Browse wiki
Jump to navigation
Jump to search
This 4 and 8 hour notification is being ma … This 4 and 8 hour notification is being made to report that Salem Unit 1 experienced an unplanned automatic reactor trip and subsequent Auxiliary Feedwater System actuation. The automatic trip was initiated from a generator protection relay. A troubleshooting team is being assembled to determine the exact cause for the generator protection actuation. 11, 12 and 13 Aux Feedwater Pumps automatically started as expected on low</br>Steam Generator water level following the reactor trip. All control rods inserted on the reactor trip. All ECCS and ESF systems functioned as expected.</br>Salem Unit 1 is currently in Mode 3. Reactor Coolant system pressure is at 2235 PSIG and temperature is 547 F with decay heat removal via the Main Steam Dumps and Auxiliary Feedwater Systems. Condenser vacuum was available for the duration of the event.</br>The 12 Chiller was tagged for maintenance prior to this event and had no adverse impact on the post trip plant response or stabilization. No personnel were injured during this event.</br>The licensee notified the NRC Resident Inspectorcensee notified the NRC Resident Inspector +
08:56:00, 7 May 2014 +
50,092 +
07:45:00, 7 May 2014 +
08:56:00, 7 May 2014 +
This 4 and 8 hour notification is being ma … This 4 and 8 hour notification is being made to report that Salem Unit 1 experienced an unplanned automatic reactor trip and subsequent Auxiliary Feedwater System actuation. The automatic trip was initiated from a generator protection relay. A troubleshooting team is being assembled to determine the exact cause for the generator protection actuation. 11, 12 and 13 Aux Feedwater Pumps automatically started as expected on low</br>Steam Generator water level following the reactor trip. All control rods inserted on the reactor trip. All ECCS and ESF systems functioned as expected.</br>Salem Unit 1 is currently in Mode 3. Reactor Coolant system pressure is at 2235 PSIG and temperature is 547 F with decay heat removal via the Main Steam Dumps and Auxiliary Feedwater Systems. Condenser vacuum was available for the duration of the event.</br>The 12 Chiller was tagged for maintenance prior to this event and had no adverse impact on the post trip plant response or stabilization. No personnel were injured during this event.</br>The licensee notified the NRC Resident Inspectorcensee notified the NRC Resident Inspector +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
97 +
00:00:00, 7 May 2014 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:50:52, 2 March 2018 +
07:45:00, 7 May 2014 +
true +
-0.0492 d (-1.18 hours, -0.00702 weeks, -0.00162 months) +
08:56:00, 7 May 2014 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.