Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML24250A106 | 6 September 2024 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) |
ML23114A252 | 28 April 2023 | Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI |
ML23110A256 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML23173A056 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted |
ML23062A420 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Chapter 10, Sections 1 Thru 24 (Redacted) |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML22236A670 | 30 August 2022 | Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1, |
ML22094A001 | 15 April 2022 | Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) |
ML21333A153 | 30 November 2021 | Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval |
ML21230A206 | 3 September 2021 | Proposed Alternative to Use ASME OM Code Case OMN-28 |
NMP1L3420, Proposed Alternative to Implement Code Case OMN-28 | 5 August 2021 | Proposed Alternative to Implement Code Case OMN-28 |
ML21216A220 | 5 August 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting |
ML21166A168 | 25 June 2021 | |
ML21139A185 | 22 June 2021 | Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting |
ML21117A044 | 26 April 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting |
ML21110A680 | 23 April 2021 | Approval of One-Time Alternative to Flaw Characterization and Removal Requirements for N-16A Nozzle |
ML21077A177 | 8 April 2021 | Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) |
JAFP-21-0014, Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs | 3 March 2021 | Exemption Request to Extend the 10-Year ASME Code Updates for the Inservice Inspection, Containment Inservice Inspection, and Inservice Testing Programs |
ML21062A065 | 1 March 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting |
ML21028A673 | 3 February 2021 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 |
ML21005A061 | 14 January 2021 | Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) |
ML20351A283 | 18 December 2020 | Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs |
ML20323A033 | 1 December 2020 | Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs |
ML20317A110 | 12 November 2020 | Commission Memorandum and Order (CLI-20-11) |
ML20269A200 | 30 September 2020 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a |
RS-20-111, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 2 September 2020 | Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
RS-20-110, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 2 September 2020 | Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI |
ML20232A171 | 1 September 2020 | Request to Use Alternative Code Case OMN-26 |
ML20188A264 | 6 July 2020 | Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information |
ML20153A704 | 1 June 2020 | NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 |
ML20099D955 | 17 April 2020 | Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations |
ML20097D644 | 14 April 2020 | Issuance of Relief Request Limited Examination Coverage During Fourth 10-Year Inservice Inspection Interval |
ML20024G429 | 4 March 2020 | Record of Decision - Issuance of Subsequent Renewed Facility Operation License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 |
ML19350A015 | 19 December 2019 | Correction to Relief Request I5R-10 Dated December 2, 2019, Errors Introduced During the Issuance of Relief from the ASME Code Dated December 2, 2019 |
ML19330C644 | 2 December 2019 | Issuance of Relief Request Examination of Standby Liquid Control Nozzle Inside Radius Section in Lieu of Specific ASME Code Requirements |
ML19280D820 | 31 October 2019 | Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 |
ML19276J746 | 3 October 2019 | NRC Staff Answer to Beyond Nuclear Inc.'S: Motion for Leave to File New Contention Based on Draft Supplement to Generic Environmental Impact Statement; and Motion to Reopen the Record and for Consideration of Arguments Out of Time |
ML19276F613 | 3 October 2019 | Exelon'S Answer Opposing Beyond Nuclear'S Motion for Leave to File a New Contention and Motion to Reopen the Record |
ML19269C534 | 27 September 2019 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques |
ML19205A206 | 24 September 2019 | Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review |
ML19241A377 | 29 August 2019 | Answer Opposing Beyond Nuclear'S Motion to File a Reply Brief |
ML19182A006 | 28 August 2019 | Issuance of Amendment Nos. 327 and 330 Reduce High Pressure Service Water System Design Pressure and Temporarily Extend Completion Times |
ML19231A473 | 19 August 2019 | Beyond Nuclear Reply Brief on Appeal of LBP-19-05 |
ML19231A477 | 19 August 2019 | Beyond Nuclear Reply Brief on Appeal of LBP-19-05 (Refiled) |
ML19221B738 | 9 August 2019 | NRC Staff Brief in Opposition to Beyond Nuclear Appeal of LBP-19-05 |
ML19221B535 | 9 August 2019 | Exelon'S Brief in Opposition to Beyond Nuclear'S Appeal of LBP-19-05 |
ML19210D453 | 31 July 2019 | NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 |
ML19192A244 | 18 July 2019 | Proposed Alternative to Use ASME Code Cases N-878 and N-880 |
ML19196A372 | 15 July 2019 | Beyond Nuclear'S Brief on Appeal of LBP-19-05 |