On January 25, 2003 at 1414 hours with UniOn January 25, 2003 at 1414 hours with Unit 2 at 100% power, the reactor tripped due to turbine trip from a main generator trip. The main generator trip was due to Main Transformer and Generator Leads current differential lockout. The differential lockout resulted from a shorted main generator current transformer (CT) lead. Emergency systems functioned as required for the Unit 2 trip. At the time of the Unit 2 reactor trip, Unit 1 was off-line. Load shed occurred on the Unit 1 station service busses as designed. The Unit 1 'B' Main Feed Pump tripped, and since the Unit 1 'A' Main Feed Pump had previously been shut down, a start signal was initiated to both Unit 1 Motor Driven Auxiliary Feedwater Pumps (MDAFWPs) at approximately 1414 hours. The damaged CT leads were repaired. Inspection of like components on Units 1 and 2 was performed, and repairs made as necessary. The automatic actuation of the Unit 2 reactor trip, the actuation of Unit 2 Auxiliary Feedwater, and the automatic actuation of Unit 1 Auxiliary Feedwater are reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A).accordance with 10 CFR 50.73(a)(2)(iv)(A).  +
March 26, 2003  +
January 25, 2003  +
On January 25, 2003 at 1414 hours with UniOn January 25, 2003 at 1414 hours with Unit 2 at 100% power, the reactor tripped due to turbine trip from a main generator trip. The main generator trip was due to Main Transformer and Generator Leads current differential lockout. The differential lockout resulted from a shorted main generator current transformer (CT) lead. Emergency systems functioned as required for the Unit 2 trip. At the time of the Unit 2 reactor trip, Unit 1 was off-line. Load shed occurred on the Unit 1 station service busses as designed. The Unit 1 'B' Main Feed Pump tripped, and since the Unit 1 'A' Main Feed Pump had previously been shut down, a start signal was initiated to both Unit 1 Motor Driven Auxiliary Feedwater Pumps (MDAFWPs) at approximately 1414 hours. The damaged CT leads were repaired. Inspection of like components on Units 1 and 2 was performed, and repairs made as necessary. The automatic actuation of the Unit 2 reactor trip, the actuation of Unit 2 Auxiliary Feedwater, and the automatic actuation of Unit 1 Auxiliary Feedwater are reportable in accordance with 10 CFR 50.73(a)(2)(iv)(A).accordance with 10 CFR 50.73(a)(2)(iv)(A).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0164 d (0.393 hours, 0.00234 weeks, 5.38027e-4 months)  +, 0.0166 d (0.398 hours, 0.00237 weeks, 5.45637e-4 months)  +, 0.0167 d (0.4 hours, 0.00238 weeks, 5.4792e-4 months)  +, 0.0174 d (0.417 hours, 0.00248 weeks, 5.711305e-4 months)  +, 0.019 d (0.457 hours, 0.00272 weeks, 6.259225e-4 months)  +, 0.0188 d (0.451 hours, 0.00268 weeks, 6.175515e-4 months)  +, 0.0191 d (0.459 hours, 0.00273 weeks, 6.289665e-4 months)  +  and 0.02 d (0.479 hours, 0.00285 weeks, 6.563625e-4 months)  +
2,003  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
15:09:31, 27 November 2017  +
March 26, 2003  +
January 25, 2003  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.