Browse wiki
Jump to navigation
Jump to search
98 +
This event is being reported in accordance … This event is being reported in accordance with 10CFR50.72(b)(2)(i). On October 2, 2011, at approximately 0100 hours (EDT), the Perry Nuclear Power Plant commenced a controlled plant shutdown. The shutdown was due to the anticipated investigation and expected repair time of the Unit 1 startup transformer exceeding the Technical Specification (TS) Required Action completion time.</br>On September 29, 2011, at 0529 hours (EDT) the Unit 1 startup transformer failed due to an internal fault, which required entry into TS 3.8.1 Action A.2 for one required offsite circuit inoperable. The determination has been made that the required action, which is to restore the required offsite circuit to OPERABLE status, cannot be met by the required completion time and a plant shutdown is being initiated.</br>The NRC Resident Inspector has been notified.</br>The licensee expects to have the Unit offline between 1300-1400 hours (EDT) and plans to issue a press release. (EDT) and plans to issue a press release. +
05:00:00, 2 October 2011 +
01:06:00, 2 October 2011 +
05:00:00, 2 October 2011 +
This event is being reported in accordance … This event is being reported in accordance with 10CFR50.72(b)(2)(i). On October 2, 2011, at approximately 0100 hours (EDT), the Perry Nuclear Power Plant commenced a controlled plant shutdown. The shutdown was due to the anticipated investigation and expected repair time of the Unit 1 startup transformer exceeding the Technical Specification (TS) Required Action completion time.</br>On September 29, 2011, at 0529 hours (EDT) the Unit 1 startup transformer failed due to an internal fault, which required entry into TS 3.8.1 Action A.2 for one required offsite circuit inoperable. The determination has been made that the required action, which is to restore the required offsite circuit to OPERABLE status, cannot be met by the required completion time and a plant shutdown is being initiated.</br>The NRC Resident Inspector has been notified.</br>The licensee expects to have the Unit offline between 1300-1400 hours (EDT) and plans to issue a press release. (EDT) and plans to issue a press release. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 2 October 2011 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:05:53, 2 March 2018 +
01:06:00, 2 October 2011 +
true +
false +
-0.163 d (-3.9 hours, -0.0232 weeks, -0.00534 months) +
05:00:00, 2 October 2011 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.