Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21272A3381 April 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report
ML17226A12528 July 2017Revision 25 to the Updated Safety Analysis Report, Chapter 3, Tables 3.2-1 Through 3.11-14
RBG-47776, Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B28 July 2017Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B
RBG-47618, Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 129 September 2015Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 1
RBG-47570, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation18 May 2015Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation
ML14177A64527 June 2014Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20144 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML14051A6714 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML13365A28125 February 2014Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML14056A16725 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for River Bend Station, Unit 1(PUBLIC)
RBG-47329, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
IR 05000458/200501619 January 2006IR 05000458-05-016; IR 07200049-05-005, on 12/11-20/2005 and 12/28-29/2005, Entergy Operations, Inc
RBG-46211, Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01, Revision 4 Methodology - LAR 2003-02719 December 2003Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01, Revision 4 Methodology - LAR 2003-027
RBG-31174, Application for Amend to License NPF-47,revising License Condition 2.C.14,Attachment 5 Re Emergency Response Capabilities,Requiring Implementation of Reg Guide 1.97 Mods to Neutron Monitoring Sys28 June 1989Application for Amend to License NPF-47,revising License Condition 2.C.14,Attachment 5 Re Emergency Response Capabilities,Requiring Implementation of Reg Guide 1.97 Mods to Neutron Monitoring Sys
RBG-27979, Application for Amend to License NPF-47,revising License Condition 2.C.14 Re Reg Guide 1.97 Mods.Proposed Revs & Justifications Encl.Fee Paid25 May 1988Application for Amend to License NPF-47,revising License Condition 2.C.14 Re Reg Guide 1.97 Mods.Proposed Revs & Justifications Encl.Fee Paid
ML20236Q4679 November 1987Discusses Util 870902 Special Rept Re Inoperable Status of Seismic Monitor 1ERS-NBE1B.Util Requested to Review Plant Procedures That Apply in Case of OBE Excedance & Verify That Procedures Consistent w/10CFR100,App a
RBG-24546, Special Rept:On 870724,seismic Monitor 1ERS-NBE1B Declared Inoperable When Surveillance Interval Expired Per Tech Spec 4.0.3 & Action Statement Entered.Monitor Will Still Register Seismic Events.No Such Events Have Occurred at Facility2 September 1987Special Rept:On 870724,seismic Monitor 1ERS-NBE1B Declared Inoperable When Surveillance Interval Expired Per Tech Spec 4.0.3 & Action Statement Entered.Monitor Will Still Register Seismic Events.No Such Events Have Occurred at Facility
ML20114D14731 August 1987Package Consisting of Chapters 9 & 11 to Facility USARs
ML20135G49811 September 1985Transcript of ACRS Subcommittee on River Bend Station 850911 Meeting in Washington,Dc.Pp 1-197.Related Info Encl
ML19253A56031 July 1979IEEE Std 323 - 974 Qualification Test Plan for 125-Volt Battery Chargers - Standby.