Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000341/2023010 | 8 December 2023 | Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 |
IR 05000341/2023003 | 7 November 2023 | Integrated Inspection Report 05000341/2023003 and 07200071/2023001 |
ML22325A124 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides |
ML22325A135 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML22325A138 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
IR 05000341/2022002 | 4 August 2022 | Integrated Inspection Report 05000341/2022002 |
ML21055A061 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Appendix A.1, Division 1 Applicable Regulatory Guides |
ML21055A073 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML21055A076 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
IR 05000341/2019002 | 26 July 2019 | Integrated Inspection Report 05000341/2019002 and 07200071/2019001 |
ML17298B267 | 16 October 2017 | Revision 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML17298B264 | 16 October 2017 | Revision 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
IR 05000341/2017007 | 1 August 2017 | NRC Problem Identification and Resolution Inspection Report 05000341/2017007 |
ML16165A458 | 26 May 2016 | Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a | 26 May 2016 | Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report. Appendix a |
NRC-16-0034, Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Base | 26 May 2016 | Fermi, Unit 2, Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Bases,. |
ML16165A448 | 26 May 2016 | Revision 20 to Updated Final Safety Analysis Report. Appendix a |
ML16165A441 | 26 May 2016 | Submittal of Revision 20 Updated Final Safety Analysis Report, 10CFR50.59 and 10CFR72.48 Evaluation Summary Reports, Commitment Management Report & Revisions to Technical Requirements Manual & Technical Specifications Bases,. |
ML16165A456 | 26 May 2016 | Revision 20 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML15287A053 | 13 October 2015 | 2015 Fermi Power Plant Initial License Examination Proposed Written Exam |
ML15268A038 | 31 August 2015 | 2015 Fermi Power Plant Initial License Examination Administered Written Examination |
NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases | 5 November 2012 | Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases |
IR 05000341/2009003 | 5 August 2009 | IR 05000341-09-003, on 04/01/2009 - 06/30/2009, Fermi Power Plant, Unit 2; Outage Activities, Problem Identification and Resolution, Follow Up of Events and Notices of Enforcement Discretion |
IR 05000341/2006003 | 2 August 2006 | IR 05000341-06-003; 04/01/2006-06/30/2006; Fermi Power Plant, Unit 2; Fire Protection, Maintenance Risk Assessment, Operability Evaluations, Refueling and Outage Activities |
IR 05000341/2005014 | 25 October 2005 | IR 05000341-05-014 on 07/01/2005-09/30/2005 for Fermi Power Plant, Unit 2; Operability Evaluations, Event Follow-up |
IR 05000341/2005012 | 3 August 2005 | IR 05000341-05-012, on 04/01/2005-06/30/2005; Fermi Power Plant, Unit 2; Event Followup, Emergency Response Organization Augmentation Testing, Correction of Emergency Preparedness Weaknesses and Deficiencies |
IR 05000341/2005004 | 12 May 2005 | IR 05000341-05-004 and 05000341-05-005 on 01/01/2005-03/31/2005; Fermi Power Plant, Unit 2; Maintenance Risk Assessments and Emergent Work Evaluation, Operability Evaluations, Post Maintenance Testing, Radioactive Material Processing and Tr |
IR 05000341/2004008 | 4 February 2005 | IR 05000341-04-008 on 10/01/2004-12/31/2004 for Fermi, Unit 2; Inservice Inspection Activities, Refueling Outage, Surveillance Testing, Event Followup |
ML040350041 | 20 January 2004 | Revision 29 to the Radiological Emergency Response Preparedness Plan |
ML20211Q735 | 3 September 1999 | Proposed Its,Rev 15 |
ML20044G455 | 24 May 1993 | Proposed Tech Specs Modifies Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys |
ML20204K117 | 12 October 1988 | Insp Rept 50-341/88-21 on 880716-0831.Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety,Maint,Surveillance,Followup of Events, LER Followup,Personnel Qualifications & Regional Requests |
IR 05000341/1987024 | 6 July 1987 | Insp Rept 50-341/87-24 on 870615-18.Major Areas Inspected: Emergency Preparedness Program,Action on Open Items, Activations of Emergency Plan,Emergency Detection & Classification & Dose Assessment |
IR 05000341/1986031 | 13 November 1986 | Insp Rept 50-341/86-31 on 861021-23.No Violations or Deviations Noted.Major Areas Inspected:Emergency Exercise Key Functions & Locations |
IR 05000341/1985041 | 21 October 1985 | Insp Rept 50-341/85-41 on 851001-03.No Violation or Deviation Noted.Exercise Weakness Identified Re Protective Action Decisionmaking.Scope,Objectives & Simulations for Fermex 85 Encl |
ML20133D568 | 31 July 1985 | Technical Specifications for FERMI-2 Facility.Docket No. 50-341. (Detroit Edison Company) |
ML20129C740 | 15 July 1985 | Certifies That Encl Proposed Tech Specs Consistent W/Util 850606,21 & 27 Submittals & Additions & Clarifications Required by Nrc.Tech Specs Reflect Design,Fsar & SER in All Matl Aspects |
ML20093J506 | 18 May 1982 | Forwards Seismic Reassessment of NSSS Piping.All Piping Stresses within ASME Code Values.Some Snubber Loads Exceed Rated Loads & Three Reactor Pressure Vessel Nozzles Have Loads in Excess of Allowable Value.Snubber Upgrade Underway |