Following the return of the actuator that … Following the return of the actuator that failed bench testing to GEH, on 6/12/15 at 1804 (CDT), General Electric Hitachi (GEH) notified Dresden Station of a potential parts quality Potential Failure of the EMRV Cutout Switch. It has been determined the notification is applicable to DNPS (Dresden Nuclear Power Station), Units 2 and 3. </br> </br>The GEH investigation concluded that the EMRV actuator assemblies failed to change state because of the failure of the cutout switch to fully close and provide the appropriate current path. Multiple contributing factors were discovered which could have led to the presence of the gaps in the cutout switch. The most significant of these factors is a change in lever arm positioning causing increased forces in the tension spring which prevent proper closure of the cutout switch. Design changes to reduce wear caused by vibration on the actuators changed lever arm position and also allowed for additional dimensional tolerance which tended to increase force in the tension spring.</br> </br>Identification of Facility and Component: DNPS / EMRV Actuator, GEH Part Number 352B2632G001 </br> </br>Safety Significance (e.g., substantial hazard that is or could be created): Identified condition is a Potential Substantial Safety Hazard since it could cause affected EMRVs to fail to operate as designed, which could result in a loss of safety function. Potential to affect the Minimum Critical Power Ratio (MCPR), Reactor Coolant System (RCS), Automatic Depressurization System (ADS), and Low Set Relief Function </br>Plants with similar GEH cutout switches: Quad Cities Nuclear Power Station.</br>Part 21 Reference: EN #51386</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
17:00:00, 5 October 2015 +
51,458 +
22:06:00, 6 October 2015 +
17:00:00, 5 October 2015 +
Following the return of the actuator that … Following the return of the actuator that failed bench testing to GEH, on 6/12/15 at 1804 (CDT), General Electric Hitachi (GEH) notified Dresden Station of a potential parts quality Potential Failure of the EMRV Cutout Switch. It has been determined the notification is applicable to DNPS (Dresden Nuclear Power Station), Units 2 and 3. </br> </br>The GEH investigation concluded that the EMRV actuator assemblies failed to change state because of the failure of the cutout switch to fully close and provide the appropriate current path. Multiple contributing factors were discovered which could have led to the presence of the gaps in the cutout switch. The most significant of these factors is a change in lever arm positioning causing increased forces in the tension spring which prevent proper closure of the cutout switch. Design changes to reduce wear caused by vibration on the actuators changed lever arm position and also allowed for additional dimensional tolerance which tended to increase force in the tension spring.</br> </br>Identification of Facility and Component: DNPS / EMRV Actuator, GEH Part Number 352B2632G001 </br> </br>Safety Significance (e.g., substantial hazard that is or could be created): Identified condition is a Potential Substantial Safety Hazard since it could cause affected EMRVs to fail to operate as designed, which could result in a loss of safety function. Potential to affect the Minimum Critical Power Ratio (MCPR), Reactor Coolant System (RCS), Automatic Depressurization System (ADS), and Low Set Relief Function </br>Plants with similar GEH cutout switches: Quad Cities Nuclear Power Station.</br>Part 21 Reference: EN #51386</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 6 October 2015 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:17:13, 24 September 2017 +
22:06:00, 6 October 2015 +
1.213 d (29.1 hours, 0.173 weeks, 0.0399 months) +
17:00:00, 5 October 2015 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.