Issue date | Title | |
---|---|---|
IR 05000528/2023002 | 8 August 2023 | Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 |
IR 05000528/2022004 | 30 January 2023 | Integrated Inspection Report 05000528/2022004 and 05000529/2022004 and 05000530/2022004 |
IR 05000520/2022002 | 5 August 2022 | Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002 |
IR 05000528/2021004 | 7 February 2022 | Integrated Inspection Report 05000528/2021004, 05000529/2021004, and 05000530/2021004 |
IR 05000528/2020002 | 31 July 2020 | Integrated Inspection Report 05000528/2020002, 05000529/2020002, and 05000530/2020002 |
ML20114E317 | 23 April 2020 | Final 10 CFR Part 21 Report for Masoneilan Model 8005N Transducer |
IR 05000528/2018004 | 29 January 2019 | NRC Integrated Inspection Report 05000528/2018004, 05000529/2018004, and 05000530/2018004 |
IR 05000528/2018003 | 14 November 2018 | NRC Integrated Inspection Report 05000528/2018003, 05000529/2018003, and 05000530/2018003 |
IR 05000528/2018008 | 16 October 2018 | NRC Biennial Problem Identification and Resolution Inspection Report 05000528/2018008, 05000529/2018008, and 05000530/2018008 |
IR 05000528/2018002 | 6 August 2018 | NRC Integrated Inspection Report 05000528/2018002, 05000529/2018002, and 05000530/2018002 |
ML18138A480 | 18 May 2018 | Response to Request for Additional Information for Risk-Informed Completion Times |
ML18129A448 | 9 May 2018 | APS Response to Request for Additional Information for License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components |
IR 05000528/2018001 | 7 May 2018 | NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001 |
ML17313B159 | 8 January 2018 | Final Accident Sequence Precursor Analysis - Palo Verde Nuclear Generating Station (Unit 3), Emergency Diesel Generator Failure Resulting in a Condition Prohibited by Technical Specifications (LER 530-2016-002-01) - Precursor |
ML17320A193 | 15 November 2017 | NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making |
ML17307A188 | 3 November 2017 | License Amendment Request Supplement for Risk-Informed Completion Times |
ML17200D162 | 19 July 2017 | License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors |
IR 05000528/2017008 | 10 April 2017 | NRC Special Inspection Report 05000528/2017008, 05000529/2017008 and 05000530/2017008 |
ML16365A240 | 30 December 2016 | Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time |
ML16356A689 | 21 December 2016 | Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time |
ML16340A988 | 1 December 2016 | Addendum to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
IR 05000528/2015002 | 13 August 2015 | IR 05000528, 529, 530/2015002; 4/1/15-6/30/15; Palo Verde Units 1, 2 & 3 Integrated Inspection Report, Operability Determinations and Functionality Assessments; Problem Identification and Resolution and Follow-up of Events and Notices of En |
ML15218A300 | 31 July 2015 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times |
IR 05000528/2014004 | 12 November 2014 | IR 05000528/2014004, 05000529/2014004, and 05000530/2014004 on 07/01/2014 - 09/30/2014; Palo Verde Nuclear Generating Station; Operability Determinations/Functionality Assessments, and Component Design Basis Inspection |
IR 05000528/2013009 | 15 April 2014 | IR 05000528-13-009, 05000529-13-009, 05000530-13-009; on 01/13 Through 04/02/2014; Palo Verde Nuclear Generating Station; Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection |
ML13357A218 | 18 December 2013 | Revision 2 to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
IR 05000528/2013003 | 9 August 2013 | IR 05000528-13-003, 05000529-13-003, 05000530-13-003; 04/01/2013 - 06/30/2013; Palo Verde Nuclear Generating Station, Units 1, 2 & 3; Integrated Resident and Regional Report; Operability Evaluation, Identification & Resolution of Problems |
CY-12-009, Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance | 16 May 2013 | Closure Options for Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance |
IR 05000528/2012003 | 10 August 2012 | IR 05000528-12-003, 05000529-12-003 & 05000530-12-003, on 04/01/12 Through 06/30/12, Palo Verde Nuclear Generating Station, Units 1, 2, & 3 |
ML12229A125 | 3 August 2012 | Request for Additional Information, Review of Single Failure Analysis of Low Pressure Safety Injection Pumps for Minimum Required Refueling Water Tank (RWT) Transfer Volume |
ML12229A119 | 3 August 2012 | Attachment 4, PVNGS Engineering Study 13-ES-A037, Revision 0, Fault Tree Analysis and Reliability Evaluation for Low Pressure Safety Injection (LPSI) Pump Trip at the Recirculation Actuation Signal (RAS) |
IR 05000528/2011004 | 10 November 2011 | IR 05000528-11-004, 05000529-11-004, 05000530-11-004; 07/01/2011 - 09/30/2011; Palo Verde Nuclear Generating Station, Integrated Resident and Regional Report; Maint. Effect.; Op. Evals; and Ident. and Resolution of Problems |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
ML103560149 | 31 January 2011 | NUREG-1437 Supplement 43, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station, Final Report. |
ML110070822 | 28 January 2011 | Final Plant-Specific Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station |
ML103630728 | 10 January 2011 | Letter Final Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station |
ML103640168 | 6 January 2011 | Notice of Availability of the Final Plant-Specific Supplement 43 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station |
ML102180167 | 31 August 2010 | NUREG-1437 Supplement 43, Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palo Verde Nuclear Generating Station (Draft for Comment) |
ML101880263 | 24 June 2010 | Request for Additional Information Response on Request to Amend Technical Specification 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter |
ML093230225 | 10 November 2009 | Response to September 30, 2009, Request for Additional Information Regarding Severe Accident Mitigation Alternatives for the Review of the PVNGS License Renewal Application, and License Renewal Application Amendment No. 2 |
ML092810227 | 28 September 2009 | Request to Amend Technical Specification (TS) 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter |
IR 05000528/2009002 | 5 May 2009 | IR 05000528-09-002, 05000529-09-002 & 05000530-09-002 on 01/01/09 - 03/31/09 for Palo Verde |
ML090830334 | 13 March 2009 | Revision 1 to Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
ML083430549 | 16 December 2008 | Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors |
IR 05000528/2008004 | 12 November 2008 | IR 05000528-08-004, 05000529-08-004, and 05000530-08-004 on 07/01/08 - 09/30/08 for Palo Verde |
ML080710546 | 29 February 2008 | Palo Verde Nuclear Generating Station (Pvngs), Units 1, 2, and 3, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor |
IR 05000528/2007005 | 4 February 2008 | IR 05000528-07-005, 05000529-07-005, 05000530-07-005 on 10/01/2007 - 12/31/2007 for Palo Verde, Units 1,2, & 3, Integrated Resident and Regional Report Maintenance Effectiveness, Operability Eval., Access Control to Radiological Areas, ALAR |
IR 05000528/2007002 | 26 April 2007 | IR 050000528-07-002, 05000529-07-002, & 05000530-07-002; 01/01/2007 Through 03/31/2007; Palo Verde Nuclear Generating Stations, Units 1, 2, & 3, Integrated Inspection |
ML063600175 | 22 December 2006 | Final Significance Determination |
IR 05000528/2006013 | 22 December 2006 |