Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | 12 December 2023 | Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 |
IR 05000324/2023001 | 10 May 2023 | Integrated Inspection Report 05000324 2023001 and 05000325 2023001 |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements |
IR 05000324/2021003 | 10 November 2021 | Team Electric Plant; Integrated Inspection Report 05000324/2021003 and 05000325/2021003 |
IR 05000324/2021002 | 11 August 2021 | Integrated Inspected Report 05000324/2021002 and 05000325/2021002 |
IR 05000324/2019002 | 9 August 2019 | Integrated Inspection Report 05000324/2019002 and 05000325/2019002; 07200006/2019001 |
IR 05000324/2018001 | 2 May 2018 | NRC Integrated Inspection Report 05000325/2018001 and 05000324/2018001 |
ML18039A444 | 13 April 2018 | Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 |
ML20311A631 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 29 June 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
ML17096A129 | 24 May 2017 | Issuance of Amendments Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program |
ML13032A560 | 29 January 2013 | Initial Exam 2012-301 Final Administrative Documents |
ML13032A185 | 29 January 2013 | Initial Exam 2012-301 Draft RO Written Exam |
ML13008A554 | 3 January 2013 | Initial Exam 2012-301 Final RO Written Exam |
ML12237A053 | 14 August 2012 | Technical Specification Bases, Brunswick Steam Electric Plant, Unit 1 - Renewed Facility Operating License DPR-71, Revision 80 |
IR 05000324/2012003 | 30 July 2012 | IR 05000325-12-003, 05000324-12-003; 04/01/12 - 06/30/12; Brunswick Steam Electric Plant, Units 1 & 2; Follow-up of Events |
IR 05000324/2012007 | 20 April 2012 | IR 05000324-12-007, on 02/07/2012 - 04/04/2012, Brunswick Steam Electric Plant, Unit 2, Other Activities |
IR 05000325/2012007 | 20 April 2012 | IR 05000324-12-007, on 02/07/2012 - 04/04/2012, Brunswick Steam Electric Plant, Unit 2, Other Activities |
ML120310377 | 27 January 2012 | IR 05000325-11-005, 05000324-11-005, 05000325-11-502 & 05000324-11-502, 10/01/11 -12/31/11, Brunswick Steam Electric Plant, Units 1 & 2; Maintenance Effectiveness |
IR 05000324/2011005 | 27 January 2012 | IR 05000325-11-005, 05000324-11-005, 05000325-11-502 & 05000324-11-502, 10/01/11 -12/31/11, Brunswick Steam Electric Plant, Units 1 & 2; Maintenance Effectiveness |
IR 05000325/2011013 | 25 January 2012 | Brunswick Nuclear Plant - NRC Special Inspection Report 05000324-11-013 |
ML120250556 | 25 January 2012 | Brunswick Nuclear Plant - NRC Special Inspection Report 05000324-11-013 |
ML11270A371 | 21 December 2011 | Issuance of Amendments Regarding Adoption of TSTF-514 |
PNO-II-11-006, A - Preliminary Notification of Event or Unusual Occurrence (Brunswick, Unit 2) | 30 November 2011 | PNO-II-11-006A - Preliminary Notification of Event or Unusual Occurrence (Brunswick, Unit 2) |
ML113250601 | 21 November 2011 | PNO-II-11-006 - Preliminary Notification of Event or Unusual Occurence (Brunswick Unit 2) |
ML113250495 | 21 November 2011 | Special Inspection Charter to Evaluate Brunswick Reactor Vessel Head Tensioning Issue |
BSEP 11-0068, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | 12 July 2011 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation |
ML083220469 | 30 October 2008 | Renewed Facility Operating License, Technical Specification Bases, Revision 60 |
ML081220301 | 17 April 2008 | April 2008 Retake Exam 05000325/2008301 - Final RO Written Exam & Answer Key |
ML072960536 | 31 January 2007 | July-August Exam - 325, 324/2007-301, Draft RO Written Exam with Answers, Reactor Operator Written Exam |
BSEP 06-0129, Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel | 22 January 2007 | Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel |
IR 05000324/2005005 | 30 January 2006 | IR 05000325-05-005, IR 05000324-05-005 on 10/01/2005 - 12/31/2005 for Brunswick Steam Electric Plant, Units 1 and 2; Identification and Resolution of Problems |
IR 05000324/2005003 | 29 July 2005 | IR 05000325-05-003, IR 05000324-05-003 on 04/01/2005 - 06/30/2005 for Brunswick Steam Electric Plant, Units 1 & 2; Refueling Outage, Permanent Plant Modification, Problem Identification and Resolution |
ML051590501 | 28 June 2005 | Amendment, TS 3.4.5 RCS Ld Instrumentation (Tac No. MC7216, MC7217) |
BSEP 05-0060, Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. | 17 May 2005 | Request for License Amendment Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. |
BSEP 05-0059, Request for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. | 13 May 2005 | Request for Notice of Enforcement Discretion Technical Specification 3.4.5, RCS Leakage Detection Instrumentation. |
IR 05000324/2005002 | 29 April 2005 | IR 05000325-05-002 & IR 05000324-05-002, on 01/01 - 03/31/2005, Brunswick Units 1 & 2. Problem Identification & Event Followup |
IR 05000324/2004003 | 19 July 2004 | IR 05000325-04-003 and IR 05000324-04-003 on 03/21/2004 - 06/19/2004 for Brunswick Steam Electric Plant, Units 1 and 2; Maintenance Effectiveness, Permanent Plant Modifications, and Other Activities |
ML032900004 | 16 October 2003 | IR 05000325-03-005, 05000324-03-005, on 06/22/2003 - 09/20/2003; Brunswick Steam Electric Plant, Units 1 and 2; Problem Identification and Resolution. Non-Cited Violation Noted |
ML030700021 | 21 March 2003 | Relief ,Third 10-Year Interval Inservice Inspection Program Plan Relief RR-29 and RR-30 for Brunswick Units 1 & 2 |
BSEP-02-0198, Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations | 18 December 2002 | Response to Request for Additional Information Regarding Request for Approval of Relief Request for Reactor Pressure Vessel Nozzle Inner Radius Volumetric Examinations |
BSEP 02-0116, Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 2 | 16 July 2002 | Request for Approval of Relief Requests for the Third 10-year Inservice Inspection Program for Brunswick Units 1 & 2 |
ML20134K938 | 1 November 1996 | Proposed Tech Specs Re Full Implementation of BWROG Enhanced Option 1-A Reactor Stability Long Term Solution |
ML20128H203 | 1 October 1996 | Proposed Tech Specs,Allowing Uprate of Units to 105% of Rated Thermal Power |
ML20101N480 | 2 April 1996 | Proposed Tech Specs,Allowing 105% Thermal Power Uprate |
ML20094A086 | 23 October 1995 | Proposed Tech Specs Re RCS Conductivity |
ML20078Q220 | 15 December 1994 | Rev 1 to Caculation CPL-34Q-301, Weld Overlay Repair Design for BSEP Unit 1 Feedwater Safe-End Welds |
ML20077B415 | 4 November 1994 | Provides NRC W/Encl Exam Comments for Exam Given on 941024 at Plant |
ML20094N290 | 30 March 1992 | Documents Info Presented During 920326 Telcon Re Util Commitments for Monitoring Crack Growth Rate Conditions in RCS Using Data Obtained from Crack Arrest Verification Sys During Cycle 8 Operation |