  +, 05000446  +  and 00445  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
September 25, 1986  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
06:17:26, 6 December 2024  +
13  +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request  +
September 25, 1986  +
TXX-4904, Forwards Addl Info Re Generic Ltr 85-12, Automatic Trip of Reactor Coolant Pumps, Per 860502 Request.Info Concerns Reactor Coolant Pump Trip Criteria,Potential Problems & Operator Training & Procedures +, TXX-4992, Responds to NRC Requesting Addl Info Re Violations Noted in Insp Repts 50-445/86-16 & 50-446/85-13. Corrective Actions:Addl Calculations Performed to Show Design Change Acceptable & Engineering Personnel Counseled +, TXX-5025, Final Deficiency Rept CP-86-56 Re Fastening of Standby Diesel Generator Engine Connecting Rod Assembly Identified by Tdi.Initially Reported on 860814.Issue Not Reportable Per 10CFR50.55(e) +, TXX-5027, Supplemental Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units. Initially Reported on 860521.Gibbs & Hill Performing Review of Vendor Specs.Next Rept Will Be Submitted by 861217 +, TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 +, TXX-5018, Forwards Rev 1 to Results Rept I.d.3, Craft Personnel Training +, TXX-5003, Amends 860826 Request for NRC Approval to Use ASME Code Case N-253-4,changing Code Case to N-253-2 +, TXX-4973, Forwards Rev 0 to Comanche Peak Response Team Results Rept:Isap III.a.4,Traceability of Test Equipment. Repts Will Be Issued on Periodic Basis +, TXX-4958, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Encl Lists Support Mods Initiated to Date.Next Rept by 860926 +, TXX-4952, Forwards Action Plan for Isap III.a.5, Preoperational Test Review & Approval of Results, for Inclusion in Facility Response Team Program Plan & as Response to ASLB 841221 Memorandum +, TXX-4966, Final Deficiency Rept CP-86-34 Re Fire Stop Installations Exceeding Design Temp of Unexposed Surface During ASTM E-119 Fire Test.Initially Reported on 860501.Issue Not Reportable Under 10CFR50.55(e) +, TXX-4975, Part 21 & Deficiency Rept CP-86-31 Re Failure of Rubber Facing on Diesel Generator Lube Oil Sump Tank Foot Valves. Initially Reported on 860418.Evaluation Continuing.New Liners Being Procured.Next Rept Will Be Submitted by 861126 +, TXX-4980, Forwards Response to Enforcement Action 86-009,App B,Item I.B.4.a & Revised Pages A32,A43,B2,B9,B12,B18, & B23, Containing Minor Clarifications & Editorial Corrections. All Bunker Ramo EPA Modules Will Be Replaced by 861231 +, TXX-4964, Final Deficiency Rept CP-86-25 Re Lack of Full Breaker/Fuse Coordination for Several safety-related Loads.Initially Reported on 860410.Condition Not Reportable Per 10CFR50.55(e) +, TXX-4965, Final Deficiency Rept CP-86-30 Re Burnt Wire on Capacitor Bank in Elgar Corp Power Sys Inverter & Burnt Tywraps. Initially Reported on 860418.Burnt Wire Attributed to Bad Crimping.Issue Not Reportable Per 10CFR50.55(e) +, TXX-5024, Forwards Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Procedure STA-626 Re Control of Chemical Substances & Matls Issued on 860901 & Procedure STA-606 Re Work Orders Revised +, TXX-4996, Final Deficiency Rept CP-86-47 Re Qualification of Bisco Fire Barrier Seal Design.Initially Reported on 860616.Two Blockout Fire Stops Installed in larger-than-tested Configuration.Situation Not Reportable Per 10CFR50.55(e) +, TXX-5006, Forwards Revised FSAR Pages Scheduled for Future FSAR Amend. Changes Resulted from Requalification of Class 2 & 3 Piping & Class 1,2 & 3 Pipe Supports +, TXX-4993 +, TXX-4953, Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs +, TXX-5001, Forwards Responses,W/Exceptions Noted,To Concerns & Requests Listed in Ltrs 84056.088,.090,.092,.093 & .094 Re Open Items in Phase IV Rept.Requests Cygna Proceed to Completion & Issuance of Phase IV Rept,Per Spence .W/O Encls +, TXX-4943, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860411. Completion of Next Rept Expected by 860926 +, TXX-4944, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Next Rept Expected by 860926 +, TXX-4991, Informs That Allegation Re Trash in Containment Wall Could Not Be Resolved Expeditiously.Nonconformance Rept NCR-C-86-103255 Generated for Tracking Purposes.Followup Submittal Will Be Provided by 861231 +, TXX-5004 +, TXX-5035 +, TXX 4922 +  and TXX-4987, Forwards Evaluation & Resolution of Generic Technical Issues for Cable Tray Hangers, Prepared by Ebasco Svcs,Inc & Related Repts & Procedures +
Annotated Bibliographies, Covering 860726-0925  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.