Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41117 +
- ENS 49014 +
- ML20086G793 +
- ML20154C274 +
- ML20214E954 +
- ML20209D204 +
- ML22078A003 +
- ML22271A862 +
- ML23226A027 +
- 05000414/LER-1989-018-01, :on 890807,cold Leg Accumulator Boron Analysis Surveillance Missed Due to Inappropriate Action.Valve 2N179 Not Seating Properly & Allowing Cold Leg Accumulator 2C to Decrease Also Contributed.Meetings Held +
- 05000423/LER-1989-008, :on 890506,manual Reactor Trip Initiated Due to Anticipated Turbine Trip.Caused by Design Deficiency in That Traveling Screen Capacity Was Inadequate.Procedure Change Implemented +
- 05000293/LER-1999-008-02, :on 990805,automatic Scram Occurred While at 100% Power Due to Automatic Turbine Trip.Caused by Malfunction of Moisture Separator Drain Tank a Drain Valve Controller.Level Controllers Replaced.With +
- 05000413/LER-1986-039, :on 860715,turbine Driven Auxiliary Feedwater Pump 1 & Standby Shutdown Sys Discovered Inoperable.Caused by Personnel Failure to Ensure That CA Pump 1 Stop Check Valve Opened Prior to Being Locked +
- 05000267/LER-1988-006, :on 880407,expansion Joint Failure Caused Loss of Circulating Water & Resulted in Manual Scram.Decay HX Cleared Out So Steam Routed Through Circulator & Out Reheat Power Relief Valves.Valves Inspected +
- 05000344/LER-1992-033, :on 921109,plant Shutdown Due to Tube Leak in SG B Exceeding primary-to-secondary Leakage Limits of Ts. Caused by Defect in Tube Row 25,Column 17.Tube Stabilized & Plugged & SG B Slowly Filled +
- 05000498/LER-1991-003, :on 910127,high Alarm on Radiation Monitor RT-8034 Resulted in ESF Actuation of Control Room Ventilation Sys.Cause Unknown.Sample Pump for Radiation Monitor Relaced +
- 05000293/LER-1993-018, :on 930721,planned Shutdown Initiated Due to Unidentified Leakage of 3 Gpm.On 930722,planned Shutdown Became TS Required Shutdown When Insp Revealed Leakage to Be Rc Pressure Boundary Leakage.Leakage Repaired +
- PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058) +
- 05000280/LER-1997-002-01, :on 970116,one Train of Auxiliary Ventilation Sys Declared Inoperable.Caused by Personnel Error.Properly Adjusted Damper 1-VS-MOD-58B & Exited Seven Day LCO on 970116 +
- 05000280/LER-1997-002, :on 970116,one Train of Auxiliary Ventilation Sys Was Inoperable Outside of Ts.Caused by Personnel Error. Submitted Deviation Rept Re Reverse Rotation of Fan & Work Request to Adjust Linkage +
- 05000311/LER-1994-010, :on 940919,CCP Removed from Svc for Scheduled Preventive Maintenance & Increased Vibration Measured in Pump Speed Increaser.Caused by Design/Mfg Component Failure. Pump Replaced & Tested +
- 05000272/LER-1988-015-02, :on 880831,reactor/turbine Trip Occurred Due to Low Auto Stop Oil Sys Pressure.Caused by Equipment Problem. Functional Testing of Various Turbine Trip Mechanisms Completed Satisfactorily +
- 05000416/LER-2016-008, Regarding Entry Into Mode of Applicability with the Alternate Decay Heat Removal System Inoperable +
- 05000446/LER-2006-001, Regarding Condition Prohibited by Technical Specifications +
- 05000305/LER-2005-003, Regarding Inadvertent Reactor Protection Trip While Shutdown - Caused by Procedure Adherence Deficiencies and Inadequate Shift Management Oversight +
- 05000305/LER-2005-002, Re Auxiliary Feedwater Pumps Assumed to Fall from Postulated Loss of Primary Water Source - Safe Shutdown and Accident Analysis Assumptions Not Assured - Inadequate Design of Pump Protective Equipment +
- 05000354/LER-2004-010, Manual Reactor Scram Due to Moisture Separator Dump Line Failure +
- 05000293/LER-1999-008-01, Regarding Automatic Scram at 100 Percent Power Due to Turbine Trip +
- L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with +
- 05000482/LER-1994-012, :on 940925,failure to Correctly Calibr Refueling Machine Load Monitor Occurred.Caused by Inadequate Procedure Controlling Calibr,Setup & Checkout of Refuel Machine Load Monitor.Procedure Revised +
- 05000324/LER-1992-001-01, Supplemental LER 92-001-01:on 920202,unit Scrammed During Main Turbine Control Valve Testing.Caused by Excessive Cycling of Turbine Control Valves.Hydraulic Accumulators a & B Disassembled +