Browse wiki

Jump to navigation Jump to search
100  +  and 97  +
On March 3, 2019, during overhaul activitiOn March 3, 2019, during overhaul activities of the medium voltage power (Magne-blast) circuit breakers, three General Electric Hitachi (GEH) Stationary Primary Contact Fingers Q0114C5382P002 were identified as having contact surfaces with a finish that was rough and unlike the typically smooth finish provided on electrical contact surfaces. These Stationary Primary Contact Fingers are the primary current carrying device for the circuit breaker.</br>On October 1, 2019, Arizona Public Service Company (APS) completed an evaluation of a deviation, and concluded the condition represented a defect under 10 CFR 21.</br>On October 4, 2019, the Palo Verde Nuclear Generating Station Vice President, Nuclear Engineering, was notified of a defect of GEH Stationary Primary Contact Fingers which met the reporting criteria of 10 CFR 21.21.</br>There are no medium voltage power (Magne-blast) circuit breakers with stationary primary contact fingers impacted by this condition installed in the plant. APS concluded this condition, if installed, could result in the breaker failing to perform its safety function and thus could create a substantial safety hazard.</br>The NRC resident inspector has been informed. NRC resident inspector has been informed.  +
07:00:00, 3 March 2019  +
15:45:00, 4 October 2019  +
07:00:00, 3 March 2019  +
On March 3, 2019, during overhaul activitiOn March 3, 2019, during overhaul activities of the medium voltage power (Magne-blast) circuit breakers, three General Electric Hitachi (GEH) Stationary Primary Contact Fingers Q0114C5382P002 were identified as having contact surfaces with a finish that was rough and unlike the typically smooth finish provided on electrical contact surfaces. These Stationary Primary Contact Fingers are the primary current carrying device for the circuit breaker.</br>On October 1, 2019, Arizona Public Service Company (APS) completed an evaluation of a deviation, and concluded the condition represented a defect under 10 CFR 21.</br>On October 4, 2019, the Palo Verde Nuclear Generating Station Vice President, Nuclear Engineering, was notified of a defect of GEH Stationary Primary Contact Fingers which met the reporting criteria of 10 CFR 21.21.</br>There are no medium voltage power (Magne-blast) circuit breakers with stationary primary contact fingers impacted by this condition installed in the plant. APS concluded this condition, if installed, could result in the breaker failing to perform its safety function and thus could create a substantial safety hazard.</br>The NRC resident inspector has been informed. NRC resident inspector has been informed.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +  and 97  +
00:00:00, 4 October 2019  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
04:41:56, 24 February 2020  +
15:45:00, 4 October 2019  +
false  +
215.406 d (5,169.75 hours, 30.772 weeks, 7.082 months)  +
07:00:00, 3 March 2019  +
Part 21 - Ge Hitachi Primary Contact Finger Surface Defect  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +, 2  +  and 3  +