ML23200A183 | 3 August 2023 | Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML21071A105 | 18 March 2021 | Transmittal of Final North Anna Power Station, Unit 1 - Accident Sequence Precursor Report (Licensee Event Report 338-20-001) |
ML21071A106 | 2 March 2021 | Final ASP Analysis - North Anna 1 Degraded Upper Piston Pin Bushing (LER 338-20-001)(Enclosure) |
ML21056A557 | 25 February 2021 | NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response |
IR 05000338/2020003 | 5 November 2020 | Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion |
ML20309A608 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
IR 05000338/2019010 | 13 August 2019 | Reissue - North Anna Power Station, Units 1 & 2 - Design Basis Assurance Inspection (Programs) Inspection Report 05000338/2019010 and 05000339/2019010 |
ML19225D130 | 8 August 2019 | Response to Request for Additional Information (Follow-Up) Regarding Open Phase Protection Per NRC Bulletin 2012-01 - Proposed License Amendment Request |
ML19199A178 | 18 July 2019 | Design Basis Assurance Inspection (Teams) Inspection Report 05000338/2019010 and 05000339/2019010 |
ML18334A106 | 19 November 2018 | Amendment for Flood Protection Dike Modification |
IR 05000338/2018002 | 6 August 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000338/2018002 and 05000339/2018002 |
ML18093A445 | 28 March 2018 | Ad 2, Response to 03/12/2012 Information Request Seismic Probabilistic Risk Assessment for Recommendation 2.1 |
ML20311A501 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17241A045 | 24 August 2017 | Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information |
ML17033B525 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 6 |
IR 05000338/2015003 | 12 November 2015 | IR 05000338/2015003 and 05000339/2015003, July 1, 2015 Through September 30, 2015, North Anna Power Station, Units 1 & 2, Routine Integrated Inspection Report |
IR 05000338/2015002 | 6 August 2015 | IR 05000338/2015002, 05000339/2015002; on 04/01/2015 - 06/30/2015; North Anna Power Station, Units 1 and 2, Maintenance Effectiveness |
ML13141A278 | 15 May 2013 | NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Generic Safety Issue (GSI)-191 Closure Option and Tempmat Insulation.. |
ML13045A124 | 26 February 2013 | Final Accident Sequence Precursor Analysis Results |
IR 05000338/2012007 | 25 September 2012 | IR 05000338-12-007 & 05000339-12-007, 05/21/2012 - 08/15/2012; North Anna Power Station - NRC Component Design Bases Inspection |
ML12005A039 | 2 September 2011 | E-mail from G. Kolcum, Region II to S. Walker, Region II, Et Al; EDG New Info (Fuel Oil Line Rub) Discovered Last Night |
ML102571627 | 1 November 2010 | Issuance of Amendments 260 & 241 Regarding Change to Technical Specification (TS) 3.7.12, Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System (Preacs) |
ML102180072 | 7 July 2010 | Additional Clarification for Preacs |
ML102180069 | 6 July 2010 | Response to Precas Clarification Concerns from Phone Call |
ML092820155 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 6, Engineered Safety Features |
ML092730468 | 28 September 2009 | Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements |
ML091761047 | 5 August 2009 | ECCS Preacs Filtration Presentation |
ML092050381 | 23 July 2009 | License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem |
ML090641038 | 27 February 2009 | Updated Supplemental Response to NRC Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML090210279 | 15 January 2009 | Proposed License Amendment Request TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements |
ML080650563 | 29 February 2008 | Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML073520247 | 17 December 2007 | Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating |
ML072740400 | 15 November 2007 | Corrective Actions for Generic Letter 2004-02 |
ML060690008 | 9 March 2006 | IR 05000338-05-004, & IR 0500339-05-004, - North Anna Power Station Units 1 & 2, Response to Disputed Minor Violation and Four Cross-cutting Aspects Contained in NRC Integrated |
ML060370463 | 9 February 2006 | RAI, Response to GL-2004-02, Potential Impact to Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
ML053540268 | 9 December 2005 | Response to NRC Inspection Report Nos. 05000338-05-004 & 05000339-05-04 |
ML053080050 | 3 November 2005 | Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a |
ML053050395 | 28 October 2005 | IR 05000338-05-004, IR 05000339-05-004; 07/01/2005 - 09/30/2005; North Anna Power Station Units 1 & 2. Routine Integrated Resident and Regional Report. Maintenance Effectiveness - Biennial Assessment. Emergency Preparedness Baseline. Radiat |
ML043560331 | 17 December 2004 | Proposed Technical Specifications Change Request Increased ECCS-LHSI. AFW, Quench Spray and Chemical Addition Systems Completion Times |
ML042050457 | 23 July 2004 | Proposed Emergency Technical Specification Change One Time Extension of the Completion Time for the Low Head Safety Injection (Lhsi) Train a |
ML023600217 | 13 December 2002 | Proposed Risk-Informed Technical Specifications Change Extended Inverter Allowed Outage Time |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) |
ML20094D013 | 25 October 1995 | Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability |
ML20101E149 | 31 August 1995 | TER on Individual Plant Exam Front End Analysis |
ML20105A900 | 31 August 1992 | Rev 2 to PRA North Anna Power Station Svc Water Preservation Project,Part One, Final Rept |
ML18149A159 | 16 May 1986 | Transmits,For Concurrence,Proposed Test Protocol for Demonstrating Acceptability of Using 35% Oxygen Enriched Breathing Air W/Open Circuit self-contained Breathing Apparatus.Concurrence Requested by 860731 |
ML20112J587 | 31 March 1985 | Rev 1 to North Anna Power Station Svc Water Sys Probabilistic Safety Assessment |
ML20112J581 | 29 March 1985 | Application for Amends to Licenses NPF-4 & NPF-7,revising Tech Spec 3.7.4.1 to Extend Allowable Time for Inoperability of Redundant Svc Water Headers Beyond 72 H to Facilitate Mod & Maint Activities.Fee Paid |