Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21278A1887 September 20212 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, Operating Control Stations
ML21257A2827 September 20212 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment, Table of Contents
ML22115A0457 September 20212 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted
ML20335A08118 November 2020Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 3, Principal Design Criteria
ML20335A08218 November 2020Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 2, Site Characteristics
ML20335A08318 November 2020Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 13, NUHOMS-32P Dry Shielded Canister
ML20335A09518 November 2020Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 8, Accident Analyses
ML20335A09618 November 2020Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 12, NUHOMS(R)-32P Dry Shielded Canister
ML19072A09611 March 2019Information Regarding Dissimilar Metal Weld 2-CV-2005-30 Flaw Characteristic and Repair Weld Overlay
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure
ML15133A14423 July 2015Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves
ML15026A5327 January 2015Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 3 - Principal Design Criteria
ML15026A5317 January 2015Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 2 - Site Characteristics
ML15026A5277 January 2015Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 12 - NUHOMS-32P Dry Shielded Canister
ML15026A5377 January 2015Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 8 - Accident Analyses
ML15026A6517 January 2015Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23, Figure 2.6-10, Response Spectra Design Basis Earthquake.
ML14279A5656 November 2014Relief Request RR-ISI-04-09 Regarding Saltwater System Piping Repair
ML14274A49825 July 2014Redacted - Calvert Cliffs, Units 1 & 2 - Request for Supplemental Information - Amendment Request No. 11 to Materials License No. SNM-2505 for Specific Independent Spent Fuel Storage Installation- Acceptance Review
ML14099A19631 March 2014Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.
ML13319B08014 November 2013Proposed 10 CFR 50.55a Request for Repair of Saltwater Piping Leak (RR-ISI-04-09)
ML13073A1558 March 2013Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13074A0568 March 2013Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13066A17128 February 2013R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13066A17228 February 2013R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML12275A42618 September 2012Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 2, Site Characteristics
ML12275A42718 September 2012Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 3, Principal Design Criteria
ML12275A43218 September 2012Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 8, Accident Analyses
ML12275A43618 September 2012Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 12, NUHOMS-32P Dry Shielded Canister
ML11269A0778 September 2011Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Site Characteristics
ML11269A0788 September 2011Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 3, Principal Design Criteria
ML11269A0838 September 2011Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 8, Accident Analyses
ML11269A0888 September 2011Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 12, NUHOMS-32P Dry Shielded Canister
ML12038A13529 August 2011Email from G. Kulesa, NRR to P. Boyle, NRR FW: Request for Assistance - Confirmation That OBE Was Not Exceeded at Surry and Calvert Cliffs
ML1107003811 February 2011Independent Spent Fuel Storage Installation, OI-35, Radiation Monitoring System, Rev. 31. Part 13 of 13
ML1107003561 February 2011Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13
ML1025904559 September 2010Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 8, Accident Analyses - Page 8.4.3
ML1026003909 September 2010Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Figure 2.6-10, Response Spectra Design Basis Earthquake.
ML1025904769 September 2010Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 12, Table of Contents - Pages 12-1 Thur 12.12-3
ML1025904269 September 2010Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 3, Principal Design Criteria - Page 3.7.3
ML1025904239 September 2010Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Site Characteristics - Page 2.8.2
ML06019002116 January 2006Class 1 Piping Operability Evaluation Submittal Per Code Requirements
ML20195E65816 November 1998Forwards Response to NRC 980903 RAI Re Integrated Plant Assessment Rept for Svc Water Sys,Per License Renewal.Errata to Section 5.17,encl
ML20151Y1383 September 1998Forwards Request for Addl Info for Review of Units 1 & 2 Integrated Plant Assessment Rept for Svc Water Sys
IR 05000317/199700115 April 1997Insp Repts 50-317/97-01 & 50-318/97-01 on 970119-0301.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
ML20113E34931 May 1996USI A-46 Seismic Evaluation
ML20113E35530 November 1995USI A-46 Relay Evaluation
ML20071N6502 August 1994Forwards Response to NRC 940617 RAI Re Alternate Ac Power Design Rept.W/Five Oversize Drawings
ML20064G8097 March 1994Forwards Info on How Alternate Ac Source Meets Criteria in NUMARC 87-00,App B,Per Commitment in 930707 Mod to SBO Response.Addl Info Re Design of Alternate Ac Source Also Encl
ML20063L28318 February 1994Forwards Corrections to Erroneous Info Supplied in 930401 License Amend Request Re Onsite Power Distribution Sys,Ac Distribution - Operating
IR 05000317/199303127 December 1993Insp Repts 50-317/93-31 & 50-318/93-31 on 931115-19. Violations Noted.Major Areas Inspected:Svc Water Sys & Component Cooling Sys