Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23039A00221 February 2023Audit Summary for License Amendment Request to Adopt Risk-Informed Extended Completion Times Risk Informed Technical Specifications Task Force Initiative 4B
ML22216A20311 August 2022Regulatory Audit in Support of Review of the Application to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B
IR 05000266/202100428 January 2022Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion
ML21102A3432 April 2021Update to Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML21102A3452 April 2021Update to Final Safety Analysis Report, List of Effective Pages
ML20363A17623 February 2021Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis
IR 05000266/202001024 September 2020Biennial Problem Identification and Resolution Inspection Report 05000266/2020010 and 05000301/2020010
ML20064B6633 March 2020NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request 289: Tornado Missile Protection Licensing Basis for Point Beach Nuclear Plant, Units 1 and 2 - EPID L-2020-LLA-0021
NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis6 February 2020License Amendment Request 289: Tornado Missile Protection Licensing Basis
ML19344A01612 December 2019Summary of Pre-Application Public Teleconference with Nextera Energy Point Beach, LLC, for Point Beach Nuclear Plant, Units 1 and 2
IR 05000266/20180111 October 2018NRC Triennial Inspection Changes, Tests and Experiments; Inspection Report 05000266/2018011 and 05000301/2018011 (DRS-G.Hausman)
IR 05000266/20180026 August 2018NRC Integrated Inspection Report 05000266/2018002 and 05000301/2018002 and Exercise of Enforcement Discretion
ML18135A30521 May 2018Enforcement Discretion Per Egm 15-002
IR 05000266/20180018 May 2018NRC Integrated Report 05000266/2018001 and 05000301/2018001 and Exercise of Enforcement Discretion
ML18108A0151 May 2018NextEra Approach to Resolution of Tornado Missile Protection May 1, 2018
NRC 2018-0022, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection26 April 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Nonconformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection.
IR 05000266/20170018 May 2017NRC Integrated Inspection Report 05000266/2017001 and 05000301/2017001
ML16241A00023 September 2016Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation
ML16251A1501 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary
NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan16 December 2015Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan
ML14171A40517 June 2014Comment (6) of James M. Petro, on Behalf of Florida Power & Light Company, on Draft Regulatory Issue Summary 2014-XX, Tornado Missile Protection.
ML13338A51027 January 2014Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML14006A18710 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726
NRC 2013-0024, NextEra Energy Point Beach, Llc'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External...22 February 2013NextEra Energy Point Beach, Llc'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External...
IR 05000266/20120047 November 2012IR 05000266-12-004, 05000301-12-004 & 07200005-12-001; NextEra Energy Point Beach, LLC; 07/01/2012 - 09/30/2012; Point Beach Nuclear Plant, Units 1 and 2, NRC Integrated Inspection Report
NRC 2012-0033, License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 230 April 2012License Amendment Request 268, Supplement 1, One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2, Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 2
NRC 2012-0020, License Amendment Request 268 One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2 Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 226 April 2012License Amendment Request 268 One-Time Only License Amendment to Add Notes for Technical Specifications 3.8.1 and 3.8.2 Actions to Address Nonconformance with Point Beach Nuclear Plant GDC 2
ML12115A08024 April 2012Memo 042412 TIA 2012-07 for Point Beach EDG Tornado Missiles
ML12088A21915 December 2011E-mail from Holly Cruz, NRR to Robert Nelson, NRR, Et Al; Subject: Tia Status Report
IR 05000266/20110042 November 2011IR 05000266-11-004, 05000301-11-004, on 7/01/2011 - 9/30/2011; Point Beach Nuclear Plant, Units 1 and 2; Follow-Up of Events; Component Design Bases Inspection
ML11228A25716 August 2011Final - Task Interface Agreement (TIA) - Evaluation of Point Beach Nuclear Plant Torado Missile Protection Licensing Basis (TIA 2011-011)
IR 05000266/20090021 May 2009IR 05000266-09-002, 05000301-09-002, on 01/01/2009-03/31/2009, Point Beach Nuclear Plant, Units 1 & 2; Equipment Alignment and Maintenance Effectiveness
IR 05000266/200600616 November 2006IR 05000266-06-006, 05000301-06-006, on 08/14/2006 - 10/03/2006, Point Beach, Units 1 and 2, Component Design Bases Inspection
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML17352A86931 May 1993Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants.