Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21278A188 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, Operating Control Stations |
ML21257A282 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment, Table of Contents |
ML22115A045 | 7 September 2021 | 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted |
ML20335A081 | 18 November 2020 | Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 3, Principal Design Criteria |
ML20335A082 | 18 November 2020 | Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 2, Site Characteristics |
ML20335A083 | 18 November 2020 | Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 13, NUHOMS-32P Dry Shielded Canister |
ML20335A095 | 18 November 2020 | Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 8, Accident Analyses |
ML20335A096 | 18 November 2020 | Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 12, NUHOMS(R)-32P Dry Shielded Canister |
ML19072A096 | 11 March 2019 | Information Regarding Dissimilar Metal Weld 2-CV-2005-30 Flaw Characteristic and Repair Weld Overlay |
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure | 26 May 2016 | Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure |
ML15133A144 | 23 July 2015 | Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves |
ML15026A532 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 3 - Principal Design Criteria |
ML15026A531 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 2 - Site Characteristics |
ML15026A527 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 12 - NUHOMS-32P Dry Shielded Canister |
ML15026A537 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 8 - Accident Analyses |
ML15026A651 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23, Figure 2.6-10, Response Spectra Design Basis Earthquake. |
ML14279A565 | 6 November 2014 | Relief Request RR-ISI-04-09 Regarding Saltwater System Piping Repair |
ML14274A498 | 25 July 2014 | Redacted - Calvert Cliffs, Units 1 & 2 - Request for Supplemental Information - Amendment Request No. 11 to Materials License No. SNM-2505 for Specific Independent Spent Fuel Storage Installation- Acceptance Review |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. |
ML13319B080 | 14 November 2013 | Proposed 10 CFR 50.55a Request for Repair of Saltwater Piping Leak (RR-ISI-04-09) |
ML13073A155 | 8 March 2013 | Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML13074A056 | 8 March 2013 | Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13066A172 | 28 February 2013 | R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML12275A426 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 2, Site Characteristics |
ML12275A427 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 3, Principal Design Criteria |
ML12275A432 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 8, Accident Analyses |
ML12275A436 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 12, NUHOMS-32P Dry Shielded Canister |
ML11269A077 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Site Characteristics |
ML11269A078 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 3, Principal Design Criteria |
ML11269A083 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 8, Accident Analyses |
ML11269A088 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 12, NUHOMS-32P Dry Shielded Canister |
ML12038A135 | 29 August 2011 | Email from G. Kulesa, NRR to P. Boyle, NRR FW: Request for Assistance - Confirmation That OBE Was Not Exceeded at Surry and Calvert Cliffs |
ML110700381 | 1 February 2011 | Independent Spent Fuel Storage Installation, OI-35, Radiation Monitoring System, Rev. 31. Part 13 of 13 |
ML110700356 | 1 February 2011 | Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13 |
ML102590455 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 8, Accident Analyses - Page 8.4.3 |
ML102600390 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Figure 2.6-10, Response Spectra Design Basis Earthquake. |
ML102590476 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 12, Table of Contents - Pages 12-1 Thur 12.12-3 |
ML102590426 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 3, Principal Design Criteria - Page 3.7.3 |
ML102590423 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Site Characteristics - Page 2.8.2 |
ML060190021 | 16 January 2006 | Class 1 Piping Operability Evaluation Submittal Per Code Requirements |
ML20195E658 | 16 November 1998 | Forwards Response to NRC 980903 RAI Re Integrated Plant Assessment Rept for Svc Water Sys,Per License Renewal.Errata to Section 5.17,encl |
ML20151Y138 | 3 September 1998 | Forwards Request for Addl Info for Review of Units 1 & 2 Integrated Plant Assessment Rept for Svc Water Sys |
IR 05000317/1997001 | 15 April 1997 | Insp Repts 50-317/97-01 & 50-318/97-01 on 970119-0301.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
ML20113E349 | 31 May 1996 | USI A-46 Seismic Evaluation |
ML20113E355 | 30 November 1995 | USI A-46 Relay Evaluation |
ML20071N650 | 2 August 1994 | Forwards Response to NRC 940617 RAI Re Alternate Ac Power Design Rept.W/Five Oversize Drawings |
ML20064G809 | 7 March 1994 | Forwards Info on How Alternate Ac Source Meets Criteria in NUMARC 87-00,App B,Per Commitment in 930707 Mod to SBO Response.Addl Info Re Design of Alternate Ac Source Also Encl |
ML20063L283 | 18 February 1994 | Forwards Corrections to Erroneous Info Supplied in 930401 License Amend Request Re Onsite Power Distribution Sys,Ac Distribution - Operating |
IR 05000317/1993031 | 27 December 1993 | Insp Repts 50-317/93-31 & 50-318/93-31 on 931115-19. Violations Noted.Major Areas Inspected:Svc Water Sys & Component Cooling Sys |