A reactor SCRAM occurred at 1856 CST on 2/ … A reactor SCRAM occurred at 1856 CST on 2/7/15 from 100 percent core thermal power. The cause of the SCRAM appears to be a Generator/Turbine trip, but it is still under investigation.</br>Appropriate off-normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached, and no ECCS or Emergency Diesel Generator initiations occurred.</br>Main Steam Isolation Valves remained open and Safety Relief Valves lifted and reseated as designed. Currently, reactor water level is being maintained by the Condensate and Feedwater system in normal band, and reactor pressure is being controlled via turbine bypass valves to the main condenser.</br>Following the reactor SCRAM, all rods fully inserted and all systems functioned as expected. The plant is in a normal electrical lineup.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
00:56:00, 8 February 2015 +
50,795 +
21:47:00, 7 February 2015 +
00:56:00, 8 February 2015 +
A reactor SCRAM occurred at 1856 CST on 2/ … A reactor SCRAM occurred at 1856 CST on 2/7/15 from 100 percent core thermal power. The cause of the SCRAM appears to be a Generator/Turbine trip, but it is still under investigation.</br>Appropriate off-normal event procedures were entered to mitigate the transient with all systems responding as designed. No loss of offsite or ESF power occurred. No ECCS initiation signals were reached, and no ECCS or Emergency Diesel Generator initiations occurred.</br>Main Steam Isolation Valves remained open and Safety Relief Valves lifted and reseated as designed. Currently, reactor water level is being maintained by the Condensate and Feedwater system in normal band, and reactor pressure is being controlled via turbine bypass valves to the main condenser.</br>Following the reactor SCRAM, all rods fully inserted and all systems functioned as expected. The plant is in a normal electrical lineup.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 7 February 2015 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:18:25, 24 September 2017 +
21:47:00, 7 February 2015 +
true +
-0.131 d (-3.15 hours, -0.0187 weeks, -0.00431 months) +
00:56:00, 8 February 2015 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.