W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.16 May 2022Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.
W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt1 October 2021Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt
W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B8 February 2021Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B
ML20258A08811 September 201911 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted
ML20258A07111 September 201911 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted
ML20255A24225 July 201810 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted
ML20255A21825 July 201810 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted
IR 05000382/201700828 December 2017NRC Design Bases Assurance Inspection Report 05000382/2017008
ML17137A1865 April 2017WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19
ML16315A23510 November 2016Responses to Request for Additional Information Set 2 Regarding the License Renewal Application
ML16256A19425 August 2016Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.5 - Missile Protection
ML16256A12625 August 2016Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.3
ML16256A27925 August 2016Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.4
ML16256A19325 August 2016Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design
ML16256A49225 August 2016Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A
ML16256A17425 August 2016Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.3
ML16256A48825 August 2016Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4
ML16256A45225 August 2016Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.5
ML16256A15025 August 2016Revision 309 to Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.3
ML16256A45025 August 2016Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.4
ML16256A44725 August 2016Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.2
W3F1-2016-0031, Notification of Full Compliance with EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events21 July 2016Notification of Full Compliance with EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events
W3F1-2015-0073, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.31 August 2015Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
W3F1-2014-0050, Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Un28 August 2014Third Six-Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Waterford Steam Electric Station, Unit 3
W3F1-2012-0028, Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train22 May 2012Supplement 2 of License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train
IR 05000382/20110083 May 2012IR 05000382-11-008 and 07200075-11-001, on 07/25/2011 - 11/08/2011, Entergy Operations, Inc., Waterford Steam Electric Station, Unit 3, NRC Independent Spent Fuel Storage Installation (ISFSI)
W3F1-2012-0034, Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 201230 April 2012Report of Facility Changes, Tests and Experiments and Commitment Changes for Two Year Period Ending April 25, 2012
IR 05000382/200700215 May 2007IR 05000382-07-002; 01/01/2007-04/07/2007; Waterford Steam Electric Station, Unit 3: Maintenance Rule; Other
ML06145059226 May 2006Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report
ML06128010312 May 2005ER-W3-2004-0615-000, Ultimate Heat Sink Impact Due to Extended Power Up-rate with Design Bases Tornado Event
W3F1-2004-0013, License Amendment Request NPF-38-255, Removal of Requirements Associated with the Ultimate Heat Sink Dry Cooling Tower Fans (TS 3.7.4)5 November 2004License Amendment Request NPF-38-255, Removal of Requirements Associated with the Ultimate Heat Sink Dry Cooling Tower Fans (TS 3.7.4)
ML04064018020 January 2004Electronic Mail Received in Jan. 29, 2004, from EOI on Issue of Removal of TS 3.7.4 Action Statement
ML20155C89027 October 1998Responds to Violations Noted in Insp Rept 50-382/98-201. Corrective Actions:Study Calculation EC-M98-027 Has Been Prepared & Approved That Analyzes Effects of Failure to Full Open Position of One LPSI Throttle Valve
ML20237D24824 August 1998Responds to Violations Noted in Insp Rept 50-382/98-09. Corrective Actions:Operations Personnel Have Been Made Aware of Guidance in Procedure MM-006-106 Re Type of Doors in Plant & Will Revise Appropriate Operating Procedures
IR 05000382/199701427 August 1997Insp Rept 50-382/97-14 on 970707-25.Violations Noted.Major Areas Inspected:Maint & Engineering
ML20210J34014 August 1997Submits Response to Violations Noted in Insp Rept 50-382/97-10.Corrective Actions:Operations Procedure OP-903-001, Tech Spec Surveillance Logs, Revised on 970328 Instructing CR Staff Not to Run WCT Fans Manual
ML20199F14531 May 1997Rept of Facility Changes,Tests & Experiments Per 10CFR50.59 for Period 951201-970531
ML20141K19124 May 1997TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases
ML20141K19524 May 1997Proposed Tech Specs 3/4.7.4 Modifying Ultimate Heat Sink, Table 3.7-3,by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases
ML20134F7306 February 1997Responds to NRC Request Under 10CFR50.54(f) Re Adequacy & Availability of Design Basis Info
IR 05000382/199602310 January 1997Insp Rept 50-382/96-23 on 961021-25 & 1104-08.No Violations Noted.Major Areas Inspected:Operations
ML20135F75310 December 1996Submits Tornado Missile Protection for Ultimate Heat Sink Update
ML20129K2364 November 1996Insp Rept 50-382/96-12 on 960901-1012.Violations Noted.Major Areas Insp:Operations,Maint,Engineering & Plant Support
ML20116B05125 July 1996Proposed Tech Specs,Modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp
ML20125D54618 June 1992Rept of Facility Changes,Tests & Experiments for 1992 Per 10CFR50.59, Covering 910619 to 920618
NUREG-0787, Safety Evaluation Report Related to the Operation of Waterford Steam Electric Station, Unit 3 (Redacted)31 July 1981NUREG-0787, Safety Evaluation Report Related to the Operation of Waterford Steam Electric Station, Unit 3 (Redacted)
ML19208A96114 September 1979Interim Deficiency Rept 13 Re Improper Consolidation of Concrete on Containment Bldg Dome Parapet Wall Placement 521-1B.Vibrators,laborers & Inspectors Were Added to Ensure Proper Placement of Concrete.Next Rept Issue Date Is 800201
ML20062E03121 November 1978Comments on 780928 Appl for Oper Lic for Subj Facil.Finds Appl Is Acceptble for Docketing.Forwards Request for Addl Info for Fsar.Has Not Received Proposed Environ Tech Spec. Forwards ETS for Use as Guide.Review Proc Is Informal