During Callaway refueling outage 19 on 5/8During Callaway refueling outage 19 on 5/8/13 at approximately 1900 hour CDT, water was observed dripping from piping insulation in the overhead by RCS loop 4. Further investigation determined it was near Safety Injection (EP) vent valve EPV0109. A scaffold was built and insulation was removed to perform an inspection. At approximately 0509 hours CDT on 5/9/13, engineering inspected the piping and determined there was a crack in the socket weld where 3/4 inch vent valve EPV0109 is connected to the 'B' train injection piping to RCS loop 4 Cold Leg. The estimated leakage rate through the crack is 6 (six) drops per minute. The configuration of this vent valve is a 3/8 inch flow restrictor socket welded to the six inch piping and a 3/4 inch vent valve socket welded to the flow restrictor. The crack is in the socket weld between the ASME code class 1 flow restrictor socket and the ASME code class 2 vent piping.</br>Callaway plant was in mode 6 with refueling pool level greater than 23 feet above the reactor vessel flange at the time of the discovery. The 'A' RHR train which discharges to RCS loops 1 and 3 Cold Legs is the currently operable RHR train. 'B' RHR train was declared inoperable when the weld crack was identified. Only one RHR train is required to be operable at the present plant Mode of applicability. Repair plans are being developed.</br>Basis for Reportability: This condition constitutes abnormal degradation of a principle safety barrier due to unacceptable welding defects within the primary coolant system.</br>There is a check valve between this leak and the reactor coolant system. Therefore, this is considered unisolable and pressure boundary leakage.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
10:09:00, 9 May 2013  +
49,014  +
07:18:00, 9 May 2013  +
10:09:00, 9 May 2013  +
During Callaway refueling outage 19 on 5/8During Callaway refueling outage 19 on 5/8/13 at approximately 1900 hour CDT, water was observed dripping from piping insulation in the overhead by RCS loop 4. Further investigation determined it was near Safety Injection (EP) vent valve EPV0109. A scaffold was built and insulation was removed to perform an inspection. At approximately 0509 hours CDT on 5/9/13, engineering inspected the piping and determined there was a crack in the socket weld where 3/4 inch vent valve EPV0109 is connected to the 'B' train injection piping to RCS loop 4 Cold Leg. The estimated leakage rate through the crack is 6 (six) drops per minute. The configuration of this vent valve is a 3/8 inch flow restrictor socket welded to the six inch piping and a 3/4 inch vent valve socket welded to the flow restrictor. The crack is in the socket weld between the ASME code class 1 flow restrictor socket and the ASME code class 2 vent piping.</br>Callaway plant was in mode 6 with refueling pool level greater than 23 feet above the reactor vessel flange at the time of the discovery. The 'A' RHR train which discharges to RCS loops 1 and 3 Cold Legs is the currently operable RHR train. 'B' RHR train was declared inoperable when the weld crack was identified. Only one RHR train is required to be operable at the present plant Mode of applicability. Repair plans are being developed.</br>Basis for Reportability: This condition constitutes abnormal degradation of a principle safety barrier due to unacceptable welding defects within the primary coolant system.</br>There is a check valve between this leak and the reactor coolant system. Therefore, this is considered unisolable and pressure boundary leakage.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.022 d (0.528 hours, 0.00314 weeks, 7.2295e-4 months)  +  and 0.00589 d (0.141 hours, 8.416005e-4 weeks, 1.936745e-4 months)  +
00:00:00, 9 May 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:22:30, 24 September 2017  +
07:18:00, 9 May 2013  +
false  +
false  +
-0.119 d (-2.85 hours, -0.017 weeks, -0.0039 months)  +
10:09:00, 9 May 2013  +
Reactor Coolant Pressure Boundary Leakage  +