Event: At 10:59 hours on 5-15-06, while in … Event: At 10:59 hours on 5-15-06, while in Mode 6 following completion of refueling activities, Oconee Unit 3 experienced a lockout of CT-3, the transformer for the Startup power source, which was in service at the time. This resulted in a momentary loss of AC power to the unit. Keowee Hydro Station, the Oconee emergency power source received an automatic emergency start signal, started, and closed in to supply power via the Underground Emergency Power path within approximately 40 seconds.</br>Initial Safety Significance: Initial conditions of significant systems: Normal power via backcharge of main transformer was not available. The Fuel Transfer Canal was full and valves open connecting it to the Spent Fuel Pool. Time to core boil was 58 minutes per procedure. The Equipment Hatch was open. The initial loss of power resulted in interruption of Decay Heat Removal (DHR) Cooling, Spent Fuel Pool Cooling, and other support systems. Power was automatically restored and the affected systems returned to service promptly. Therefore there was no safety significance to this event. Reactor Coolant System heated up from approximately 80F to approximately 89.5F during this event.</br>Corrective Action(s): As stated, Keowee started and supplied power automatically. The appropriate Abnormal Procedures were entered to restore power and restart these systems. DHR was restored at 11:13. Actions were initiated to achieve Containment Closure due to the loss of DHR. The Equipment Hatch was closed by 11:40. Backup power is available from Central Switchyard via CT-5. The cause of the initiating transformer lock out is under investigation.</br>The licensee informed the NRC Resident Inspector.ensee informed the NRC Resident Inspector. +
14:59:00, 15 May 2006 +
42,576 +
13:48:00, 15 May 2006 +
14:59:00, 15 May 2006 +
Event: At 10:59 hours on 5-15-06, while in … Event: At 10:59 hours on 5-15-06, while in Mode 6 following completion of refueling activities, Oconee Unit 3 experienced a lockout of CT-3, the transformer for the Startup power source, which was in service at the time. This resulted in a momentary loss of AC power to the unit. Keowee Hydro Station, the Oconee emergency power source received an automatic emergency start signal, started, and closed in to supply power via the Underground Emergency Power path within approximately 40 seconds.</br>Initial Safety Significance: Initial conditions of significant systems: Normal power via backcharge of main transformer was not available. The Fuel Transfer Canal was full and valves open connecting it to the Spent Fuel Pool. Time to core boil was 58 minutes per procedure. The Equipment Hatch was open. The initial loss of power resulted in interruption of Decay Heat Removal (DHR) Cooling, Spent Fuel Pool Cooling, and other support systems. Power was automatically restored and the affected systems returned to service promptly. Therefore there was no safety significance to this event. Reactor Coolant System heated up from approximately 80F to approximately 89.5F during this event.</br>Corrective Action(s): As stated, Keowee started and supplied power automatically. The appropriate Abnormal Procedures were entered to restore power and restart these systems. DHR was restored at 11:13. Actions were initiated to achieve Containment Closure due to the loss of DHR. The Equipment Hatch was closed by 11:40. Backup power is available from Central Switchyard via CT-5. The cause of the initiating transformer lock out is under investigation.</br>The licensee informed the NRC Resident Inspector.ensee informed the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 15 May 2006 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:18:46, 2 March 2018 +
13:48:00, 15 May 2006 +
false +
false +
-0.0492 d (-1.18 hours, -0.00702 weeks, -0.00162 months) +
14:59:00, 15 May 2006 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.