Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23082A35017 April 2023Issuance of Amendment No. 192, Revision of Surveillance Requirements Associated with Emergency Diesel Generator Testing
ML22292A0705 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML22292A0955 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A
ML22292A0835 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5
ML22292A0755 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Sections 9.4 Thru 9.5
ML22292A0765 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1 Thru 8.2
NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators24 May 2022License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators
NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 016 December 2021Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0
IR 05000220/20210114 May 2021Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011
ML21123A1983 May 2021Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML21082A22129 April 2021Issuance of Amendment No. 186, Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B
ML21123A24119 April 2021Final Operating Test (Sections a, B, and C) (Folder 3)
IR 05000220/201700715 November 2017Design Bases Assurance Inspection Report 05000220/2017007 and 05000410/2017007 on 11/15/2017
ML17227A2009 August 2017Radiological Emergency Plan Addendum Revisions; EP-AA-1013, Add. 3, Rev. 3 and EP-AA-1013, Add. 4, Rev. 2
ML17158B25930 May 2017Attachment 3 - EP-AA-1013, Addendum 4, Revision 1, Nine Mile Point Nuclear Station Unit 2 Emergency Classification Technical Bases.
IR 05000220/201700112 May 2017Integrated Inspection Report 05000220/2017001 and 05000410/2017001
ML14076A12326 February 2014Final Operating Exam (Sections a, B, and C) Folder 3)
ML14059A2586 January 2014Draft Operating Exam (Sections a, B, and C) (Folder 2)
ML12306A08725 October 2012NRC Bulletin 2012-01: Design Vulnerability in Electric Power System
ML12107A16912 April 2012Final Operating Exam (Sections a, B, and C) (Folder 3)
ML12045A24213 January 2012Response to NRC Request for Additional Information Regarding the Proposed Change to the Emergency Action Level Scheme, Attachment 1
ML12045A25513 January 2012Updated Revision to Nine Mile Point, Units 1 & 2 - Emergency Action Levels, Attachments 4 and 5
ML11330004122 December 2011Cover Letter - Nine Mile Point Nuclear Station, Unit No. 2 - Issuance of Amendment Extended Power Uprate
ML11356033322 December 2011Extended Power Uprate Safety Evaluation
ML11220015531 October 2011Issuance of Amendment Regarding Extension of Completion Time for Inoperable Division 1 or Division 2 Diesel Generator
ML11130A1496 May 2011Draft a Rev. 00 to Emergency Plan Maintenance Procedure, EPMP-EPP-0102, Unit 2 Emergency Classification Technical Bases.
ML11025027114 January 2011License Amendment Request Pursuant to 10 CFR 50.90: Extension of the Completion Time for an Inoperable Diesel Generator - Response to NRC Request for Additional Information
ML10090046030 March 2010Submittal of License Amendment Request, Extension of Completion Time for an Inoperable Diesel Generator - Technical Specification 3.8.1, AC Sources - Operating
ML10046001618 March 2010Issuance of Amendment Regarding Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing
ML0931406582 November 2009License Amendment Request Re Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing - Response to NRC Request for Additional Information
ML09097027730 March 2009License Amendment Request Pursuant to 10 CFR 50.90: Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing
IR 05000220/200800815 December 2008IR 05000220-08-008, 05000410-08-008, on 10/06/2008 - 10/31/2008, Nine Mile Point, Units 1 and 2, Component Design Bases Inspection
ML08311045722 September 2008Final - Section B Operating Exam (Folder 3)
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008
IR 05000220/200700330 July 2007IR 05000220-07-003 and 05000410-07-003, on April 1, 2007 Through June 30, 2007, Nine Mile Point Station Units 1 & 2; Refueling and Other Outage Activities
IR 05000220/20060081 December 2006IR 05000220-06-008, 05000410-06-008, on 09/11/2006 - 10/20/2006, Nine Mile Point, Units 1 and 2, ,Component Design Bases Inspection
ML06289012930 September 2006NUREG-1900, Vol 1 Safety Evaluation Report Related to the License Renewal of Nine Mile Point Nuclear Station Units 1 & 2
ML0609701083 April 2006Calvert Cliffs, Nine Mile Point and R. E. Ginna - Generic Letter 2006-02, 60-Day Response
ML04328042010 November 2004Response to NRC Request for Information Regarding the Offsite Power System
ML0303404603 February 2003License Amendment, Diesel Generator Allowed Outage Time. TAC No. MB4612
ML02091007727 March 2002License Amendment Application for the Technical Specification - Extension of Allowed Outage Time for an Inoperable Diesel Generator.
ML17059A28328 April 1994Forwards Rev 6 to USAR for Nine Mile Point Nuclear Station Unit 2.Rev Limited to Editorial Changes & Does Not Update or Change Substantive Info Previously Described in Usar.Next Annual Rev Will Be Submitted in Oct 1994
ML17059A08629 October 1993Forwards Rev 5 to Updated SAR Nine Mile Point Nuclear Station Unit 2 & Nine Mile Point Unit 2 Safety Evaluation Summary Rept 1993.
ML18038A3749 September 1991Rev 1 to Root Cause Rept for Exide UPS 1A,B,C,D & G Trip Event of 910813. Electrical Fault on B Phase Main step-up Transformer Occurred Due to Improper Design.Logic Power Supply for Subj UPS Units to Be Modified
ML18038A3755 September 1991Niagara Mohawk Nine Mile Point Unit 2 Event of 910813.
ML18038A45828 April 1989Forwards Rev 0 to Updated SAR for Nine Mile Point Unit 2. Emergency Plan,Formerly Included in Fsar,Not Included in Updated Sar.Portions of Util Responses to NRC FSAR Questions Incorporated Into Body of Initial Updated SAR
ML17055B52421 June 1985Rev 2 to Interim Operating Procedure N2-IOP-101A, Plant Start Up.
ML17054B51213 May 1985Vols 1 & 2 of Rept of Findings of Independent Review of Key Technical,Interface & Const Concerns.
ML18038A01022 March 1985Forwards Vols 1 & 2 of S&W Rept of Findings of Independent Review of Key Technical,Interface & Const Concerns, Per 850315 Agreement.Audit Plans Also Encl
ML18037A01810 July 1984Control of Heavy Loads at Nine Mile Point Unit 2.