Issue date | Title | |
---|---|---|
L-2022-051, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information | 29 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II, Supplement Information and Response to Request for Additional Information |
ML22081A029 | 21 March 2022 | NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative |
L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II | 10 March 2022 | Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II |
IR 05000250/2021004 | 2 February 2022 | Integrated Inspection Report 05000250/2021004 and 05000251/2021004 |
IR 05000250/2018004 | 11 February 2019 | Nuclear Regulatory Commission Integrated Inspection Report 05000250/2018004 and 05000251/2018004 |
L-2018-166, WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. | 31 October 2018 | WCAP-15355-NP, Revision 0, a Demonstration of Applicability of ASME Code Case N-481 to the Primary Loop Pump Casings. |
ML18296A024 | 16 October 2018 | Set 3 Response to Request for Additional Information to Subsequent License Renewal Application Safety Review |
ML18230B482 | 15 October 2018 | Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review |
ML18259A000 | 17 September 2018 | Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 |
ML18243A006 | 17 September 2018 | Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 |
ML16132A188 | 11 May 2016 | Attachment - 14 in Support of the 2.206 Enforcement Petition Related to the FPL Turkey Point Nuclear Plant |
ML16011A440 | 1 February 2016 | Safety Evaluation for Relief Request No. 2 for the Fifth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations of the Regenerative Heat Exchanger Welds (MF6384-MF6385) |
ML16027A147 | 27 January 2016 | NRC Integrated Inspection Report 05000250/2015004, 05000251/2015004, October 1, 2015 to December 31, 2015 |
L-2016-006, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4 | 14 January 2016 | Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4 |
ML15328A240 | 11 December 2015 | Safety Evaluation for Relief Request No. 15, for the Fourth 10-Year Inservice Inspection Interval Regarding the Amount of Coverage Obtained During Specific Examinations |
ML15271A325 | 14 October 2015 | Safety Evaluation for Relief Request No. 1, Revision 1 for Fifth 10-Year Inservice Inspection Interval - Repair of Pressurizer Stainless Steel Heater Sleeve Without Flaw Removal |
L-2015-100, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 2 | 8 June 2015 | Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 2 |
L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan | 11 March 2015 | Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan |
ML15077A214 | 2 March 2015 | Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1 |
L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 | 13 February 2015 | Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 |
IR 05000250/2014003 | 31 July 2014 | IR 05000250-14-003, 05000251-14-003; on 01/01/2014 - 03/31/2014; Turkey Point Nuclear Plant, Units 3 & 4; Surveillance Testing |
L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 | 4 April 2014 | Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 |
ML14079A184 | 20 March 2014 | NRR E-mail Capture - Turkey Point 3 & 4 - Acceptance Review for Relief Request No. 14 (TACs MF3564 and MF3565) |
L-2014-073, Inservice Inspection Plan Relief Request No. 14 | 14 March 2014 | Inservice Inspection Plan Relief Request No. 14 |
ML13329A125 | 14 January 2014 | SE for RR No. 12 for 4th 10-Year Inservice Inspection Intervals - System Leakage Test Boundaries of Class 1 Components (TAC Nos, MF1903, MF1904, MF1905, MF1906, MF1907, and MF1908) |
L-2013-288, Response to Request for Additional Information and Re-submittal of Relief Request No. 12 | 9 October 2013 | Response to Request for Additional Information and Re-submittal of Relief Request No. 12 |
ML13282A185 | 9 September 2013 | NRR E-mail Capture - RAIs for TACs MF1903-08 Regarding Relief Request #12 |
L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 12 | 24 May 2013 | Inservice Inspection Plan Submittal of Relief Request No. 12 |
IR 05000250/2010005 | 27 January 2011 | |
ML110280004 | 27 January 2011 | Integrated Inspection Report 2010-005 |
ML101720552 | 8 June 2010 | Transcript for Advisory Committee on Reactor Safeguards - License Renewal Subcommittee (Duane Arnold), Pages 1-186 |
ML090440188 | 13 February 2009 | Notification of Inspection and Request for Information |
ML080670499 | 7 March 2008 | Notification of Inspection and Request of Information |
IR 05000250/2007004 | 30 October 2007 | |
L-2007-036, Inservice Inspection Report | 8 March 2007 | Inservice Inspection Report |
L-2007-013, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds | 31 January 2007 | Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds |
ML062500118 | 29 August 2006 | Notification of Inspection and Request for Information |
L-2006-158, Inservice Inspection Record | 28 June 2006 | Inservice Inspection Record |
ML060270304 | 27 January 2006 | Notification of Inspection and Request for Information |
L-2005-136, NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results | 20 June 2005 | NRC BL-03-002 Plant Reactor Pressure Vessel Lower Head Penetrations Post Outage Inspection Results |
ML050810621 | 22 April 2005 | Turkey Pt. Units 3 & 4, Ltr, Response to Bulletin 2003-02 Leakage from RPV Lh Penetrations and RCPB Integrity |
ML050350363 | 3 March 2005 | Relief Request 1, Authorization of ISI Interval |
L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations. | 15 February 2005 | Refueling Outage Summary of Inservice Inspection Examinations. |
IR 05000250/2004005 | 28 January 2005 | IR 05000250-04-005, IR 05000251-04-005 on 09/26/2004 - 12/31/2004 for Turkey Point, Units 3 and 4; Event Followup; Inservice Inspection Activities; and Other Activities |
L-2004-144, Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | 27 July 2004 | Revised Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity |
L-2004-160, NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors | 27 July 2004 | NRC Bulletin 2004-01 Inspection of Alloy 821182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
L-2004-025, Transmittal of Inservice Inspection Report | 30 January 2004 | Transmittal of Inservice Inspection Report |
L-2003-234, NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results. | 19 December 2003 | NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity Inspection Results. |
ML033040149 | 30 October 2003 | Clarification Regarding Relief Request Concerning risk-informed Inservice Inspection |
L-2003-260, Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request | 13 October 2003 | Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request |