At 2210 EST on 11/16/2010, the Unit 1 reac … At 2210 EST on 11/16/2010, the Unit 1 reactor was manually tripped based on decreasing S/G level in Loop 4. Prior to the reactor trip power was at 26% and ascending following completion of a scheduled refueling outage. Moisture Separator Reheater 1C1 safety valve lifted and would not reseat. Turbine was tripped at 2206 EST to isolate steam leak. Following the Turbine trip, automatic S/G level control did not maintain S/G level. Manual control was taken however, S/G level could not be recovered. A manual reactor trip was initiated due to low narrow range S/G level. All other plant systems responded as expected.</br>All rods fully inserted into the core during the trip. The reactor is at normal operating pressure and temperature and operators are removing decay heat via the steam dumps to condenser. As expected, the auxiliary feedwater system actuated during the transient. The grid is stable and the plant is in its normal shutdown electrical lineup. There is no known primary-to-secondary leakage. Plant response to the trip was considered normal and uncomplicated. Unit 2 was not affected by this event.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
03:10:00, 17 November 2010 +
23:43:00, 16 November 2010 +
03:10:00, 17 November 2010 +
At 2210 EST on 11/16/2010, the Unit 1 reac … At 2210 EST on 11/16/2010, the Unit 1 reactor was manually tripped based on decreasing S/G level in Loop 4. Prior to the reactor trip power was at 26% and ascending following completion of a scheduled refueling outage. Moisture Separator Reheater 1C1 safety valve lifted and would not reseat. Turbine was tripped at 2206 EST to isolate steam leak. Following the Turbine trip, automatic S/G level control did not maintain S/G level. Manual control was taken however, S/G level could not be recovered. A manual reactor trip was initiated due to low narrow range S/G level. All other plant systems responded as expected.</br>All rods fully inserted into the core during the trip. The reactor is at normal operating pressure and temperature and operators are removing decay heat via the steam dumps to condenser. As expected, the auxiliary feedwater system actuated during the transient. The grid is stable and the plant is in its normal shutdown electrical lineup. There is no known primary-to-secondary leakage. Plant response to the trip was considered normal and uncomplicated. Unit 2 was not affected by this event.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
26 +
00:00:00, 16 November 2010 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:08:25, 2 March 2018 +
23:43:00, 16 November 2010 +
true +
true +
-0.144 d (-3.45 hours, -0.0205 weeks, -0.00473 months) +
03:10:00, 17 November 2010 +