Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000341/20230108 December 2023Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010
IR 05000341/20230037 November 2023Integrated Inspection Report 05000341/2023003 and 07200071/2023001
ML22325A12417 November 20224 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides
ML22325A13517 November 20224 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22325A13817 November 20224 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
IR 05000341/20220024 August 2022Integrated Inspection Report 05000341/2022002
ML21055A0612 February 20213 to Updated Final Safety Analysis Report, Appendix A.1, Division 1 Applicable Regulatory Guides
ML21055A0732 February 20213 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML21055A0762 February 20213 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
IR 05000341/201900226 July 2019Integrated Inspection Report 05000341/2019002 and 07200071/2019001
ML17298B26716 October 2017Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML17298B26416 October 2017Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
IR 05000341/20170071 August 2017NRC Problem Identification and Resolution Inspection Report 05000341/2017007
ML16165A45826 May 2016Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls26 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems26 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a26 May 2016Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a
NRC-16-0034, Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Base26 May 2016Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Bases,.
ML16165A44826 May 2016Revision 20 to Updated Final Safety Analysis Report. Appendix a
ML16165A44126 May 2016Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Bases,.
ML16165A45626 May 2016Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML15287A05313 October 20152015 Fermi Power Plant Initial License Examination Proposed Written Exam
ML15268A03831 August 20152015 Fermi Power Plant Initial License Examination Administered Written Examination
NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases5 November 2012Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases
IR 05000341/20090035 August 2009IR 05000341-09-003, on 04/01/2009 - 06/30/2009, Fermi Power Plant, Unit 2; Outage Activities, Problem Identification and Resolution, Follow Up of Events and Notices of Enforcement Discretion
IR 05000341/20060032 August 2006IR 05000341-06-003; 04/01/2006-06/30/2006; Fermi Power Plant, Unit 2; Fire Protection, Maintenance Risk Assessment, Operability Evaluations, Refueling and Outage Activities
IR 05000341/200501425 October 2005IR 05000341-05-014 on 07/01/2005-09/30/2005 for Fermi Power Plant, Unit 2; Operability Evaluations, Event Follow-up
IR 05000341/20050123 August 2005IR 05000341-05-012, on 04/01/2005-06/30/2005; Fermi Power Plant, Unit 2; Event Followup, Emergency Response Organization Augmentation Testing, Correction of Emergency Preparedness Weaknesses and Deficiencies
IR 05000341/200500412 May 2005IR 05000341-05-004 and 05000341-05-005 on 01/01/2005-03/31/2005; Fermi Power Plant, Unit 2; Maintenance Risk Assessments and Emergent Work Evaluation, Operability Evaluations, Post Maintenance Testing, Radioactive Material Processing and Tr
IR 05000341/20040084 February 2005IR 05000341-04-008 on 10/01/2004-12/31/2004 for Fermi, Unit 2; Inservice Inspection Activities, Refueling Outage, Surveillance Testing, Event Followup
ML04035004120 January 2004Revision 29 to the Radiological Emergency Response Preparedness Plan
ML20211Q7353 September 1999Proposed Its,Rev 15
ML20044G45524 May 1993Proposed Tech Specs Modifies Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys
ML20204K11712 October 1988Insp Rept 50-341/88-21 on 880716-0831.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Followup of Events, LER Followup,Personnel Qualifications & Regional Requests
IR 05000341/19870246 July 1987Insp Rept 50-341/87-24 on 870615-18.Major Areas Inspected: Emergency Preparedness Program,Action on Open Items, Activations of Emergency Plan,Emergency Detection & Classification & Dose Assessment
IR 05000341/198603113 November 1986Insp Rept 50-341/86-31 on 861021-23.No Violations or Deviations Noted.Major Areas Inspected:Emergency Exercise Key Functions & Locations
IR 05000341/198504121 October 1985Insp Rept 50-341/85-41 on 851001-03.No Violation or Deviation Noted.Exercise Weakness Identified Re Protective Action Decisionmaking.Scope,Objectives & Simulations for Fermex 85 Encl
ML20133D56831 July 1985Technical Specifications for FERMI-2 Facility.Docket No. 50-341. (Detroit Edison Company)
ML20129C74015 July 1985Certifies That Encl Proposed Tech Specs Consistent W/Util 850606,21 & 27 Submittals & Additions & Clarifications Required by Nrc.Tech Specs Reflect Design,Fsar & SER in All Matl Aspects
ML20093J50618 May 1982Forwards Seismic Reassessment of NSSS Piping.All Piping Stresses within ASME Code Values.Some Snubber Loads Exceed Rated Loads & Three Reactor Pressure Vessel Nozzles Have Loads in Excess of Allowable Value.Snubber Upgrade Underway