 Issue dateTitle
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.12 December 2023Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.
ML23195A07829 August 2023Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1
IR 05000324/202300110 May 2023Integrated Inspection Report 05000324 2023001 and 05000325 2023001
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements
IR 05000324/202100310 November 2021Team Electric Plant; Integrated Inspection Report 05000324/2021003 and 05000325/2021003
IR 05000324/202100211 August 2021Integrated Inspected Report 05000324/2021002 and 05000325/2021002
IR 05000324/20190029 August 2019Integrated Inspection Report 05000324/2019002 and 05000325/2019002; 07200006/2019001
IR 05000324/20180012 May 2018NRC Integrated Inspection Report 05000325/2018001 and 05000324/2018001
ML18039A44413 April 2018Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2
ML20311A6316 November 20172017 Q1-Q4 ROP Inspection Findings
BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.29 June 2017Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.
ML17096A12924 May 2017Issuance of Amendments Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program
ML13032A56029 January 2013Initial Exam 2012-301 Final Administrative Documents
ML13032A18529 January 2013Initial Exam 2012-301 Draft RO Written Exam
ML13008A5543 January 2013Initial Exam 2012-301 Final RO Written Exam
ML12237A05314 August 2012Technical Specification Bases, Brunswick Steam Electric Plant, Unit 1 - Renewed Facility Operating License DPR-71, Revision 80
IR 05000324/201200330 July 2012IR 05000325-12-003, 05000324-12-003; 04/01/12 - 06/30/12; Brunswick Steam Electric Plant, Units 1 & 2; Follow-up of Events
IR 05000324/201200720 April 2012IR 05000324-12-007, on 02/07/2012 - 04/04/2012, Brunswick Steam Electric Plant, Unit 2, Other Activities
IR 05000325/201200720 April 2012IR 05000324-12-007, on 02/07/2012 - 04/04/2012, Brunswick Steam Electric Plant, Unit 2, Other Activities
ML12031037727 January 2012IR 05000325-11-005, 05000324-11-005, 05000325-11-502 & 05000324-11-502, 10/01/11 -12/31/11, Brunswick Steam Electric Plant, Units 1 & 2; Maintenance Effectiveness
IR 05000324/201100527 January 2012IR 05000325-11-005, 05000324-11-005, 05000325-11-502 & 05000324-11-502, 10/01/11 -12/31/11, Brunswick Steam Electric Plant, Units 1 & 2; Maintenance Effectiveness
IR 05000325/201101325 January 2012Brunswick Nuclear Plant - NRC Special Inspection Report 05000324-11-013
ML12025055625 January 2012Brunswick Nuclear Plant - NRC Special Inspection Report 05000324-11-013
ML11270A37121 December 2011Issuance of Amendments Regarding Adoption of TSTF-514
PNO-II-11-006, A - Preliminary Notification of Event or Unusual Occurrence (Brunswick, Unit 2)30 November 2011PNO-II-11-006A - Preliminary Notification of Event or Unusual Occurrence (Brunswick, Unit 2)
ML11325060121 November 2011PNO-II-11-006 - Preliminary Notification of Event or Unusual Occurence (Brunswick Unit 2)
ML11325049521 November 2011Special Inspection Charter to Evaluate Brunswick Reactor Vessel Head Tensioning Issue
BSEP 11-0068, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation12 July 2011License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation
ML08322046930 October 2008Renewed Facility Operating License, Technical Specification Bases, Revision 60
ML08122030117 April 2008April 2008 Retake Exam 05000325/2008301 - Final RO Written Exam & Answer Key
ML07296053631 January 2007July-August Exam - 325, 324/2007-301, Draft RO Written Exam with Answers, Reactor Operator Written Exam
BSEP 06-0129, Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel22 January 2007Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel
IR 05000324/200500530 January 2006IR 05000325-05-005, IR 05000324-05-005 on 10/01/2005 - 12/31/2005 for Brunswick Steam Electric Plant, Units 1 and 2; Identification and Resolution of Problems
IR 05000324/200500329 July 2005IR 05000325-05-003, IR 05000324-05-003 on 04/01/2005 - 06/30/2005 for Brunswick Steam Electric Plant, Units 1 & 2; Refueling Outage, Permanent Plant Modification, Problem Identification and Resolution
ML05159050128 June 2005Amendment, TS 3.4.5 RCS Ld Instrumentation (Tac No. MC7216, MC7217)
BSEP 05-0060, Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.17 May 2005Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.
BSEP 05-0059, Request for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.13 May 2005Request for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation.
IR 05000324/200500229 April 2005IR 05000325-05-002 & IR 05000324-05-002, on 01/01 - 03/31/2005, Brunswick Units 1 & 2. Problem Identification & Event Followup
IR 05000324/200400319 July 2004IR 05000325-04-003 and IR 05000324-04-003 on 03/21/2004 - 06/19/2004 for Brunswick Steam Electric Plant, Units 1 and 2; Maintenance Effectiveness, Permanent Plant Modifications, and Other Activities
ML03290000416 October 2003IR 05000325-03-005, 05000324-03-005, on 06/22/2003 - 09/20/2003; Brunswick Steam Electric Plant, Units 1 and 2; Problem Identification and Resolution. Non-Cited Violation Noted
ML03070002121 March 2003Relief ,Third 10-Year Interval Inservice Inspection Program Plan Relief RR-29 and RR-30 for Brunswick Units 1 & 2
BSEP-02-0198, Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations18 December 2002Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations
BSEP 02-0116, Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 216 July 2002Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 2
ML20134K9381 November 1996Proposed Tech Specs Re Full Implementation of BWROG Enhanced Option 1-A Reactor Stability Long Term Solution
ML20128H2031 October 1996Proposed Tech Specs,Allowing Uprate of Units to 105% of Rated Thermal Power
ML20101N4802 April 1996Proposed Tech Specs,Allowing 105% Thermal Power Uprate
ML20094A08623 October 1995Proposed Tech Specs Re RCS Conductivity
ML20078Q22015 December 1994Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds
ML20077B4154 November 1994Provides NRC W/Encl Exam Comments for Exam Given on 941024 at Plant
ML20094N29030 March 1992Documents Info Presented During 920326 Telcon Re Util Commitments for Monitoring Crack Growth Rate Conditions in RCS Using Data Obtained from Crack Arrest Verification Sys During Cycle 8 Operation